{"objectIdFieldName":"OGC_FID","globalIdFieldName":"","geometryType":"esriGeometryMultipoint","spatialReference":{"wkid":4326,"latestWkid":4326},"fields":[{"name":"OBJECTID","type":"esriFieldTypeDouble","alias":"OBJECTID","nullable":true},{"name":"OGC_FID","type":"esriFieldTypeOID","alias":"OGC_FID","nullable":false},{"name":"id","type":"esriFieldTypeString","alias":"id","length":255,"nullable":true},{"name":"objectid_1","type":"esriFieldTypeInteger","alias":"objectid_1","nullable":true},{"name":"projecttype","type":"esriFieldTypeString","alias":"projecttype","length":255,"nullable":true},{"name":"projectcentroid_id","type":"esriFieldTypeString","alias":"projectcentroid_id","length":255,"nullable":true},{"name":"region_id","type":"esriFieldTypeString","alias":"region_id","length":255,"nullable":true},{"name":"amana_id","type":"esriFieldTypeString","alias":"amana_id","length":255,"nullable":true},{"name":"sector_id","type":"esriFieldTypeString","alias":"sector_id","length":255,"nullable":true},{"name":"governorate_id","type":"esriFieldTypeString","alias":"governorate_id","length":255,"nullable":true},{"name":"city_id","type":"esriFieldTypeString","alias":"city_id","length":255,"nullable":true},{"name":"municipality_id","type":"esriFieldTypeString","alias":"municipality_id","length":255,"nullable":true},{"name":"datasource","type":"esriFieldTypeString","alias":"datasource","length":255,"nullable":true},{"name":"description","type":"esriFieldTypeString","alias":"description","length":255,"nullable":true},{"name":"contractnumber","type":"esriFieldTypeString","alias":"contractnumber","length":255,"nullable":true},{"name":"contractboundary","type":"esriFieldTypeString","alias":"contractboundary","length":255,"nullable":true},{"name":"contractor","type":"esriFieldTypeString","alias":"contractor","length":255,"nullable":true},{"name":"projectnumber","type":"esriFieldTypeString","alias":"projectnumber","length":255,"nullable":true},{"name":"sde.poprojectcentroidp.area","type":"esriFieldTypeString","alias":"sde.poprojectcentroidp.area","length":255,"nullable":true},{"name":"approvedby","type":"esriFieldTypeString","alias":"approvedby","length":255,"nullable":true},{"name":"projectname_ar","type":"esriFieldTypeString","alias":"projectname_ar","length":255,"nullable":true},{"name":"projectname_en","type":"esriFieldTypeString","alias":"projectname_en","length":255,"nullable":true},{"name":"consultant","type":"esriFieldTypeString","alias":"consultant","length":255,"nullable":true},{"name":"dateofstartcontract","type":"esriFieldTypeDouble","alias":"dateofstartcontract","nullable":true},{"name":"dateofendcontract","type":"esriFieldTypeDouble","alias":"dateofendcontract","nullable":true},{"name":"duration","type":"esriFieldTypeString","alias":"duration","length":255,"nullable":true},{"name":"zonetype","type":"esriFieldTypeString","alias":"zonetype","length":255,"nullable":true},{"name":"district_id","type":"esriFieldTypeString","alias":"district_id","length":255,"nullable":true},{"name":"projectbudget","type":"esriFieldTypeDouble","alias":"projectbudget","nullable":true},{"name":"dateofstart","type":"esriFieldTypeDouble","alias":"dateofstart","nullable":true},{"name":"dateofend","type":"esriFieldTypeDouble","alias":"dateofend","nullable":true},{"name":"designed","type":"esriFieldTypeString","alias":"designed","length":255,"nullable":true},{"name":"transactionnumber","type":"esriFieldTypeString","alias":"transactionnumber","length":255,"nullable":true},{"name":"streetname","type":"esriFieldTypeString","alias":"streetname","length":255,"nullable":true},{"name":"siteobserve","type":"esriFieldTypeString","alias":"siteobserve","length":255,"nullable":true},{"name":"submunicipality_id","type":"esriFieldTypeString","alias":"submunicipality_id","length":255,"nullable":true},{"name":"elevation","type":"esriFieldTypeDouble","alias":"elevation","nullable":true},{"name":"subcontractor","type":"esriFieldTypeString","alias":"subcontractor","length":255,"nullable":true},{"name":"projectstatus","type":"esriFieldTypeInteger","alias":"projectstatus","nullable":true},{"name":"projectcentroid_unified_id","type":"esriFieldTypeString","alias":"projectcentroid_unified_id","length":255,"nullable":true},{"name":"globalid","type":"esriFieldTypeString","alias":"globalid","length":255,"nullable":true},{"name":"dataowner","type":"esriFieldTypeString","alias":"dataowner","length":255,"nullable":true},{"name":"created_user","type":"esriFieldTypeString","alias":"created_user","length":255,"nullable":true},{"name":"created_date","type":"esriFieldTypeDouble","alias":"created_date","nullable":true},{"name":"last_edited_user","type":"esriFieldTypeString","alias":"last_edited_user","length":255,"nullable":true},{"name":"last_edited_date","type":"esriFieldTypeDouble","alias":"last_edited_date","nullable":true},{"name":"amanatracking","type":"esriFieldTypeString","alias":"amanatracking","length":255,"nullable":true},{"name":"amanabaladi","type":"esriFieldTypeString","alias":"amanabaladi","length":255,"nullable":true},{"name":"municipalitybaladi","type":"esriFieldTypeString","alias":"municipalitybaladi","length":255,"nullable":true},{"name":"districtbaladi","type":"esriFieldTypeString","alias":"districtbaladi","length":255,"nullable":true}],"exceededTransferLimit":true,"features":[{"attributes":{"OBJECTID":0,"OGC_FID":0,"amana_id":"00503","amanabaladi":"006001","amanatracking":"  \\\\  ","approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":null,"created_date":1621480412000,"created_user":"FME","dataowner":"أمانة المنطقة الشرقية FME","datasource":null,"dateofend":null,"dateofendcontract":null,"dateofstart":null,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"005031002","districtbaladi":"1594","duration":null,"elevation":null,"globalid":"{C1B86618-9DD1-41CF-85CE-58BC4E07DE86}","governorate_id":"00501","id":"planning-and-land-and-cadastre_aBX49465980.1","last_edited_date":1622631074000,"last_edited_user":"MTHABET","municipality_id":"005031","municipalitybaladi":"006001006","objectid_1":25921,"projectbudget":null,"projectcentroid_id":null,"projectcentroid_unified_id":null,"projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"005","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[50.0973,26.4006]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1,"OGC_FID":1,"amana_id":"00503","amanabaladi":"006001","amanatracking":"  \\\\  ","approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":null,"created_date":1621480412000,"created_user":"FME","dataowner":"أمانة المنطقة الشرقية FME","datasource":null,"dateofend":null,"dateofendcontract":null,"dateofstart":null,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"005031002","districtbaladi":"1594","duration":null,"elevation":null,"globalid":"{418B0199-2D02-41B9-BE42-9AC22A86B8A4}","governorate_id":"00501","id":"planning-and-land-and-cadastre_aBX49465980.2","last_edited_date":1622631074000,"last_edited_user":"MTHABET","municipality_id":"005031","municipalitybaladi":"006001006","objectid_1":25922,"projectbudget":null,"projectcentroid_id":null,"projectcentroid_unified_id":null,"projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"005","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[50.0973,26.4006]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":2,"OGC_FID":2,"amana_id":"00503","amanabaladi":"006001","amanatracking":"  \\\\  ","approvedby":null,"city_id":null,"consultant":"ارابتك","contractboundary":null,"contractnumber":null,"contractor":"شركة صينوبك انترناشيونال بتروليوم سيرفيس كوربوريشن","created_date":1621480412000,"created_user":"FME","dataowner":"أمانة المنطقة الشرقية FME","datasource":null,"dateofend":null,"dateofendcontract":null,"dateofstart":null,"dateofstartcontract":null,"description":"سيتم عمل ايقاف جزئى بتاريخ 8/11/1436 بسبب نقل الخدمات STC & 63 KV Cable","designed":null,"district_id":"005031040","districtbaladi":"1664","duration":"24","elevation":null,"globalid":"{87090567-0BF7-4B18-8CD3-2C06073ADC92}","governorate_id":"00501","id":"planning-and-land-and-cadastre_aBX49465980.3","last_edited_date":1622631074000,"last_edited_user":"MTHABET","municipality_id":"005031","municipalitybaladi":"006001005","objectid_1":25923,"projectbudget":243058109.357,"projectcentroid_id":"019/006/001/402800000/3111311","projectcentroid_unified_id":null,"projectname_ar":"تقاطع الملك عبد العزيز و شارع 28","projectname_en":null,"projectnumber":null,"projectstatus":4,"projecttype":null,"region_id":"005","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[50.0807,26.4502]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":3,"OGC_FID":3,"amana_id":"00503","amanabaladi":"006001","amanatracking":"  \\\\  ","approvedby":null,"city_id":null,"consultant":"ارابتك","contractboundary":null,"contractnumber":null,"contractor":"شركة شيد المحدودة","created_date":1621480412000,"created_user":"FME","dataowner":"أمانة المنطقة الشرقية FME","datasource":null,"dateofend":null,"dateofendcontract":null,"dateofstart":null,"dateofstartcontract":null,"description":"تم ايقاف المشروع كليا بتاريخ و تم استئناف العمل بتاريخ","designed":null,"district_id":"005031018","districtbaladi":"1606","duration":"24","elevation":null,"globalid":"{61F1AED3-84B4-43A8-A028-1159EE5F593D}","governorate_id":"00501","id":"planning-and-land-and-cadastre_aBX49465980.4","last_edited_date":1622631074000,"last_edited_user":"MTHABET","municipality_id":"005031","municipalitybaladi":"006001006","objectid_1":25924,"projectbudget":125745312.6075,"projectcentroid_id":"019/006/001/409760000/3111311","projectcentroid_unified_id":null,"projectname_ar":"نفق الامام علي بن ابي طالب مع طريق الامير محمد بن فهد-الدمام","projectname_en":null,"projectnumber":null,"projectstatus":4,"projecttype":null,"region_id":"005","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[50.1103,26.4112]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":4,"OGC_FID":4,"amana_id":"00503","amanabaladi":"006001","amanatracking":"  \\\\  ","approvedby":null,"city_id":null,"consultant":"زهير فايز","contractboundary":null,"contractnumber":null,"contractor":"شركة مقاول جزيرة العرب","created_date":1621480412000,"created_user":"FME","dataowner":"أمانة المنطقة الشرقية FME","datasource":null,"dateofend":null,"dateofendcontract":null,"dateofstart":null,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"005040013","districtbaladi":"1591","duration":"24","elevation":null,"globalid":"{14B92CC2-C5FE-48DD-97F7-6FA4A8716882}","governorate_id":"00501","id":"planning-and-land-and-cadastre_aBX49465980.5","last_edited_date":1622631074000,"last_edited_user":"MTHABET","municipality_id":"005040","municipalitybaladi":"006001004","objectid_1":25925,"projectbudget":34647245.885,"projectcentroid_id":"19/006/001/601/07/00/4","projectcentroid_unified_id":null,"projectname_ar":"سفلته وارصفة بالظهران والخبر الجزء 13","projectname_en":null,"projectnumber":null,"projectstatus":2,"projecttype":null,"region_id":"005","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[50.1506,26.3345]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":5,"OGC_FID":5,"amana_id":"00503","amanabaladi":"006001","amanatracking":"  \\\\  ","approvedby":null,"city_id":null,"consultant":"زهير فايز","contractboundary":null,"contractnumber":null,"contractor":"مؤسسة سبأ للمقاولات","created_date":1621480412000,"created_user":"FME","dataowner":"أمانة المنطقة الشرقية FME","datasource":null,"dateofend":null,"dateofendcontract":null,"dateofstart":null,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"005031014","districtbaladi":"1671","duration":"9","elevation":null,"globalid":"{81EF9857-4D14-4D17-BAE8-FB649DA3067D}","governorate_id":"00501","id":"planning-and-land-and-cadastre_aBX49465980.6","last_edited_date":1622631074000,"last_edited_user":"MTHABET","municipality_id":"005031","municipalitybaladi":"006001005","objectid_1":25926,"projectbudget":2441483.21,"projectcentroid_id":"019/006/001/406079901/311121","projectcentroid_unified_id":null,"projectname_ar":"استكمال ترميم مبنى ادارة الرقابة و الاسواق بحي البادية","projectname_en":null,"projectnumber":null,"projectstatus":2,"projecttype":null,"region_id":"005","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[50.0909,26.429]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":6,"OGC_FID":6,"amana_id":"00503","amanabaladi":"006001","amanatracking":"  \\\\  ","approvedby":null,"city_id":null,"consultant":"زهير فايز","contractboundary":null,"contractnumber":null,"contractor":"مؤسسة عابد على الحبشى للمقاولات","created_date":1621480412000,"created_user":"FME","dataowner":"أمانة المنطقة الشرقية FME","datasource":null,"dateofend":null,"dateofendcontract":null,"dateofstart":null,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"005031049","districtbaladi":"1599","duration":"12","elevation":null,"globalid":"{0A9F77F7-6F4E-4349-9197-CD8DD51FBFB3}","governorate_id":"00501","id":"planning-and-land-and-cadastre_aBX49465980.7","last_edited_date":1622631074000,"last_edited_user":"MTHABET","municipality_id":"005031","municipalitybaladi":"006001006","objectid_1":25927,"projectbudget":4680700.86,"projectcentroid_id":"019/006/001/0601/09/00/4","projectcentroid_unified_id":null,"projectname_ar":"استبدال اعمدة الانارة بمدن الحاضرة 36/37","projectname_en":null,"projectnumber":null,"projectstatus":2,"projecttype":null,"region_id":"005","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[50.1221,26.4058]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":7,"OGC_FID":7,"amana_id":"00503","amanabaladi":"006001","amanatracking":"  \\\\  ","approvedby":null,"city_id":null,"consultant":"ارابتك","contractboundary":null,"contractnumber":null,"contractor":"شركة الواحة للتجارة و المقاولات","created_date":1621480412000,"created_user":"FME","dataowner":"أمانة المنطقة الشرقية FME","datasource":null,"dateofend":null,"dateofendcontract":null,"dateofstart":null,"dateofstartcontract":null,"description":"ايقاف جزئى بتاريخ 14/8/1436 لنسبة 48.7% من المشروع لوجود بعض المعوقات  - استئناف بتاريخ 10/2/1437 و مدة 174 تضاف الى نهاية العقد","designed":null,"district_id":"005039046","districtbaladi":"604","duration":"21","elevation":null,"globalid":"{4C5BF2DC-32D8-4D09-9B63-9D40BC590FC0}","governorate_id":"00506","id":"planning-and-land-and-cadastre_aBX49465980.8","last_edited_date":1622631074000,"last_edited_user":"MTHABET","municipality_id":"005039","municipalitybaladi":"006001003","objectid_1":25928,"projectbudget":44844308.16,"projectcentroid_id":"019/006/001/0602/07/00/4","projectcentroid_unified_id":null,"projectname_ar":"تصريف مياه الامطار بالخبر المرحلة 10 جزء 1","projectname_en":null,"projectnumber":null,"projectstatus":2,"projecttype":null,"region_id":"005","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[50.201,26.2913]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":8,"OGC_FID":8,"amana_id":"00503","amanabaladi":"006001","amanatracking":"  \\\\  ","approvedby":null,"city_id":null,"consultant":"ارابتك","contractboundary":null,"contractnumber":null,"contractor":"مؤسسة عابد على الحبشى للمقاولات","created_date":1621480412000,"created_user":"FME","dataowner":"أمانة المنطقة الشرقية FME","datasource":null,"dateofend":null,"dateofendcontract":null,"dateofstart":null,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"005039017","districtbaladi":"5978","duration":"21","elevation":null,"globalid":"{CAFC4755-64AA-4A1D-B0FE-A5FAFBA5CEF7}","governorate_id":"00506","id":"planning-and-land-and-cadastre_aBX49465980.9","last_edited_date":1622631074000,"last_edited_user":"MTHABET","municipality_id":"005039","municipalitybaladi":"006001003","objectid_1":25929,"projectbudget":42600600.0,"projectcentroid_id":"019/06/001/602/08/00/4","projectcentroid_unified_id":null,"projectname_ar":"تصريف مياه الامطار بالخبر م 11 ج 1","projectname_en":null,"projectnumber":null,"projectstatus":2,"projecttype":null,"region_id":"005","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[50.1875,26.224]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":9,"OGC_FID":9,"amana_id":"00503","amanabaladi":"006001","amanatracking":"  \\\\  ","approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":null,"created_date":1621480412000,"created_user":"FME","dataowner":"أمانة المنطقة الشرقية FME","datasource":null,"dateofend":null,"dateofendcontract":null,"dateofstart":null,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"005031002","districtbaladi":"1594","duration":null,"elevation":null,"globalid":"{D273D338-F003-4191-9E12-5466BC0AC200}","governorate_id":"00501","id":"planning-and-land-and-cadastre_aBX49465980.10","last_edited_date":1622631074000,"last_edited_user":"MTHABET","municipality_id":"005031","municipalitybaladi":"006001006","objectid_1":25930,"projectbudget":null,"projectcentroid_id":null,"projectcentroid_unified_id":null,"projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"005","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[50.0973,26.4006]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":10,"OGC_FID":10,"amana_id":"00503","amanabaladi":"006001","amanatracking":"  \\\\ Esri_Anonymous 2018-07-26T03:23:20","approvedby":null,"city_id":null,"consultant":"زهير فايز","contractboundary":null,"contractnumber":null,"contractor":"شركة مشروعات المياه و الطاقة","created_date":1621480412000,"created_user":"FME","dataowner":"أمانة المنطقة الشرقية FME","datasource":null,"dateofend":null,"dateofendcontract":null,"dateofstart":null,"dateofstartcontract":null,"description":"محضر تسليم الموقع بتاريخ 21/12/1436","designed":null,"district_id":"005040014","districtbaladi":"10077259","duration":"12","elevation":null,"globalid":"{C74F8C2B-DFB3-48E9-8B93-3754D2A23791}","governorate_id":"00501","id":"planning-and-land-and-cadastre_aBX49465980.11","last_edited_date":1622693554000,"last_edited_user":"MTHABET","municipality_id":"005040","municipalitybaladi":"006001004","objectid_1":25931,"projectbudget":3691927.75,"projectcentroid_id":"PP-0003","projectcentroid_unified_id":null,"projectname_ar":"إستكمال تطوير شاطئ نصف القمر-جزء3 للعام 37/36 هـ","projectname_en":null,"projectnumber":null,"projectstatus":2,"projecttype":null,"region_id":"005","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[50.0258,26.1966]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":11,"OGC_FID":11,"amana_id":"00503","amanabaladi":"006001","amanatracking":"  \\\\ Esri_Anonymous 2018-08-06T05:50:34","approvedby":null,"city_id":null,"consultant":"ارابتك","contractboundary":null,"contractnumber":null,"contractor":"شركة اعمار البنية التحتية للمقاولات المحدودة","created_date":1621480412000,"created_user":"FME","dataowner":"أمانة المنطقة الشرقية FME","datasource":null,"dateofend":null,"dateofendcontract":null,"dateofstart":null,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"005031056","districtbaladi":"1528","duration":"30","elevation":null,"globalid":"{AC58BD57-A011-4565-B57E-7572D72B52F4}","governorate_id":"00501","id":"planning-and-land-and-cadastre_aBX49465980.12","last_edited_date":1622631074000,"last_edited_user":"MTHABET","municipality_id":"005031","municipalitybaladi":"006001007","objectid_1":25932,"projectbudget":90000000.0,"projectcentroid_id":"SD-000003","projectcentroid_unified_id":null,"projectname_ar":"تصريف مياه الامطار بالدمام مرحلة 11 جزء 1","projectname_en":null,"projectnumber":null,"projectstatus":2,"projecttype":null,"region_id":"005","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[50.0501,26.3568]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":12,"OGC_FID":12,"amana_id":"00503","amanabaladi":"006001","amanatracking":"  \\\\ Esri_Anonymous 2018-08-06T08:49:45","approvedby":null,"city_id":null,"consultant":"زهير فايز","contractboundary":null,"contractnumber":null,"contractor":"مؤسسه جفال ونايف عبيد الشمرى للمقاولات","created_date":1621480412000,"created_user":"FME","dataowner":"أمانة المنطقة الشرقية FME","datasource":null,"dateofend":null,"dateofendcontract":null,"dateofstart":null,"dateofstartcontract":null,"description":"ضاحية الملك فهد الحي السابع الشمالي (تم تعديل البرنامج الزمني)","designed":null,"district_id":"005031072","districtbaladi":"1547","duration":"18","elevation":null,"globalid":"{B7129021-3A8B-4798-BF51-323F5E33E461}","governorate_id":"00501","id":"planning-and-land-and-cadastre_aBX49465980.13","last_edited_date":1622631074000,"last_edited_user":"MTHABET","municipality_id":"005031","municipalitybaladi":"006001007","objectid_1":25933,"projectbudget":19411021.5,"projectcentroid_id":"EL-0004","projectcentroid_unified_id":null,"projectname_ar":"تنمية وفتح شوارع بمخططات المنح السكنية بالدمام 36/35هـ","projectname_en":null,"projectnumber":null,"projectstatus":2,"projecttype":null,"region_id":"005","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[49.978,26.4426]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":13,"OGC_FID":13,"amana_id":"00503","amanabaladi":"006001","amanatracking":"  \\\\  ","approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":null,"created_date":1621481761000,"created_user":"FME","dataowner":"أمانة المنطقة الشرقية FME","datasource":null,"dateofend":null,"dateofendcontract":null,"dateofstart":null,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"005031002","districtbaladi":"1594","duration":null,"elevation":null,"globalid":"{72B8D676-CD51-44FC-BF94-9B2FB43D5A8F}","governorate_id":"00501","id":"planning-and-land-and-cadastre_aBX49465980.14","last_edited_date":1622631074000,"last_edited_user":"MTHABET","municipality_id":"005031","municipalitybaladi":"006001006","objectid_1":25934,"projectbudget":null,"projectcentroid_id":null,"projectcentroid_unified_id":null,"projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"005","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[50.0973,26.4006]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":14,"OGC_FID":14,"amana_id":"00503","amanabaladi":"006001","amanatracking":"  \\\\  ","approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":null,"created_date":1621481761000,"created_user":"FME","dataowner":"أمانة المنطقة الشرقية FME","datasource":null,"dateofend":null,"dateofendcontract":null,"dateofstart":null,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"005031002","districtbaladi":"1594","duration":null,"elevation":null,"globalid":"{15C511E0-F308-483C-96EA-701F9934FD6E}","governorate_id":"00501","id":"planning-and-land-and-cadastre_aBX49465980.15","last_edited_date":1622631074000,"last_edited_user":"MTHABET","municipality_id":"005031","municipalitybaladi":"006001006","objectid_1":25935,"projectbudget":null,"projectcentroid_id":null,"projectcentroid_unified_id":null,"projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"005","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[50.0973,26.4006]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":15,"OGC_FID":15,"amana_id":"00503","amanabaladi":"006001","amanatracking":"  \\\\  ","approvedby":null,"city_id":null,"consultant":"ارابتك","contractboundary":null,"contractnumber":null,"contractor":"شركة صينوبك انترناشيونال بتروليوم سيرفيس كوربوريشن","created_date":1621481761000,"created_user":"FME","dataowner":"أمانة المنطقة الشرقية FME","datasource":null,"dateofend":-16764278400000,"dateofendcontract":null,"dateofstart":-16827264000000,"dateofstartcontract":null,"description":"سيتم عمل ايقاف جزئى بتاريخ 8/11/1436 بسبب نقل الخدمات STC & 63 KV Cable","designed":null,"district_id":"005031040","districtbaladi":"1664","duration":"24","elevation":null,"globalid":"{E71BB7B0-EE8E-4FCB-AD97-387D4D5E62BA}","governorate_id":"00501","id":"planning-and-land-and-cadastre_aBX49465980.16","last_edited_date":1622631074000,"last_edited_user":"MTHABET","municipality_id":"005031","municipalitybaladi":"006001005","objectid_1":25936,"projectbudget":243058109.357,"projectcentroid_id":"019/006/001/402800000/3111311","projectcentroid_unified_id":null,"projectname_ar":"تقاطع الملك عبد العزيز و شارع 28","projectname_en":null,"projectnumber":null,"projectstatus":4,"projecttype":null,"region_id":"005","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[50.0807,26.4502]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":16,"OGC_FID":16,"amana_id":"00503","amanabaladi":"006001","amanatracking":"  \\\\  ","approvedby":null,"city_id":null,"consultant":"ارابتك","contractboundary":null,"contractnumber":null,"contractor":"شركة شيد المحدودة","created_date":1621481761000,"created_user":"FME","dataowner":"أمانة المنطقة الشرقية FME","datasource":null,"dateofend":-16883596800000,"dateofendcontract":null,"dateofstart":-16946582400000,"dateofstartcontract":null,"description":"تم ايقاف المشروع كليا بتاريخ و تم استئناف العمل بتاريخ","designed":null,"district_id":"005031018","districtbaladi":"1606","duration":"24","elevation":null,"globalid":"{4EB48186-369D-475B-ABBA-B3142F94F934}","governorate_id":"00501","id":"planning-and-land-and-cadastre_aBX49465980.17","last_edited_date":1622631074000,"last_edited_user":"MTHABET","municipality_id":"005031","municipalitybaladi":"006001006","objectid_1":25937,"projectbudget":125745312.6075,"projectcentroid_id":"019/006/001/409760000/3111311","projectcentroid_unified_id":null,"projectname_ar":"نفق الامام علي بن ابي طالب مع طريق الامير محمد بن فهد-الدمام","projectname_en":null,"projectnumber":null,"projectstatus":4,"projecttype":null,"region_id":"005","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[50.1103,26.4112]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":17,"OGC_FID":17,"amana_id":"00503","amanabaladi":"006001","amanatracking":"  \\\\  ","approvedby":null,"city_id":null,"consultant":"زهير فايز","contractboundary":null,"contractnumber":null,"contractor":"شركة مقاول جزيرة العرب","created_date":1621481761000,"created_user":"FME","dataowner":"أمانة المنطقة الشرقية FME","datasource":null,"dateofend":-16770844800000,"dateofendcontract":null,"dateofstart":-16833916800000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"005040013","districtbaladi":"1591","duration":"24","elevation":null,"globalid":"{D7B631AF-EC35-4237-B986-1439F802B68D}","governorate_id":"00501","id":"planning-and-land-and-cadastre_aBX49465980.18","last_edited_date":1622631074000,"last_edited_user":"MTHABET","municipality_id":"005040","municipalitybaladi":"006001004","objectid_1":25938,"projectbudget":34647245.885,"projectcentroid_id":"19/006/001/601/07/00/4","projectcentroid_unified_id":null,"projectname_ar":"سفلته وارصفة بالظهران والخبر الجزء 13","projectname_en":null,"projectnumber":null,"projectstatus":2,"projecttype":null,"region_id":"005","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[50.1506,26.3345]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":18,"OGC_FID":18,"amana_id":"00503","amanabaladi":"006001","amanatracking":"  \\\\  ","approvedby":null,"city_id":null,"consultant":"زهير فايز","contractboundary":null,"contractnumber":null,"contractor":"مؤسسة سبأ للمقاولات","created_date":1621481761000,"created_user":"FME","dataowner":"أمانة المنطقة الشرقية FME","datasource":null,"dateofend":-16803763200000,"dateofendcontract":null,"dateofstart":1437598800000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"005031014","districtbaladi":"1671","duration":"9","elevation":null,"globalid":"{3401A931-5AF3-487F-A78C-71040F240859}","governorate_id":"00501","id":"planning-and-land-and-cadastre_aBX49465980.19","last_edited_date":1622631074000,"last_edited_user":"MTHABET","municipality_id":"005031","municipalitybaladi":"006001005","objectid_1":25939,"projectbudget":2441483.21,"projectcentroid_id":"019/006/001/406079901/311121","projectcentroid_unified_id":null,"projectname_ar":"استكمال ترميم مبنى ادارة الرقابة و الاسواق بحي البادية","projectname_en":null,"projectnumber":null,"projectstatus":2,"projecttype":null,"region_id":"005","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[50.0909,26.429]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":19,"OGC_FID":19,"amana_id":"00503","amanabaladi":"006001","amanatracking":"  \\\\  ","approvedby":null,"city_id":null,"consultant":"زهير فايز","contractboundary":null,"contractnumber":null,"contractor":"مؤسسة عابد على الحبشى للمقاولات","created_date":1621481761000,"created_user":"FME","dataowner":"أمانة المنطقة الشرقية FME","datasource":null,"dateofend":1468616400000,"dateofendcontract":null,"dateofstart":1438030800000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"005031049","districtbaladi":"1599","duration":"12","elevation":null,"globalid":"{4630ABB4-9AB6-4175-8E8A-20DFFBB634A3}","governorate_id":"00501","id":"planning-and-land-and-cadastre_aBX49465980.20","last_edited_date":1622631074000,"last_edited_user":"MTHABET","municipality_id":"005031","municipalitybaladi":"006001006","objectid_1":25940,"projectbudget":4680700.86,"projectcentroid_id":"019/006/001/0601/09/00/4","projectcentroid_unified_id":null,"projectname_ar":"استبدال اعمدة الانارة بمدن الحاضرة 36/37","projectname_en":null,"projectnumber":null,"projectstatus":2,"projecttype":null,"region_id":"005","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[50.1221,26.4058]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":20,"OGC_FID":20,"amana_id":"00503","amanabaladi":"006001","amanatracking":"  \\\\  ","approvedby":null,"city_id":null,"consultant":"ارابتك","contractboundary":null,"contractnumber":null,"contractor":"شركة الواحة للتجارة و المقاولات","created_date":1621481761000,"created_user":"FME","dataowner":"أمانة المنطقة الشرقية FME","datasource":null,"dateofend":1456088400000,"dateofendcontract":null,"dateofstart":1402520400000,"dateofstartcontract":null,"description":"ايقاف جزئى بتاريخ 14/8/1436 لنسبة 48.7% من المشروع لوجود بعض المعوقات  - استئناف بتاريخ 10/2/1437 و مدة 174 تضاف الى نهاية العقد","designed":null,"district_id":"005039046","districtbaladi":"604","duration":"21","elevation":null,"globalid":"{3998A6F7-242D-48A9-B6AF-D36714B6719F}","governorate_id":"00506","id":"planning-and-land-and-cadastre_aBX49465980.21","last_edited_date":1622631074000,"last_edited_user":"MTHABET","municipality_id":"005039","municipalitybaladi":"006001003","objectid_1":25941,"projectbudget":44844308.16,"projectcentroid_id":"019/006/001/0602/07/00/4","projectcentroid_unified_id":null,"projectname_ar":"تصريف مياه الامطار بالخبر المرحلة 10 جزء 1","projectname_en":null,"projectnumber":null,"projectstatus":2,"projecttype":null,"region_id":"005","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[50.201,26.2913]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":21,"OGC_FID":21,"amana_id":"00503","amanabaladi":"006001","amanatracking":"  \\\\  ","approvedby":null,"city_id":null,"consultant":"ارابتك","contractboundary":null,"contractnumber":null,"contractor":"مؤسسة عابد على الحبشى للمقاولات","created_date":1621481761000,"created_user":"FME","dataowner":"أمانة المنطقة الشرقية FME","datasource":null,"dateofend":-16756934400000,"dateofendcontract":null,"dateofstart":-16812057600000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"005039017","districtbaladi":"5978","duration":"21","elevation":null,"globalid":"{5A5B8792-8127-4C38-ABE6-C157DCB2B6B4}","governorate_id":"00506","id":"planning-and-land-and-cadastre_aBX49465980.22","last_edited_date":1622631074000,"last_edited_user":"MTHABET","municipality_id":"005039","municipalitybaladi":"006001003","objectid_1":25942,"projectbudget":42600600.0,"projectcentroid_id":"019/06/001/602/08/00/4","projectcentroid_unified_id":null,"projectname_ar":"تصريف مياه الامطار بالخبر م 11 ج 1","projectname_en":null,"projectnumber":null,"projectstatus":2,"projecttype":null,"region_id":"005","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[50.1875,26.224]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":22,"OGC_FID":22,"amana_id":"00503","amanabaladi":"006001","amanatracking":"  \\\\  ","approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":null,"created_date":1621481761000,"created_user":"FME","dataowner":"أمانة المنطقة الشرقية FME","datasource":null,"dateofend":null,"dateofendcontract":null,"dateofstart":null,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"005031002","districtbaladi":"1594","duration":null,"elevation":null,"globalid":"{57B6E52D-0316-4797-9E50-05554DF37B38}","governorate_id":"00501","id":"planning-and-land-and-cadastre_aBX49465980.23","last_edited_date":1622631074000,"last_edited_user":"MTHABET","municipality_id":"005031","municipalitybaladi":"006001006","objectid_1":25943,"projectbudget":null,"projectcentroid_id":null,"projectcentroid_unified_id":null,"projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"005","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[50.0973,26.4006]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":23,"OGC_FID":23,"amana_id":"00503","amanabaladi":"006001","amanatracking":"  \\\\ Esri_Anonymous 2018-07-26T03:23:20","approvedby":null,"city_id":null,"consultant":"زهير فايز","contractboundary":null,"contractnumber":null,"contractor":"شركة مشروعات المياه و الطاقة","created_date":1621481761000,"created_user":"FME","dataowner":"أمانة المنطقة الشرقية FME","datasource":null,"dateofend":-16789334400000,"dateofendcontract":null,"dateofstart":-16820784000000,"dateofstartcontract":null,"description":"محضر تسليم الموقع بتاريخ 21/12/1436","designed":null,"district_id":"005040014","districtbaladi":"10077259","duration":"12","elevation":null,"globalid":"{F88CE08C-F93C-4F66-AA21-13C7742C8610}","governorate_id":"00501","id":"planning-and-land-and-cadastre_aBX49465980.24","last_edited_date":1622695161000,"last_edited_user":"MTHABET","municipality_id":"005040","municipalitybaladi":"006001004","objectid_1":25944,"projectbudget":3691927.75,"projectcentroid_id":"PP-0003","projectcentroid_unified_id":null,"projectname_ar":"إستكمال تطوير شاطئ نصف القمر-جزء3 للعام 37/36 هـ","projectname_en":null,"projectnumber":null,"projectstatus":2,"projecttype":null,"region_id":"005","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[50.0258,26.1966]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":24,"OGC_FID":24,"amana_id":"00503","amanabaladi":"006001","amanatracking":"  \\\\ Esri_Anonymous 2018-08-06T05:50:34","approvedby":null,"city_id":null,"consultant":"ارابتك","contractboundary":null,"contractnumber":null,"contractor":"شركة اعمار البنية التحتية للمقاولات المحدودة","created_date":1621481761000,"created_user":"FME","dataowner":"أمانة المنطقة الشرقية FME","datasource":null,"dateofend":-16675718400000,"dateofendcontract":null,"dateofstart":-16754428800000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"005031056","districtbaladi":"1528","duration":"30","elevation":null,"globalid":"{6582ABC9-CF73-429D-9739-0945E2283CD4}","governorate_id":"00501","id":"planning-and-land-and-cadastre_aBX49465980.25","last_edited_date":1622631074000,"last_edited_user":"MTHABET","municipality_id":"005031","municipalitybaladi":"006001007","objectid_1":25945,"projectbudget":90000000.0,"projectcentroid_id":"SD-000003","projectcentroid_unified_id":null,"projectname_ar":"تصريف مياه الامطار بالدمام مرحلة 11 جزء 1","projectname_en":null,"projectnumber":null,"projectstatus":2,"projecttype":null,"region_id":"005","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[50.0501,26.3568]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":25,"OGC_FID":25,"amana_id":"00503","amanabaladi":"006001","amanatracking":"  \\\\ Esri_Anonymous 2018-08-06T08:49:45","approvedby":null,"city_id":null,"consultant":"زهير فايز","contractboundary":null,"contractnumber":null,"contractor":"مؤسسه جفال ونايف عبيد الشمرى للمقاولات","created_date":1621481761000,"created_user":"FME","dataowner":"أمانة المنطقة الشرقية FME","datasource":null,"dateofend":-16823376000000,"dateofendcontract":null,"dateofstart":-16870809600000,"dateofstartcontract":null,"description":"ضاحية الملك فهد الحي السابع الشمالي (تم تعديل البرنامج الزمني)","designed":null,"district_id":"005031072","districtbaladi":"1547","duration":"18","elevation":null,"globalid":"{1B8905EB-8AC7-4997-B911-E2AD98654E0A}","governorate_id":"00501","id":"planning-and-land-and-cadastre_aBX49465980.26","last_edited_date":1622631074000,"last_edited_user":"MTHABET","municipality_id":"005031","municipalitybaladi":"006001007","objectid_1":25946,"projectbudget":19411021.5,"projectcentroid_id":"EL-0004","projectcentroid_unified_id":null,"projectname_ar":"تنمية وفتح شوارع بمخططات المنح السكنية بالدمام 36/35هـ","projectname_en":null,"projectnumber":null,"projectstatus":2,"projecttype":null,"region_id":"005","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[49.978,26.4426]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":26,"OGC_FID":26,"amana_id":"01001","amanabaladi":"009001","amanatracking":"khatib & Alami 2016-03-15T00:00:00 \\\\  ","approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":null,"created_date":1624422315000,"created_user":"FME","dataowner":"أمانة منطقة جازان FME","datasource":"Amana","dateofend":null,"dateofendcontract":1411765200000,"dateofstart":null,"dateofstartcontract":1349557200000,"description":null,"designed":null,"district_id":"010007021","districtbaladi":"12205","duration":null,"elevation":null,"globalid":"{49207096-0587-494C-8E4B-13CF49798009}","governorate_id":"01001","id":"planning-and-land-and-cadastre_aBX49465980.27","last_edited_date":1624422315000,"last_edited_user":"FME","municipality_id":"010007","municipalitybaladi":"009001","objectid_1":25947,"projectbudget":88075.0,"projectcentroid_id":null,"projectcentroid_unified_id":null,"projectname_ar":"سفلتة وأرصفة وانارة لضاحية الملك عبد الله  المرحلة 2 الجز2","projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"010","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[42.5751,16.9928]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":27,"OGC_FID":27,"amana_id":"01001","amanabaladi":"009001","amanatracking":"khatib & Alami 2016-03-15T00:00:00 \\\\  ","approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":null,"created_date":1624422315000,"created_user":"FME","dataowner":"أمانة منطقة جازان FME","datasource":"Amana","dateofend":null,"dateofendcontract":1411765200000,"dateofstart":null,"dateofstartcontract":1349557200000,"description":null,"designed":null,"district_id":"010007021","districtbaladi":"12205","duration":null,"elevation":null,"globalid":"{E89114C4-715F-4E5A-8009-4E2D00DE7511}","governorate_id":"01001","id":"planning-and-land-and-cadastre_aBX49465980.28","last_edited_date":1624422315000,"last_edited_user":"FME","municipality_id":"010007","municipalitybaladi":"009001","objectid_1":25948,"projectbudget":77618.0,"projectcentroid_id":null,"projectcentroid_unified_id":null,"projectname_ar":"سفلتة وأرصفة وانارة لضاحية الملك عبد الله  المرحلة 2 الجز3","projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"010","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[42.5727,16.9968]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":28,"OGC_FID":28,"amana_id":"01001","amanabaladi":"009001","amanatracking":"khatib & Alami 2016-03-15T00:00:00 \\\\  ","approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":null,"created_date":1624422316000,"created_user":"FME","dataowner":"أمانة منطقة جازان FME","datasource":"Amana","dateofend":null,"dateofendcontract":1428354000000,"dateofstart":null,"dateofstartcontract":1366146000000,"description":null,"designed":null,"district_id":"010007023","districtbaladi":"12210","duration":null,"elevation":null,"globalid":"{BFF77E13-CBED-4230-ADE5-FC7E635B9E84}","governorate_id":"01001","id":"planning-and-land-and-cadastre_aBX49465980.29","last_edited_date":1624422316000,"last_edited_user":"FME","municipality_id":"010007","municipalitybaladi":"009001","objectid_1":25949,"projectbudget":77744.0,"projectcentroid_id":null,"projectcentroid_unified_id":null,"projectname_ar":"سفلتة وأرصفة وانارة لضاحية الملك عبد الله  المرحلة 2 الجز 5","projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"010","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[42.5869,16.9931]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":29,"OGC_FID":29,"amana_id":"01001","amanabaladi":"009001","amanatracking":"khatib & Alami 2016-03-15T00:00:00 \\\\  ","approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":null,"created_date":1624422316000,"created_user":"FME","dataowner":"أمانة منطقة جازان FME","datasource":"Amana","dateofend":null,"dateofendcontract":1437253200000,"dateofstart":null,"dateofstartcontract":1375045200000,"description":null,"designed":null,"district_id":"010007021","districtbaladi":"12205","duration":null,"elevation":null,"globalid":"{5A9598B9-4192-4E3A-927C-54137832FED9}","governorate_id":"01001","id":"planning-and-land-and-cadastre_aBX49465980.30","last_edited_date":1624422316000,"last_edited_user":"FME","municipality_id":"010007","municipalitybaladi":"009001","objectid_1":25950,"projectbudget":83952.0,"projectcentroid_id":null,"projectcentroid_unified_id":null,"projectname_ar":"سفلتة وأرصفة وانارة لضاحية الملك عبد الله  المرحلة 2 الجزء 4 ","projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"010","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[42.5798,16.9964]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":30,"OGC_FID":30,"amana_id":"01001","amanabaladi":"009001","amanatracking":"khatib & Alami 2016-03-15T00:00:00 \\\\  ","approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":null,"created_date":1624422316000,"created_user":"FME","dataowner":"أمانة منطقة جازان FME","datasource":"Amana","dateofend":null,"dateofendcontract":1456088400000,"dateofstart":null,"dateofstartcontract":1441054800000,"description":null,"designed":null,"district_id":null,"districtbaladi":"60689","duration":null,"elevation":null,"globalid":"{112FC10C-DAAD-4BAF-AD4B-64DB77275F53}","governorate_id":"01008","id":"planning-and-land-and-cadastre_aBX49465980.31","last_edited_date":1624422316000,"last_edited_user":"FME","municipality_id":"010006","municipalitybaladi":"009302","objectid_1":25951,"projectbudget":127173.0,"projectcentroid_id":null,"projectcentroid_unified_id":null,"projectname_ar":"انشاء مدافن هندسية واللتخلص من النفايات م1 (الطوال – بيش)","projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"010","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[42.5359,17.475]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":31,"OGC_FID":31,"amana_id":"01001","amanabaladi":"009001","amanatracking":"khatib & Alami 2016-03-15T00:00:00 \\\\  ","approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":null,"created_date":1624422316000,"created_user":"FME","dataowner":"أمانة منطقة جازان FME","datasource":"Amana","dateofend":null,"dateofendcontract":1422997200000,"dateofstart":null,"dateofstartcontract":1392757200000,"description":null,"designed":null,"district_id":"010007011","districtbaladi":"5564","duration":null,"elevation":null,"globalid":"{501E0CDA-1E9F-4863-9AA4-BC39D7092B4E}","governorate_id":"01001","id":"planning-and-land-and-cadastre_aBX49465980.32","last_edited_date":1624422316000,"last_edited_user":"FME","municipality_id":"010007","municipalitybaladi":"009001","objectid_1":25952,"projectbudget":8917.0,"projectcentroid_id":null,"projectcentroid_unified_id":null,"projectname_ar":"انشاء  الحدائق م2","projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"010","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[42.5491,16.8743]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":32,"OGC_FID":32,"amana_id":"01001","amanabaladi":"009001","amanatracking":"khatib & Alami 2016-03-15T00:00:00 \\\\  ","approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":null,"created_date":1624422316000,"created_user":"FME","dataowner":"أمانة منطقة جازان FME","datasource":"Amana","dateofend":null,"dateofendcontract":1422910800000,"dateofstart":null,"dateofstartcontract":1392670800000,"description":null,"designed":null,"district_id":"010007016","districtbaladi":"12221","duration":null,"elevation":null,"globalid":"{24CA9141-A976-46F0-AE12-02F171687C72}","governorate_id":"01001","id":"planning-and-land-and-cadastre_aBX49465980.33","last_edited_date":1624422316000,"last_edited_user":"FME","municipality_id":"010007","municipalitybaladi":"009001","objectid_1":25953,"projectbudget":7676.0,"projectcentroid_id":null,"projectcentroid_unified_id":null,"projectname_ar":"انشاء  الحدائق م3","projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"010","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[42.553,16.9316]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":33,"OGC_FID":33,"amana_id":"01001","amanabaladi":"009001","amanatracking":"khatib & Alami 2016-03-15T00:00:00 \\\\  ","approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":null,"created_date":1624422316000,"created_user":"FME","dataowner":"أمانة منطقة جازان FME","datasource":"Amana","dateofend":null,"dateofendcontract":1405285200000,"dateofstart":null,"dateofstartcontract":1375045200000,"description":null,"designed":null,"district_id":"010007014","districtbaladi":"1577","duration":null,"elevation":null,"globalid":"{869A48D3-FC45-45B4-A069-DD874B66FAC8}","governorate_id":"01001","id":"planning-and-land-and-cadastre_aBX49465980.34","last_edited_date":1624422316000,"last_edited_user":"FME","municipality_id":"010007","municipalitybaladi":"009001","objectid_1":25954,"projectbudget":9974.0,"projectcentroid_id":null,"projectcentroid_unified_id":null,"projectname_ar":"انشاء ساحات بلدية بجازان م3","projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"010","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[42.6111,16.9281]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":34,"OGC_FID":34,"amana_id":"01001","amanabaladi":"009001","amanatracking":"khatib & Alami 2016-03-15T00:00:00 \\\\  ","approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":null,"created_date":1624422316000,"created_user":"FME","dataowner":"أمانة منطقة جازان FME","datasource":"Amana","dateofend":null,"dateofendcontract":1443733200000,"dateofstart":null,"dateofstartcontract":1397077200000,"description":null,"designed":null,"district_id":"010007011","districtbaladi":"5564","duration":null,"elevation":null,"globalid":"{4E172CB2-0327-4B1E-B57B-2503F8E63BCC}","governorate_id":"01001","id":"planning-and-land-and-cadastre_aBX49465980.35","last_edited_date":1624422316000,"last_edited_user":"FME","municipality_id":"010007","municipalitybaladi":"009001","objectid_1":25955,"projectbudget":17896.0,"projectcentroid_id":null,"projectcentroid_unified_id":null,"projectname_ar":"تأهيل حي العشيماء والجبل ","projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"010","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[42.5455,16.8882]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":35,"OGC_FID":35,"amana_id":"01001","amanabaladi":"009001","amanatracking":"khatib & Alami 2016-03-15T00:00:00 \\\\  ","approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":null,"created_date":1624422316000,"created_user":"FME","dataowner":"أمانة منطقة جازان FME","datasource":"Amana","dateofend":null,"dateofendcontract":1445288400000,"dateofstart":null,"dateofstartcontract":1414184400000,"description":null,"designed":null,"district_id":"010007012","districtbaladi":"1572","duration":null,"elevation":null,"globalid":"{030958A5-000A-4934-A0ED-A531DDCA0025}","governorate_id":"01001","id":"planning-and-land-and-cadastre_aBX49465980.36","last_edited_date":1624422316000,"last_edited_user":"FME","municipality_id":"010007","municipalitybaladi":"009001","objectid_1":25956,"projectbudget":37958.0,"projectcentroid_id":null,"projectcentroid_unified_id":null,"projectname_ar":"حماية و تحسين  الواجهات البحرية ","projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"010","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[42.6013,16.8346]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":36,"OGC_FID":36,"amana_id":"01001","amanabaladi":"009001","amanatracking":"khatib & Alami 2016-03-15T00:00:00 \\\\  ","approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":null,"created_date":1624422316000,"created_user":"FME","dataowner":"أمانة منطقة جازان FME","datasource":"Amana","dateofend":null,"dateofendcontract":1445288400000,"dateofstart":null,"dateofstartcontract":1414184400000,"description":null,"designed":null,"district_id":"010007002","districtbaladi":"12209","duration":null,"elevation":null,"globalid":"{194215B0-923A-4D80-84F2-0252B7983E16}","governorate_id":"01001","id":"planning-and-land-and-cadastre_aBX49465980.37","last_edited_date":1624422316000,"last_edited_user":"FME","municipality_id":"010007","municipalitybaladi":"009001","objectid_1":25957,"projectbudget":9004.0,"projectcentroid_id":null,"projectcentroid_unified_id":null,"projectname_ar":"حماية و تحسين  الواجهات البحرية ","projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"010","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[42.5446,16.9391]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":37,"OGC_FID":37,"amana_id":"01001","amanabaladi":"009001","amanatracking":"khatib & Alami 2016-03-15T00:00:00 \\\\  ","approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":null,"created_date":1624422316000,"created_user":"FME","dataowner":"أمانة منطقة جازان FME","datasource":"Amana","dateofend":null,"dateofendcontract":1479243600000,"dateofstart":null,"dateofstartcontract":1417035600000,"description":null,"designed":null,"district_id":"010007008","districtbaladi":"1570","duration":null,"elevation":null,"globalid":"{CE863ABD-A701-46B3-84CB-805E98A71AC4}","governorate_id":"01001","id":"planning-and-land-and-cadastre_aBX49465980.38","last_edited_date":1624422316000,"last_edited_user":"FME","municipality_id":"010007","municipalitybaladi":"009001","objectid_1":25958,"projectbudget":44908.0,"projectcentroid_id":null,"projectcentroid_unified_id":null,"projectname_ar":"تنفيذ الشوارع الهيكلية ","projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"010","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[42.6115,16.8643]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":38,"OGC_FID":38,"amana_id":"01001","amanabaladi":"009001","amanatracking":"khatib & Alami 2016-03-15T00:00:00 \\\\  ","approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":null,"created_date":1624422316000,"created_user":"FME","dataowner":"أمانة منطقة جازان FME","datasource":"Amana","dateofend":null,"dateofendcontract":1411765200000,"dateofstart":null,"dateofstartcontract":1349557200000,"description":null,"designed":null,"district_id":"010007021","districtbaladi":"12205","duration":null,"elevation":null,"globalid":"{D39EB241-CA1A-4ED3-B443-0A97AE85DFE5}","governorate_id":"01001","id":"planning-and-land-and-cadastre_aBX49465980.39","last_edited_date":1624422316000,"last_edited_user":"FME","municipality_id":"010007","municipalitybaladi":"009001","objectid_1":25959,"projectbudget":33871.0,"projectcentroid_id":null,"projectcentroid_unified_id":null,"projectname_ar":"سفلتة وارصفة واناره لضاحية الملك عبدالله بجازان م3","projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"010","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[42.5733,16.9879]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":39,"OGC_FID":39,"amana_id":"01001","amanabaladi":"009001","amanatracking":"khatib & Alami 2016-03-15T00:00:00 \\\\  ","approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":null,"created_date":1624422316000,"created_user":"FME","dataowner":"أمانة منطقة جازان FME","datasource":"Amana","dateofend":null,"dateofendcontract":1449954000000,"dateofstart":null,"dateofstartcontract":1418850000000,"description":null,"designed":null,"district_id":"010007025","districtbaladi":"1568","duration":null,"elevation":null,"globalid":"{06E854E0-2C66-4445-BF7E-7FBBFBA950BF}","governorate_id":"01001","id":"planning-and-land-and-cadastre_aBX49465980.40","last_edited_date":1624422316000,"last_edited_user":"FME","municipality_id":"010007","municipalitybaladi":"009001","objectid_1":25960,"projectbudget":7898.0,"projectcentroid_id":null,"projectcentroid_unified_id":null,"projectname_ar":"إنشاء حدائق وممرات مشاة وساحات بجازان الجز2","projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"010","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[42.5791,16.8722]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":40,"OGC_FID":40,"amana_id":"01001","amanabaladi":"009001","amanatracking":"khatib & Alami 2016-03-15T00:00:00 \\\\  ","approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":null,"created_date":1624422316000,"created_user":"FME","dataowner":"أمانة منطقة جازان FME","datasource":"Amana","dateofend":null,"dateofendcontract":1492030800000,"dateofstart":null,"dateofstartcontract":1398718800000,"description":null,"designed":null,"district_id":"010007030","districtbaladi":"5565","duration":null,"elevation":null,"globalid":"{7AD4B0FD-280D-478E-A3F4-721FA323C7B7}","governorate_id":"01001","id":"planning-and-land-and-cadastre_aBX49465980.41","last_edited_date":1624422316000,"last_edited_user":"FME","municipality_id":"010007","municipalitybaladi":"009001","objectid_1":25961,"projectbudget":49435.205,"projectcentroid_id":null,"projectcentroid_unified_id":null,"projectname_ar":"دراسة تطوير مركز نظم المعلومات الجعفرافية","projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"010","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[42.6141,16.8316]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":41,"OGC_FID":41,"amana_id":"01001","amanabaladi":"009001","amanatracking":"khatib & Alami 2016-03-15T00:00:00 \\\\  ","approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":null,"created_date":1624422316000,"created_user":"FME","dataowner":"أمانة منطقة جازان FME","datasource":"Amana","dateofend":null,"dateofendcontract":1432587600000,"dateofstart":null,"dateofstartcontract":1417035600000,"description":null,"designed":null,"district_id":"010007009","districtbaladi":"1569","duration":null,"elevation":null,"globalid":"{AF07FB7B-DBBC-4949-B3CB-AEF99702A96A}","governorate_id":"01001","id":"planning-and-land-and-cadastre_aBX49465980.42","last_edited_date":1624422316000,"last_edited_user":"FME","municipality_id":"010007","municipalitybaladi":"009001","objectid_1":25962,"projectbudget":3293.395,"projectcentroid_id":null,"projectcentroid_unified_id":null,"projectname_ar":"تحسين و تجميل مداخل الأمانة والبلديات والقري لها","projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"010","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[42.5926,16.885]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":42,"OGC_FID":42,"amana_id":"01001","amanabaladi":"009001","amanatracking":"khatib & Alami 2016-03-15T00:00:00 \\\\  ","approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":null,"created_date":1624422316000,"created_user":"FME","dataowner":"أمانة منطقة جازان FME","datasource":"Amana","dateofend":null,"dateofendcontract":1448312400000,"dateofstart":null,"dateofstartcontract":1418072400000,"description":null,"designed":null,"district_id":"010007016","districtbaladi":"12221","duration":null,"elevation":null,"globalid":"{AA0F588E-3ED7-453F-A36F-EEC8131778EF}","governorate_id":"01001","id":"planning-and-land-and-cadastre_aBX49465980.43","last_edited_date":1624422316000,"last_edited_user":"FME","municipality_id":"010007","municipalitybaladi":"009001","objectid_1":25963,"projectbudget":34997.5,"projectcentroid_id":null,"projectcentroid_unified_id":null,"projectname_ar":"مباني ومرافق البلدية (استكمال الموقع العام لمركز الأمير سلطان الخضارى بمدينة جازان","projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"010","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[42.5552,16.9155]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":43,"OGC_FID":43,"amana_id":"01001","amanabaladi":"009001","amanatracking":"khatib & Alami 2016-03-15T00:00:00 \\\\  ","approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":null,"created_date":1624422316000,"created_user":"FME","dataowner":"أمانة منطقة جازان FME","datasource":"Amana","dateofend":null,"dateofendcontract":1481058000000,"dateofstart":null,"dateofstartcontract":1418936400000,"description":null,"designed":null,"district_id":"010007023","districtbaladi":"12210","duration":null,"elevation":null,"globalid":"{643C5B1E-D617-430D-8359-3AF201B4663D}","governorate_id":"01003","id":"planning-and-land-and-cadastre_aBX49465980.44","last_edited_date":1624422316000,"last_edited_user":"FME","municipality_id":"010007","municipalitybaladi":"009001","objectid_1":25964,"projectbudget":13996.915,"projectcentroid_id":null,"projectcentroid_unified_id":null,"projectname_ar":"دراخطار السيول و الأمطار للأمانة البلديات المرتبطة بها م2","projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"010","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[42.6116,16.9866]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":44,"OGC_FID":44,"amana_id":"01001","amanabaladi":"009001","amanatracking":"khatib & Alami 2016-03-15T00:00:00 \\\\  ","approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":null,"created_date":1624422316000,"created_user":"FME","dataowner":"أمانة منطقة جازان FME","datasource":"Amana","dateofend":null,"dateofendcontract":1481576400000,"dateofstart":null,"dateofstartcontract":1419368400000,"description":null,"designed":null,"district_id":"010007019","districtbaladi":"12198","duration":null,"elevation":null,"globalid":"{2EF6781D-1051-4293-BC94-482E84E661DD}","governorate_id":"01001","id":"planning-and-land-and-cadastre_aBX49465980.45","last_edited_date":1624422316000,"last_edited_user":"FME","municipality_id":"010007","municipalitybaladi":"009001","objectid_1":25965,"projectbudget":26392.247,"projectcentroid_id":null,"projectcentroid_unified_id":null,"projectname_ar":"سفلتة وأرصفة وإنارة للأمانة البلديات المرتبطة ج2(سفلتة وأرصفة وإنارة بجازان)","projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"010","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[42.5858,16.88]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":45,"OGC_FID":45,"amana_id":"01001","amanabaladi":"009001","amanatracking":"khatib & Alami 2016-03-15T00:00:00 \\\\  ","approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":null,"created_date":1624422316000,"created_user":"FME","dataowner":"أمانة منطقة جازان FME","datasource":"Amana","dateofend":null,"dateofendcontract":1472158800000,"dateofstart":null,"dateofstartcontract":1409950800000,"description":null,"designed":null,"district_id":"010007002","districtbaladi":"12209","duration":null,"elevation":null,"globalid":"{EC5FECA5-C1D2-42DD-B93E-D74F48671CB9}","governorate_id":"01001","id":"planning-and-land-and-cadastre_aBX49465980.46","last_edited_date":1624422316000,"last_edited_user":"FME","municipality_id":"010007","municipalitybaladi":"009001","objectid_1":25966,"projectbudget":68986.95,"projectcentroid_id":null,"projectcentroid_unified_id":null,"projectname_ar":"حماية وتحسين الواجهات البحرية (بالكورينش الشمالي مرحلة ثانية)   ","projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"010","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[42.5442,16.9407]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":46,"OGC_FID":46,"amana_id":"01001","amanabaladi":"009001","amanatracking":"khatib & Alami 2016-03-15T00:00:00 \\\\  ","approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":null,"created_date":1624422316000,"created_user":"FME","dataowner":"أمانة منطقة جازان FME","datasource":"Amana","dateofend":null,"dateofendcontract":1494363600000,"dateofstart":null,"dateofstartcontract":1432155600000,"description":null,"designed":null,"district_id":"010007026","districtbaladi":"12201","duration":null,"elevation":null,"globalid":"{A847DC74-A4FF-44A3-AFE1-9C5FE9674807}","governorate_id":"01001","id":"planning-and-land-and-cadastre_aBX49465980.47","last_edited_date":1624422316000,"last_edited_user":"FME","municipality_id":"010007","municipalitybaladi":"009001","objectid_1":25967,"projectbudget":37798.8,"projectcentroid_id":null,"projectcentroid_unified_id":null,"projectname_ar":"درخطار السيول و تصريف مياه الامطار للأمانة والبلديات م5 بجازان","projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"010","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[42.5699,16.9607]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":47,"OGC_FID":47,"amana_id":"01001","amanabaladi":"009001","amanatracking":"khatib & Alami 2016-03-15T00:00:00 \\\\  ","approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":null,"created_date":1624422316000,"created_user":"FME","dataowner":"أمانة منطقة جازان FME","datasource":"Amana","dateofend":null,"dateofendcontract":1447621200000,"dateofstart":null,"dateofstartcontract":1432069200000,"description":null,"designed":null,"district_id":null,"districtbaladi":"15615","duration":null,"elevation":null,"globalid":"{E32C4031-04FB-43CC-AD11-2F0AB58CD536}","governorate_id":"01011","id":"planning-and-land-and-cadastre_aBX49465980.48","last_edited_date":1624422316000,"last_edited_user":"FME","municipality_id":"010012","municipalitybaladi":"009712","objectid_1":25968,"projectbudget":1516.079,"projectcentroid_id":null,"projectcentroid_unified_id":null,"projectname_ar":"تحسين وتجميل المداخل بوابه المداخل الثاني بمدينة جازان","projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"010","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[42.7037,16.8109]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":48,"OGC_FID":48,"amana_id":"01001","amanabaladi":"009001","amanatracking":"khatib & Alami 2016-03-15T00:00:00 \\\\  ","approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":null,"created_date":1624422316000,"created_user":"FME","dataowner":"أمانة منطقة جازان FME","datasource":"Amana","dateofend":null,"dateofendcontract":1457038800000,"dateofstart":null,"dateofstartcontract":1425934800000,"description":null,"designed":null,"district_id":"010007016","districtbaladi":"12221","duration":null,"elevation":null,"globalid":"{4931ED6B-A8F5-461A-9933-F9231064BB12}","governorate_id":"01001","id":"planning-and-land-and-cadastre_aBX49465980.49","last_edited_date":1624422316000,"last_edited_user":"FME","municipality_id":"010007","municipalitybaladi":"009001","objectid_1":25969,"projectbudget":4069.8,"projectcentroid_id":null,"projectcentroid_unified_id":null,"projectname_ar":"إنشاء حدائق و ممرات مشاه وساحات بجازان","projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"010","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[42.5571,16.9156]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":49,"OGC_FID":49,"amana_id":"01001","amanabaladi":"009001","amanatracking":"khatib & Alami 2016-03-15T00:00:00 \\\\  ","approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":null,"created_date":1624422316000,"created_user":"FME","dataowner":"أمانة منطقة جازان FME","datasource":"Amana","dateofend":null,"dateofendcontract":1466542800000,"dateofstart":null,"dateofstartcontract":1436302800000,"description":null,"designed":null,"district_id":"010007016","districtbaladi":"12221","duration":null,"elevation":null,"globalid":"{0201A506-92A7-4318-8C51-C9451D3E4098}","governorate_id":"01001","id":"planning-and-land-and-cadastre_aBX49465980.50","last_edited_date":1624422316000,"last_edited_user":"FME","municipality_id":"010007","municipalitybaladi":"009001","objectid_1":25970,"projectbudget":11494.473,"projectcentroid_id":null,"projectcentroid_unified_id":null,"projectname_ar":"استكمال مبني الأمانة","projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"010","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[42.5518,16.9162]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":50,"OGC_FID":50,"amana_id":"01001","amanabaladi":"009001","amanatracking":"khatib & Alami 2016-03-15T00:00:00 \\\\  ","approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":null,"created_date":1624422316000,"created_user":"FME","dataowner":"أمانة منطقة جازان FME","datasource":"Amana","dateofend":null,"dateofendcontract":1466542800000,"dateofstart":null,"dateofstartcontract":1436302800000,"description":null,"designed":null,"district_id":"010007002","districtbaladi":"12209","duration":null,"elevation":null,"globalid":"{D7FF1141-E764-4C17-ACF3-E17B8D038AA8}","governorate_id":"01001","id":"planning-and-land-and-cadastre_aBX49465980.51","last_edited_date":1624422316000,"last_edited_user":"FME","municipality_id":"010007","municipalitybaladi":"009001","objectid_1":25971,"projectbudget":1950.3,"projectcentroid_id":null,"projectcentroid_unified_id":null,"projectname_ar":"انارة للأمانة البلديات والقري المرتبطة بجازان","projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"010","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[42.5555,16.9503]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":51,"OGC_FID":51,"amana_id":"01001","amanabaladi":"009001","amanatracking":"khatib & Alami 2016-03-15T00:00:00 \\\\  ","approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":null,"created_date":1624422317000,"created_user":"FME","dataowner":"أمانة منطقة جازان FME","datasource":"Amana","dateofend":null,"dateofendcontract":1472677200000,"dateofstart":null,"dateofstartcontract":1442437200000,"description":null,"designed":null,"district_id":"010007026","districtbaladi":"12201","duration":null,"elevation":null,"globalid":"{0370C5AD-6F59-480B-9843-1A9775F44AD7}","governorate_id":"01001","id":"planning-and-land-and-cadastre_aBX49465980.52","last_edited_date":1624422317000,"last_edited_user":"FME","municipality_id":"010007","municipalitybaladi":"009001","objectid_1":25972,"projectbudget":3993.275,"projectcentroid_id":null,"projectcentroid_unified_id":null,"projectname_ar":"تحسين وإنشاء مقابر و مغاسل موتي ","projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"010","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[42.5883,16.9338]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":52,"OGC_FID":52,"amana_id":"01001","amanabaladi":"009001","amanatracking":"khatib & Alami 2016-03-15T00:00:00 \\\\  ","approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":null,"created_date":1624422317000,"created_user":"FME","dataowner":"أمانة منطقة جازان FME","datasource":"Amana","dateofend":null,"dateofendcontract":1504645200000,"dateofstart":null,"dateofstartcontract":1442437200000,"description":null,"designed":null,"district_id":"010007019","districtbaladi":"12198","duration":null,"elevation":null,"globalid":"{0DCA8892-6987-45E9-9C35-DE5FA68C20E9}","governorate_id":"01001","id":"planning-and-land-and-cadastre_aBX49465980.53","last_edited_date":1624422317000,"last_edited_user":"FME","municipality_id":"010007","municipalitybaladi":"009001","objectid_1":25973,"projectbudget":35000.0,"projectcentroid_id":null,"projectcentroid_unified_id":null,"projectname_ar":"رفع منسوب الارضي والمخططات و فتح الشوارع","projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"010","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[42.5948,16.8646]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":53,"OGC_FID":53,"amana_id":"01001","amanabaladi":"009001","amanatracking":"khatib & Alami 2016-03-15T00:00:00 \\\\  ","approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":null,"created_date":1624422317000,"created_user":"FME","dataowner":"أمانة منطقة جازان FME","datasource":"Amana","dateofend":null,"dateofendcontract":1506114000000,"dateofstart":null,"dateofstartcontract":1443906000000,"description":null,"designed":null,"district_id":"010007014","districtbaladi":"1577","duration":null,"elevation":null,"globalid":"{0740AF9D-4FD8-4392-BD13-BECFF37B7A32}","governorate_id":"01001","id":"planning-and-land-and-cadastre_aBX49465980.54","last_edited_date":1624422317000,"last_edited_user":"FME","municipality_id":"010007","municipalitybaladi":"009001","objectid_1":25974,"projectbudget":30000.0,"projectcentroid_id":null,"projectcentroid_unified_id":null,"projectname_ar":"فتح الشوارع بالقرى المرتبطة بالمدينة","projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"010","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[42.6038,16.9242]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":54,"OGC_FID":54,"amana_id":"01001","amanabaladi":"009001","amanatracking":"khatib & Alami 2016-03-15T00:00:00 \\\\  ","approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":null,"created_date":1624422317000,"created_user":"FME","dataowner":"أمانة منطقة جازان FME","datasource":"Amana","dateofend":null,"dateofendcontract":1506114000000,"dateofstart":null,"dateofstartcontract":1443906000000,"description":null,"designed":null,"district_id":"010007010","districtbaladi":"1575","duration":null,"elevation":null,"globalid":"{185F8875-F052-490F-AA58-973FA199521A}","governorate_id":"01001","id":"planning-and-land-and-cadastre_aBX49465980.55","last_edited_date":1624422317000,"last_edited_user":"FME","municipality_id":"010007","municipalitybaladi":"009001","objectid_1":25975,"projectbudget":17637.6,"projectcentroid_id":null,"projectcentroid_unified_id":null,"projectname_ar":"إنشاء حدائق و ساحات و ملاعب وشبكات ري","projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"010","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[42.5709,16.9181]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":55,"OGC_FID":55,"amana_id":"01001","amanabaladi":"009001","amanatracking":"khatib & Alami 2016-03-15T00:00:00 \\\\  ","approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":null,"created_date":1624422317000,"created_user":"FME","dataowner":"أمانة منطقة جازان FME","datasource":"Amana","dateofend":null,"dateofendcontract":1472245200000,"dateofstart":null,"dateofstartcontract":1442005200000,"description":null,"designed":null,"district_id":"010007016","districtbaladi":"12221","duration":null,"elevation":null,"globalid":"{7262581C-562A-44DD-9BFB-03C6BD85A6D5}","governorate_id":"01001","id":"planning-and-land-and-cadastre_aBX49465980.56","last_edited_date":1624422317000,"last_edited_user":"FME","municipality_id":"010007","municipalitybaladi":"009001","objectid_1":25976,"projectbudget":6989.862,"projectcentroid_id":null,"projectcentroid_unified_id":null,"projectname_ar":"مباني ومرافق بلدية","projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"010","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[42.5474,16.9017]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":56,"OGC_FID":56,"amana_id":"01001","amanabaladi":"009001","amanatracking":"khatib & Alami 2016-03-15T00:00:00 \\\\  ","approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":null,"created_date":1624422317000,"created_user":"FME","dataowner":"أمانة منطقة جازان FME","datasource":"Amana","dateofend":null,"dateofendcontract":1449954000000,"dateofstart":null,"dateofstartcontract":1418245200000,"description":null,"designed":null,"district_id":"010007012","districtbaladi":"1572","duration":null,"elevation":null,"globalid":"{A5C45C3F-9E83-4F43-B78A-39EE533AB989}","governorate_id":"01001","id":"planning-and-land-and-cadastre_aBX49465980.57","last_edited_date":1624422317000,"last_edited_user":"FME","municipality_id":"010007","municipalitybaladi":"009001","objectid_1":25977,"projectbudget":8498.688,"projectcentroid_id":null,"projectcentroid_unified_id":null,"projectname_ar":"إنشاء حدائق وممرات مشاة وساحات بجازان الجز1","projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"010","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[42.6156,16.8249]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":57,"OGC_FID":57,"amana_id":"01001","amanabaladi":"009001","amanatracking":"khatib & Alami 2016-03-15T00:00:00 \\\\  ","approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":null,"created_date":1624422317000,"created_user":"FME","dataowner":"أمانة منطقة جازان FME","datasource":"Amana","dateofend":null,"dateofendcontract":1381179600000,"dateofstart":null,"dateofstartcontract":1334523600000,"description":null,"designed":null,"district_id":"010007016","districtbaladi":"12221","duration":null,"elevation":null,"globalid":"{403A237F-9E70-4A6E-BB8D-8B23DDE2F8A2}","governorate_id":"01001","id":"planning-and-land-and-cadastre_aBX49465980.58","last_edited_date":1624422317000,"last_edited_user":"FME","municipality_id":"010007","municipalitybaladi":"009001","objectid_1":25978,"projectbudget":17961.1,"projectcentroid_id":null,"projectcentroid_unified_id":null,"projectname_ar":"حماية تحسين الوجهات البحرية  ج2 م2 بجازان","projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"010","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[42.5476,16.9195]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":58,"OGC_FID":58,"amana_id":"01001","amanabaladi":"009001","amanatracking":"khatib & Alami 2016-03-15T00:00:00 \\\\  ","approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":null,"created_date":1624422317000,"created_user":"FME","dataowner":"أمانة منطقة جازان FME","datasource":"Amana","dateofend":null,"dateofendcontract":1381352400000,"dateofstart":null,"dateofstartcontract":1334610000000,"description":null,"designed":null,"district_id":"010007016","districtbaladi":"12221","duration":null,"elevation":null,"globalid":"{C6EA53F5-8E64-4CAE-8766-259833086660}","governorate_id":"01001","id":"planning-and-land-and-cadastre_aBX49465980.59","last_edited_date":1624422317000,"last_edited_user":"FME","municipality_id":"010007","municipalitybaladi":"009001","objectid_1":25979,"projectbudget":17961.0,"projectcentroid_id":null,"projectcentroid_unified_id":null,"projectname_ar":"حماية تحسين الوجهات البحرية  ج1 م2","projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"010","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[42.5481,16.9159]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":59,"OGC_FID":59,"amana_id":"01001","amanabaladi":"009001","amanatracking":"khatib & Alami 2016-03-15T00:00:00 \\\\  ","approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":null,"created_date":1624422317000,"created_user":"FME","dataowner":"أمانة منطقة جازان FME","datasource":"Amana","dateofend":null,"dateofendcontract":1381525200000,"dateofstart":null,"dateofstartcontract":1319317200000,"description":null,"designed":null,"district_id":"010007016","districtbaladi":"12221","duration":null,"elevation":null,"globalid":"{70AFFB5E-E917-4876-B4CC-8235AD80E148}","governorate_id":"01001","id":"planning-and-land-and-cadastre_aBX49465980.60","last_edited_date":1624422317000,"last_edited_user":"FME","municipality_id":"010007","municipalitybaladi":"009001","objectid_1":25980,"projectbudget":19974.825,"projectcentroid_id":null,"projectcentroid_unified_id":null,"projectname_ar":"انشاء حدائق ومسطحات خضراء  بجازان","projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"010","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[42.5452,16.9135]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":60,"OGC_FID":60,"amana_id":"01001","amanabaladi":"009001","amanatracking":"khatib & Alami 2016-03-15T00:00:00 \\\\  ","approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":null,"created_date":1624422317000,"created_user":"FME","dataowner":"أمانة منطقة جازان FME","datasource":"Amana","dateofend":null,"dateofendcontract":1315774800000,"dateofstart":null,"dateofstartcontract":1285534800000,"description":null,"designed":null,"district_id":"010007011","districtbaladi":"5564","duration":null,"elevation":null,"globalid":"{FB1087E9-9C08-48D0-A43E-D53698FB89EF}","governorate_id":"01001","id":"planning-and-land-and-cadastre_aBX49465980.61","last_edited_date":1624422317000,"last_edited_user":"FME","municipality_id":"010007","municipalitybaladi":"009001","objectid_1":25981,"projectbudget":3689.94,"projectcentroid_id":null,"projectcentroid_unified_id":null,"projectname_ar":"انشاء خزانات وشبكات للري لزيادة المسطحات الخضراء","projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"010","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[42.5438,16.8779]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":61,"OGC_FID":61,"amana_id":"01001","amanabaladi":"009001","amanatracking":"khatib & Alami 2016-03-15T00:00:00 \\\\  ","approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":null,"created_date":1624422317000,"created_user":"FME","dataowner":"أمانة منطقة جازان FME","datasource":"Amana","dateofend":null,"dateofendcontract":1315774800000,"dateofstart":null,"dateofstartcontract":1285534800000,"description":null,"designed":null,"district_id":"010007009","districtbaladi":"1569","duration":null,"elevation":null,"globalid":"{47A034E3-74AD-4FCB-A2A1-CBC68773DBB2}","governorate_id":"01001","id":"planning-and-land-and-cadastre_aBX49465980.62","last_edited_date":1624422317000,"last_edited_user":"FME","municipality_id":"010007","municipalitybaladi":"009001","objectid_1":25982,"projectbudget":3689.94,"projectcentroid_id":null,"projectcentroid_unified_id":null,"projectname_ar":"انشاء خزانات وشبكات للري لزيادة المسطحات الخضراء","projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"010","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[42.6274,16.8789]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":62,"OGC_FID":62,"amana_id":"01001","amanabaladi":"009001","amanatracking":"khatib & Alami 2016-03-15T00:00:00 \\\\  ","approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":null,"created_date":1624422317000,"created_user":"FME","dataowner":"أمانة منطقة جازان FME","datasource":"Amana","dateofend":null,"dateofendcontract":1301864400000,"dateofstart":null,"dateofstartcontract":1239656400000,"description":null,"designed":null,"district_id":"010007024","districtbaladi":"1581","duration":null,"elevation":null,"globalid":"{DE1F5FAB-D635-4265-B8C0-EB6F2FF2D5C9}","governorate_id":"01003","id":"planning-and-land-and-cadastre_aBX49465980.63","last_edited_date":1624422317000,"last_edited_user":"FME","municipality_id":"010007","municipalitybaladi":"009001","objectid_1":25983,"projectbudget":16827.8,"projectcentroid_id":null,"projectcentroid_unified_id":null,"projectname_ar":"سفلتة و أرصفة و انارة بضاحية الملك عبدا لله","projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"010","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[42.6299,17.0054]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":63,"OGC_FID":63,"amana_id":"01001","amanabaladi":"009001","amanatracking":"khatib & Alami 2016-03-15T00:00:00 \\\\  ","approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":null,"created_date":1624422317000,"created_user":"FME","dataowner":"أمانة منطقة جازان FME","datasource":"Amana","dateofend":null,"dateofendcontract":1430254800000,"dateofstart":null,"dateofstartcontract":1274734800000,"description":null,"designed":null,"district_id":"010007016","districtbaladi":"12221","duration":null,"elevation":null,"globalid":"{D384F95F-9F74-453D-B426-D17948D380DF}","governorate_id":"01001","id":"planning-and-land-and-cadastre_aBX49465980.64","last_edited_date":1624422317000,"last_edited_user":"FME","municipality_id":"010007","municipalitybaladi":"009001","objectid_1":25984,"projectbudget":79930.0,"projectcentroid_id":null,"projectcentroid_unified_id":null,"projectname_ar":"انشاء مركز الأمير سلطان ألخضاري ","projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"010","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[42.5552,16.9156]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":64,"OGC_FID":64,"amana_id":"01001","amanabaladi":"009001","amanatracking":"khatib & Alami 2016-03-15T00:00:00 \\\\  ","approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":null,"created_date":1624422317000,"created_user":"FME","dataowner":"أمانة منطقة جازان FME","datasource":"Amana","dateofend":null,"dateofendcontract":1379797200000,"dateofstart":null,"dateofstartcontract":1349557200000,"description":null,"designed":null,"district_id":"010007016","districtbaladi":"12221","duration":null,"elevation":null,"globalid":"{69BF9D69-AFA8-4BBB-9346-35087CE0F1BC}","governorate_id":"01001","id":"planning-and-land-and-cadastre_aBX49465980.65","last_edited_date":1624422317000,"last_edited_user":"FME","municipality_id":"010007","municipalitybaladi":"009001","objectid_1":25985,"projectbudget":4000.0,"projectcentroid_id":null,"projectcentroid_unified_id":null,"projectname_ar":"انشاء ساحات بلدية","projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"010","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[42.5438,16.911]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":65,"OGC_FID":65,"amana_id":"01001","amanabaladi":"009001","amanatracking":"khatib & Alami 2016-03-15T00:00:00 \\\\  ","approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":null,"created_date":1624422317000,"created_user":"FME","dataowner":"أمانة منطقة جازان FME","datasource":"Amana","dateofend":null,"dateofendcontract":1380229200000,"dateofstart":null,"dateofstartcontract":1349989200000,"description":null,"designed":null,"district_id":"010007002","districtbaladi":"12209","duration":null,"elevation":null,"globalid":"{2DD4BCCE-20A3-4E84-90BA-03F525302B75}","governorate_id":"01001","id":"planning-and-land-and-cadastre_aBX49465980.66","last_edited_date":1624422317000,"last_edited_user":"FME","municipality_id":"010007","municipalitybaladi":"009001","objectid_1":25986,"projectbudget":5279.0,"projectcentroid_id":null,"projectcentroid_unified_id":null,"projectname_ar":"حماية تحسين  الوجهات البحرية","projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"010","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[42.545,16.9361]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":66,"OGC_FID":66,"amana_id":"01001","amanabaladi":"009001","amanatracking":"khatib & Alami 2016-03-15T00:00:00 \\\\  ","approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":null,"created_date":1624422317000,"created_user":"FME","dataowner":"أمانة منطقة جازان FME","datasource":"Amana","dateofend":null,"dateofendcontract":1291842000000,"dateofstart":null,"dateofstartcontract":1260738000000,"description":null,"designed":null,"district_id":"010007004","districtbaladi":"1573","duration":null,"elevation":null,"globalid":"{78869936-AC4A-4827-B452-44BF9CD23373}","governorate_id":"01001","id":"planning-and-land-and-cadastre_aBX49465980.67","last_edited_date":1624422317000,"last_edited_user":"FME","municipality_id":"010007","municipalitybaladi":"009001","objectid_1":25987,"projectbudget":2459.0,"projectcentroid_id":null,"projectcentroid_unified_id":null,"projectname_ar":"انشاء شوارع امينة مع النزع","projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"010","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[42.5407,16.8942]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":67,"OGC_FID":67,"amana_id":"01001","amanabaladi":"009001","amanatracking":"khatib & Alami 2016-03-15T00:00:00 \\\\  ","approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":null,"created_date":1624422317000,"created_user":"FME","dataowner":"أمانة منطقة جازان FME","datasource":"Amana","dateofend":null,"dateofendcontract":1392670800000,"dateofstart":null,"dateofstartcontract":1362430800000,"description":null,"designed":null,"district_id":"010007011","districtbaladi":"5564","duration":null,"elevation":null,"globalid":"{69E01C36-EE10-4046-9518-B0E59BD49857}","governorate_id":"01001","id":"planning-and-land-and-cadastre_aBX49465980.68","last_edited_date":1624422317000,"last_edited_user":"FME","municipality_id":"010007","municipalitybaladi":"009001","objectid_1":25988,"projectbudget":4000.0,"projectcentroid_id":null,"projectcentroid_unified_id":null,"projectname_ar":"حفر آبار  وانشاء خزنات و شبكات للري","projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"010","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[42.5464,16.8765]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":68,"OGC_FID":68,"amana_id":"01001","amanabaladi":"009001","amanatracking":"khatib & Alami 2016-03-15T00:00:00 \\\\  ","approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":null,"created_date":1624422317000,"created_user":"FME","dataowner":"أمانة منطقة جازان FME","datasource":"Amana","dateofend":null,"dateofendcontract":1392670800000,"dateofstart":null,"dateofstartcontract":1362430800000,"description":null,"designed":null,"district_id":"010007009","districtbaladi":"1569","duration":null,"elevation":null,"globalid":"{9BD37CF7-22A9-4F76-849F-445428E04465}","governorate_id":"01001","id":"planning-and-land-and-cadastre_aBX49465980.69","last_edited_date":1624422317000,"last_edited_user":"FME","municipality_id":"010007","municipalitybaladi":"009001","objectid_1":25989,"projectbudget":4000.0,"projectcentroid_id":null,"projectcentroid_unified_id":null,"projectname_ar":"حفر آبار  وانشاء خزنات و شبكات للري","projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"010","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[42.6273,16.8787]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":69,"OGC_FID":69,"amana_id":"01001","amanabaladi":"009001","amanatracking":"khatib & Alami 2016-03-15T00:00:00 \\\\  ","approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":null,"created_date":1624422317000,"created_user":"FME","dataowner":"أمانة منطقة جازان FME","datasource":"Amana","dateofend":null,"dateofendcontract":1401051600000,"dateofstart":null,"dateofstartcontract":1370811600000,"description":null,"designed":null,"district_id":"010007025","districtbaladi":"1568","duration":null,"elevation":null,"globalid":"{CC4BE4F4-892B-49E0-AEE1-83285052C2BB}","governorate_id":"01001","id":"planning-and-land-and-cadastre_aBX49465980.70","last_edited_date":1624422317000,"last_edited_user":"FME","municipality_id":"010007","municipalitybaladi":"009001","objectid_1":25990,"projectbudget":1463.0,"projectcentroid_id":null,"projectcentroid_unified_id":null,"projectname_ar":"تنفيذ جسر مشاة على طريق الامير سلطان امام الاسكان الخير","projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"010","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[42.5712,16.8742]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":70,"OGC_FID":70,"amana_id":"01001","amanabaladi":"009001","amanatracking":"khatib & Alami 2016-03-15T00:00:00 \\\\  ","approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":null,"created_date":1624422317000,"created_user":"FME","dataowner":"أمانة منطقة جازان FME","datasource":"Amana","dateofend":null,"dateofendcontract":1400101200000,"dateofstart":null,"dateofstartcontract":1379365200000,"description":null,"designed":null,"district_id":"010007019","districtbaladi":"12198","duration":null,"elevation":null,"globalid":"{2DF82A98-0D69-47CA-80F4-A1F13CA02E79}","governorate_id":"01001","id":"planning-and-land-and-cadastre_aBX49465980.71","last_edited_date":1624422317000,"last_edited_user":"FME","municipality_id":"010007","municipalitybaladi":"009001","objectid_1":25991,"projectbudget":1175.0,"projectcentroid_id":null,"projectcentroid_unified_id":null,"projectname_ar":"دراسة و تصميم تصريف مياه الأمطار","projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"010","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[42.5943,16.8707]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":71,"OGC_FID":71,"amana_id":"01001","amanabaladi":"009001","amanatracking":"khatib & Alami 2016-03-15T00:00:00 \\\\  ","approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":null,"created_date":1624422317000,"created_user":"FME","dataowner":"أمانة منطقة جازان FME","datasource":"Amana","dateofend":null,"dateofendcontract":1385067600000,"dateofstart":null,"dateofstartcontract":1369515600000,"description":null,"designed":null,"district_id":"010007002","districtbaladi":"12209","duration":null,"elevation":null,"globalid":"{FD4C60D0-D326-42A5-9577-3DC2E81499D4}","governorate_id":"01001","id":"planning-and-land-and-cadastre_aBX49465980.72","last_edited_date":1624422317000,"last_edited_user":"FME","municipality_id":"010007","municipalitybaladi":"009001","objectid_1":25992,"projectbudget":990.0,"projectcentroid_id":null,"projectcentroid_unified_id":null,"projectname_ar":"دراسة و تصميم الوجهات البحرية ","projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"010","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[42.5448,16.9379]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":72,"OGC_FID":72,"amana_id":"01001","amanabaladi":"009001","amanatracking":"khatib & Alami 2016-03-15T00:00:00 \\\\  ","approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":null,"created_date":1624422317000,"created_user":"FME","dataowner":"أمانة منطقة جازان FME","datasource":"Amana","dateofend":null,"dateofendcontract":1396299600000,"dateofstart":null,"dateofstartcontract":1366059600000,"description":null,"designed":null,"district_id":"010007021","districtbaladi":"12205","duration":null,"elevation":null,"globalid":"{740F28AA-32F6-4E62-AE62-07D9D511260E}","governorate_id":"01001","id":"planning-and-land-and-cadastre_aBX49465980.73","last_edited_date":1624422317000,"last_edited_user":"FME","municipality_id":"010007","municipalitybaladi":"009001","objectid_1":25993,"projectbudget":60238.0,"projectcentroid_id":null,"projectcentroid_unified_id":null,"projectname_ar":"اعداد الدرسات و التصاميم لتطوير و تنمية ضاحية الملك عبد الله بجازان","projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"010","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[42.5727,16.9898]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":73,"OGC_FID":73,"amana_id":"01001","amanabaladi":"009001","amanatracking":"khatib & Alami 2016-03-15T00:00:00 \\\\  ","approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":null,"created_date":1624422317000,"created_user":"FME","dataowner":"أمانة منطقة جازان FME","datasource":"Amana","dateofend":null,"dateofendcontract":1440795600000,"dateofstart":null,"dateofstartcontract":1285275600000,"description":null,"designed":null,"district_id":"010007016","districtbaladi":"12221","duration":null,"elevation":null,"globalid":"{E51D4BD6-670D-4A0A-95CC-90AD4B242B22}","governorate_id":"01001","id":"planning-and-land-and-cadastre_aBX49465980.74","last_edited_date":1624422317000,"last_edited_user":"FME","municipality_id":"010007","municipalitybaladi":"009001","objectid_1":25994,"projectbudget":91015.0,"projectcentroid_id":null,"projectcentroid_unified_id":null,"projectname_ar":"انشاء مبني الأمانة","projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"010","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[42.5519,16.9164]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":74,"OGC_FID":74,"amana_id":"01001","amanabaladi":"009001","amanatracking":"khatib & Alami 2016-03-15T00:00:00 \\\\  ","approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":null,"created_date":1624422317000,"created_user":"FME","dataowner":"أمانة منطقة جازان FME","datasource":"Amana","dateofend":null,"dateofendcontract":1423947600000,"dateofstart":null,"dateofstartcontract":1393707600000,"description":null,"designed":null,"district_id":"010007016","districtbaladi":"12221","duration":null,"elevation":null,"globalid":"{F96DC697-8D1D-475B-B304-B0C5DBC8BFC2}","governorate_id":"01001","id":"planning-and-land-and-cadastre_aBX49465980.75","last_edited_date":1624422317000,"last_edited_user":"FME","municipality_id":"010007","municipalitybaladi":"009001","objectid_1":25995,"projectbudget":13969.0,"projectcentroid_id":null,"projectcentroid_unified_id":null,"projectname_ar":"إنشاء مرافق عامة وتجهيزها (انشاء سوق خدمات الاسر المنتجة)","projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"010","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[42.5477,16.8993]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":75,"OGC_FID":75,"amana_id":"01001","amanabaladi":"009001","amanatracking":"khatib & Alami 2016-03-15T00:00:00 \\\\  ","approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":null,"created_date":1624422318000,"created_user":"FME","dataowner":"أمانة منطقة جازان FME","datasource":"Amana","dateofend":null,"dateofendcontract":1441573200000,"dateofstart":null,"dateofstartcontract":1379365200000,"description":null,"designed":null,"district_id":"010007028","districtbaladi":"12202","duration":null,"elevation":null,"globalid":"{5117A039-8791-43F5-B784-45D437EF07E8}","governorate_id":"01001","id":"planning-and-land-and-cadastre_aBX49465980.76","last_edited_date":1624422318000,"last_edited_user":"FME","municipality_id":"010007","municipalitybaladi":"009001","objectid_1":25996,"projectbudget":17983.0,"projectcentroid_id":null,"projectcentroid_unified_id":null,"projectname_ar":"سفلتة وأرصفة وانارة للأمانة والبلديات ","projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"010","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[42.6345,16.8226]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":76,"OGC_FID":76,"amana_id":"01001","amanabaladi":"009001","amanatracking":"khatib & Alami 2016-03-15T00:00:00 \\\\  ","approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":null,"created_date":1624422318000,"created_user":"FME","dataowner":"أمانة منطقة جازان FME","datasource":"Amana","dateofend":null,"dateofendcontract":1442091600000,"dateofstart":null,"dateofstartcontract":1363813200000,"description":null,"designed":null,"district_id":"010007006","districtbaladi":"1579","duration":null,"elevation":null,"globalid":"{90232EC2-CE8C-4BD1-B040-18BF0C579927}","governorate_id":"01001","id":"planning-and-land-and-cadastre_aBX49465980.77","last_edited_date":1624422318000,"last_edited_user":"FME","municipality_id":"010007","municipalitybaladi":"009001","objectid_1":25997,"projectbudget":56860.0,"projectcentroid_id":null,"projectcentroid_unified_id":null,"projectname_ar":"انشاء جسور وأنفاق تقاطع دوار التوحيد","projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"010","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[42.5573,16.8914]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":77,"OGC_FID":77,"amana_id":"01001","amanabaladi":"009001","amanatracking":"khatib & Alami 2016-03-15T00:00:00 \\\\  ","approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":null,"created_date":1624422318000,"created_user":"FME","dataowner":"أمانة منطقة جازان FME","datasource":"Amana","dateofend":null,"dateofendcontract":1411765200000,"dateofstart":null,"dateofstartcontract":1349557200000,"description":null,"designed":null,"district_id":"010007021","districtbaladi":"12205","duration":null,"elevation":null,"globalid":"{7445B315-BA9D-4133-9780-573F7178481B}","governorate_id":"01001","id":"planning-and-land-and-cadastre_aBX49465980.78","last_edited_date":1624422318000,"last_edited_user":"FME","municipality_id":"010007","municipalitybaladi":"009001","objectid_1":25998,"projectbudget":63659.0,"projectcentroid_id":null,"projectcentroid_unified_id":null,"projectname_ar":"سفلتة وأرصفة وانارة لضاحية الملك عبد الله  المرحلة 1 ","projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"010","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[42.5722,16.9929]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":78,"OGC_FID":78,"amana_id":"01001","amanabaladi":"009001","amanatracking":"khatib & Alami 2016-03-15T00:00:00 \\\\  ","approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":null,"created_date":1624422318000,"created_user":"FME","dataowner":"أمانة منطقة جازان FME","datasource":"Amana","dateofend":null,"dateofendcontract":1411765200000,"dateofstart":null,"dateofstartcontract":1349557200000,"description":null,"designed":null,"district_id":"010007021","districtbaladi":"12205","duration":null,"elevation":null,"globalid":"{3CC1D4F8-27A4-488D-9E77-2DF74E1DE696}","governorate_id":"01001","id":"planning-and-land-and-cadastre_aBX49465980.79","last_edited_date":1624422318000,"last_edited_user":"FME","municipality_id":"010007","municipalitybaladi":"009001","objectid_1":25999,"projectbudget":83650.0,"projectcentroid_id":null,"projectcentroid_unified_id":null,"projectname_ar":"سفلتة وأرصفة وانارة لضاحية الملك عبد الله  المرحلة 1 ","projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"010","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[42.5784,16.987]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":79,"OGC_FID":79,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001002","districtbaladi":"10007901","duration":null,"elevation":null,"globalid":"{322B120C-4211-4C4E-8070-3EB5B34CB1A0}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.80","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26000,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100200001","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1341,21.5515]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":80,"OGC_FID":80,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001002","districtbaladi":"10007901","duration":null,"elevation":null,"globalid":"{0DF5AFA9-1028-4BDB-9302-68DF424F1E7C}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.81","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26001,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100200002","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1348,21.5514]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":81,"OGC_FID":81,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001002","districtbaladi":"10007901","duration":null,"elevation":null,"globalid":"{351BE19D-1094-40B2-8FB4-4EF5F00F35B9}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.82","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26002,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100200003","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1323,21.5636]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":82,"OGC_FID":82,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001002","districtbaladi":"10007901","duration":null,"elevation":null,"globalid":"{12C8F83A-7E0C-46AE-8DE2-255319BFC322}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.83","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26003,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100200004","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1386,21.561]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":83,"OGC_FID":83,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001002","districtbaladi":"10007901","duration":null,"elevation":null,"globalid":"{7AF09D00-E538-4BC3-9B29-2056CC540549}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.84","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26004,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100200005","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1371,21.561]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":84,"OGC_FID":84,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001002","districtbaladi":"10007901","duration":null,"elevation":null,"globalid":"{2BEB8D5D-EDB9-4E4D-85F2-B4247E3F8E30}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.85","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26005,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100200006","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.134,21.5513]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":85,"OGC_FID":85,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001002","districtbaladi":"10007901","duration":null,"elevation":null,"globalid":"{5F5EBCB9-55D5-4E51-98A7-0D3D33DBB0FD}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.86","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26006,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100200007","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1366,21.5611]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":86,"OGC_FID":86,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001002","districtbaladi":"10007901","duration":null,"elevation":null,"globalid":"{3C39176B-5351-4CE0-8666-AD648FFE27AB}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.87","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26007,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100200008","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.133,21.5636]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":87,"OGC_FID":87,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001002","districtbaladi":"10007901","duration":null,"elevation":null,"globalid":"{EA1CF56A-BDA8-4F14-B914-BA428683EF78}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.88","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26008,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100200009","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1428,21.5624]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":88,"OGC_FID":88,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001002","districtbaladi":"10007901","duration":null,"elevation":null,"globalid":"{BDBF1EB3-EB27-4050-933F-80B06642F887}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.89","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26009,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100200010","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1379,21.561]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":89,"OGC_FID":89,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001002","districtbaladi":"10007901","duration":null,"elevation":null,"globalid":"{8614F103-CD24-4AEB-B892-C6C350D8E1EA}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.90","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26010,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100200011","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1315,21.5613]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":90,"OGC_FID":90,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001002","districtbaladi":"10007901","duration":null,"elevation":null,"globalid":"{D00B6AAA-D512-4C22-9979-E6ECE16D0CEF}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.91","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26011,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100200012","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1343,21.5593]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":91,"OGC_FID":91,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001002","districtbaladi":"10007901","duration":null,"elevation":null,"globalid":"{8121C38C-388C-463F-B587-44F254E36AA7}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.92","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26012,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100200013","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1264,21.5659]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":92,"OGC_FID":92,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001002","districtbaladi":"10007901","duration":null,"elevation":null,"globalid":"{D8E4C13D-F04D-4A26-9B73-919CBB5BAC35}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.93","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26013,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100200014","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1372,21.5513]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":93,"OGC_FID":93,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001002","districtbaladi":"10007901","duration":null,"elevation":null,"globalid":"{0FBE5FD5-935F-497C-8F68-10DE424539AA}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.94","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26014,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100200015","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1365,21.5592]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":94,"OGC_FID":94,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001002","districtbaladi":"10007901","duration":null,"elevation":null,"globalid":"{005DCA55-200B-4C8A-8F24-0A382900EBC0}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.95","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26015,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100200016","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1417,21.5502]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":95,"OGC_FID":95,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001002","districtbaladi":"10007901","duration":null,"elevation":null,"globalid":"{5EDE192E-7B9B-4521-8D21-7B3CD31E4C4D}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.96","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26016,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100200017","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1364,21.5635]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":96,"OGC_FID":96,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001002","districtbaladi":"10007901","duration":null,"elevation":null,"globalid":"{E084ECFE-26EE-4716-83A7-917FBFB2EEE2}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.97","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26017,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100200018","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1389,21.5732]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":97,"OGC_FID":97,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001002","districtbaladi":"10007901","duration":null,"elevation":null,"globalid":"{67BE5AA4-A0D2-4454-8F0F-CA564DA445EE}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.98","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26018,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100200019","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1431,21.5718]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":98,"OGC_FID":98,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001002","districtbaladi":"10007901","duration":null,"elevation":null,"globalid":"{2331C9A6-3E08-4CEA-B3AC-369447844350}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.99","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26019,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100200020","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1286,21.5596]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":99,"OGC_FID":99,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001002","districtbaladi":"10007901","duration":null,"elevation":null,"globalid":"{F7E27458-A758-4EA5-9DC5-A391BFD4956E}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.100","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26020,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100200021","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1423,21.5735]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":100,"OGC_FID":100,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001002","districtbaladi":"10007901","duration":null,"elevation":null,"globalid":"{DB71F674-EE9C-4786-A665-A225B41D7D56}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.101","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26021,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100200022","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1262,21.5639]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":101,"OGC_FID":101,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001002","districtbaladi":"10007901","duration":null,"elevation":null,"globalid":"{EE250E08-D0A9-46BC-B332-B9DEF20A48B9}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.102","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26022,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100200023","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1408,21.5726]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":102,"OGC_FID":102,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001002","districtbaladi":"10007901","duration":null,"elevation":null,"globalid":"{834E9B4C-B13B-42EF-A8DA-EDE536735A8A}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.103","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26023,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100200024","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1406,21.5737]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":103,"OGC_FID":103,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001002","districtbaladi":"10007901","duration":null,"elevation":null,"globalid":"{CE2F89C9-105C-4336-9FC6-9A04DEDE8D73}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.104","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26024,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100200025","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1379,21.5616]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":104,"OGC_FID":104,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001002","districtbaladi":"10007901","duration":null,"elevation":null,"globalid":"{486C095C-D9D7-4BB9-8364-520CF2911219}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.105","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26025,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100200026","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1431,21.5691]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":105,"OGC_FID":105,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001002","districtbaladi":"10007901","duration":null,"elevation":null,"globalid":"{D86003D3-DA6C-4CE8-A5A7-0898428E844F}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.106","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26026,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100200027","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1399,21.5736]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":106,"OGC_FID":106,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001002","districtbaladi":"10007901","duration":null,"elevation":null,"globalid":"{9AA95A3E-F531-4AF1-A928-ED8A0CADF928}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.107","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26027,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100200028","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1415,21.5733]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":107,"OGC_FID":107,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001002","districtbaladi":"10007901","duration":null,"elevation":null,"globalid":"{51F912FA-9AA1-4DCC-8D0F-0CB6B4B8F398}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.108","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26028,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100200029","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1398,21.5591]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":108,"OGC_FID":108,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001002","districtbaladi":"10007901","duration":null,"elevation":null,"globalid":"{67A60BBA-C1BC-47DF-9DCB-D7CB13C5A35A}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.109","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26029,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100200030","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1379,21.5599]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":109,"OGC_FID":109,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001002","districtbaladi":"10007901","duration":null,"elevation":null,"globalid":"{7AD4DA8D-1004-475A-8935-602284E9BF67}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.110","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26030,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100200031","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1336,21.5636]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":110,"OGC_FID":110,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001002","districtbaladi":"10007901","duration":null,"elevation":null,"globalid":"{5305EF6C-10AE-4277-BDC7-A686B2D0F0F6}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.111","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26031,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100200032","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.142,21.5511]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":111,"OGC_FID":111,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001002","districtbaladi":"10007901","duration":null,"elevation":null,"globalid":"{0AC7D00A-93DC-4416-B9B8-3328D1107AA0}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.112","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26032,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100200033","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1345,21.5636]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":112,"OGC_FID":112,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001002","districtbaladi":"10007901","duration":null,"elevation":null,"globalid":"{FAFE2529-8C70-47A4-912D-C9AE39C0390E}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.113","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26033,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100200034","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1408,21.5731]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":113,"OGC_FID":113,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001002","districtbaladi":"10007901","duration":null,"elevation":null,"globalid":"{95806088-EB2A-4D92-9924-0DD9D77FC4D4}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.114","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26034,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100200035","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.138,21.5634]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":114,"OGC_FID":114,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001002","districtbaladi":"10007901","duration":null,"elevation":null,"globalid":"{E8BB4FDA-29A4-4225-A915-50C5468DB03C}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.115","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26035,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100200036","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.138,21.5513]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":115,"OGC_FID":115,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001002","districtbaladi":"10007901","duration":null,"elevation":null,"globalid":"{FD9B970C-C262-4E45-8D34-6B858D32BD77}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.116","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26036,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100200037","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1342,21.5636]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":116,"OGC_FID":116,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001002","districtbaladi":"10007901","duration":null,"elevation":null,"globalid":"{A2B5AABE-330F-4DFE-9899-FE6CD9C0235F}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.117","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26037,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100200038","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1429,21.5647]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":117,"OGC_FID":117,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001002","districtbaladi":"10007901","duration":null,"elevation":null,"globalid":"{C3E5991B-7004-4DEE-9782-F6B01D284A71}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.118","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26038,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100200039","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1365,21.5514]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":118,"OGC_FID":118,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001002","districtbaladi":"10007901","duration":null,"elevation":null,"globalid":"{9F3E4C44-2F3C-4580-BC73-E8B1E41E664E}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.119","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26039,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100200040","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1409,21.5591]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":119,"OGC_FID":119,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001002","districtbaladi":"10007901","duration":null,"elevation":null,"globalid":"{FB021031-9403-4BF8-B8B3-FEB466F52A92}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.120","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26040,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100200041","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1365,21.5599]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":120,"OGC_FID":120,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001002","districtbaladi":"10007901","duration":null,"elevation":null,"globalid":"{D987909E-05D7-4436-8712-AF36E0B33BC7}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.121","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26041,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100200042","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1418,21.5499]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":121,"OGC_FID":121,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001002","districtbaladi":"10007901","duration":null,"elevation":null,"globalid":"{8A1DC082-2496-4347-B895-909DB8F9552A}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.122","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26042,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100200043","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1372,21.5634]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":122,"OGC_FID":122,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001002","districtbaladi":"10007901","duration":null,"elevation":null,"globalid":"{62C9008B-BCA7-47EE-BE6D-243DE3B02066}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.123","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26043,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100200044","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1267,21.5718]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":123,"OGC_FID":123,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001002","districtbaladi":"10007901","duration":null,"elevation":null,"globalid":"{CA060C9E-BB17-42B2-A7B0-DCE27EB20672}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.124","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26044,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100200045","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1266,21.5701]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":124,"OGC_FID":124,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001002","districtbaladi":"10007901","duration":null,"elevation":null,"globalid":"{356B7F4D-9227-47BE-AF25-258B7F190B92}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.125","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26045,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100200046","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1427,21.5591]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":125,"OGC_FID":125,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001002","districtbaladi":"10007901","duration":null,"elevation":null,"globalid":"{7FB7BA91-2738-49C4-B389-29EA73515F4A}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.126","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26046,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100200047","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.143,21.5681]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":126,"OGC_FID":126,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001002","districtbaladi":"10007901","duration":null,"elevation":null,"globalid":"{0BADA912-0D48-4515-9607-28A1E082ED3D}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.127","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26047,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100200048","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.138,21.5628]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":127,"OGC_FID":127,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001002","districtbaladi":"10007901","duration":null,"elevation":null,"globalid":"{14F51BA3-916F-48E4-BF23-2CD8D9007887}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.128","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26048,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100200049","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1261,21.5613]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":128,"OGC_FID":128,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001002","districtbaladi":"10007901","duration":null,"elevation":null,"globalid":"{AE2E46B7-DAF9-417E-99B6-AA6A1A8B815D}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.129","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26049,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100200050","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1408,21.5718]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":129,"OGC_FID":129,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001002","districtbaladi":"10007901","duration":null,"elevation":null,"globalid":"{9AF01787-3181-40BA-80D1-D4BE7CBA0832}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.130","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26050,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100200051","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1314,21.5516]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":130,"OGC_FID":130,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001002","districtbaladi":"10007901","duration":null,"elevation":null,"globalid":"{89E278A4-518F-4919-8765-3A4E75E172DF}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.131","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26051,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100200052","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1316,21.5595]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":131,"OGC_FID":131,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001002","districtbaladi":"10007901","duration":null,"elevation":null,"globalid":"{A34A0631-9868-4799-9D55-6AB62CAE45AC}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.132","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26052,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100200053","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1353,21.5593]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":132,"OGC_FID":132,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001002","districtbaladi":"10007901","duration":null,"elevation":null,"globalid":"{101F71EF-5126-4393-8725-6DCA74ED0AA9}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.133","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26053,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100200054","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1431,21.5701]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":133,"OGC_FID":133,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001002","districtbaladi":"10007901","duration":null,"elevation":null,"globalid":"{87516862-238B-4D76-B07F-4A426294C795}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.134","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26054,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100200055","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1334,21.5594]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":134,"OGC_FID":134,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001002","districtbaladi":"10007901","duration":null,"elevation":null,"globalid":"{F63F7658-CA91-404C-A9E2-C70B12AA19E8}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.135","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26055,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100200056","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1267,21.5721]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":135,"OGC_FID":135,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001002","districtbaladi":"10007901","duration":null,"elevation":null,"globalid":"{5412EE25-4D4A-435B-82F5-8F1948C15044}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.136","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26056,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100200057","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1263,21.5648]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":136,"OGC_FID":136,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001002","districtbaladi":"10007901","duration":null,"elevation":null,"globalid":"{8BB82F57-E9C2-4B51-8DD4-ACAC72B64C27}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.137","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26057,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100200058","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1353,21.5635]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":137,"OGC_FID":137,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001002","districtbaladi":"10007901","duration":null,"elevation":null,"globalid":"{E142A8C4-9864-4E95-8A43-A3987165AF93}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.138","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26058,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100200059","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1308,21.5602]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":138,"OGC_FID":138,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001002","districtbaladi":"10007901","duration":null,"elevation":null,"globalid":"{DE54D435-84B3-4C90-98F5-6A983F109C57}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.139","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26059,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100200060","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1266,21.5687]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":139,"OGC_FID":139,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001002","districtbaladi":"10007901","duration":null,"elevation":null,"globalid":"{D71A383C-5D09-43A6-A8AF-3879515135C8}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.140","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26060,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100200061","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1398,21.5512]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":140,"OGC_FID":140,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001002","districtbaladi":"10007901","duration":null,"elevation":null,"globalid":"{3D6C5B94-6428-461D-9607-AF0B16C2E1A5}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.141","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26061,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100200062","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1278,21.5596]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":141,"OGC_FID":141,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001002","districtbaladi":"10007901","duration":null,"elevation":null,"globalid":"{4CBF888C-3067-4997-98B8-A1B08ECB9BA9}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.142","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26062,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100200063","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1385,21.5598]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":142,"OGC_FID":142,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001002","districtbaladi":"10007901","duration":null,"elevation":null,"globalid":"{F90DBEC8-B825-4E33-9C02-FBF1EDF5F718}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.143","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26063,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100200064","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1294,21.5596]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":143,"OGC_FID":143,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001002","districtbaladi":"10007901","duration":null,"elevation":null,"globalid":"{FB9C311B-E7D2-4C7E-BB2A-1E41CF914FB4}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.144","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26064,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100200065","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1432,21.5725]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":144,"OGC_FID":144,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001002","districtbaladi":"10007901","duration":null,"elevation":null,"globalid":"{8C13F229-6F0F-4790-AC6C-749BCF7F5312}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.145","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26065,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100200066","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1301,21.5595]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":145,"OGC_FID":145,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001002","districtbaladi":"10007901","duration":null,"elevation":null,"globalid":"{FA20849A-5344-42F2-AD3A-FCCD2233BE9C}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.146","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26066,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100200067","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.126,21.5597]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":146,"OGC_FID":146,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001002","districtbaladi":"10007901","duration":null,"elevation":null,"globalid":"{D0CBFB73-06EA-4020-9169-0EFF59847893}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.147","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26067,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100200068","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1379,21.5605]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":147,"OGC_FID":147,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001002","districtbaladi":"10007901","duration":null,"elevation":null,"globalid":"{37B58D66-AAD3-44C2-816A-0AB49233807B}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.148","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26068,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100200069","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1385,21.5592]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":148,"OGC_FID":148,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001002","districtbaladi":"10007901","duration":null,"elevation":null,"globalid":"{F2ABC427-06DA-4B1D-820E-540715E36758}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.149","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26069,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100200070","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1261,21.562]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":149,"OGC_FID":149,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001002","districtbaladi":"10007901","duration":null,"elevation":null,"globalid":"{337E63A4-5931-4D3B-9FC7-572C243B2BBE}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.150","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26070,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100200071","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1261,21.5606]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":150,"OGC_FID":150,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001002","districtbaladi":"10007901","duration":null,"elevation":null,"globalid":"{888D207C-702F-48C8-A8D1-045F911748AD}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.151","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26071,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100200072","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1264,21.5671]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":151,"OGC_FID":151,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001002","districtbaladi":"10007901","duration":null,"elevation":null,"globalid":"{541950D4-B645-43F6-899E-67C61A4E7AC5}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.152","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26072,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100200073","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1269,21.5597]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":152,"OGC_FID":152,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001002","districtbaladi":"10007901","duration":null,"elevation":null,"globalid":"{4FA35362-1D66-4779-A907-3ADBCA1FC980}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.153","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26073,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100200074","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1427,21.5613]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":153,"OGC_FID":153,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001002","districtbaladi":"10007901","duration":null,"elevation":null,"globalid":"{0A2BBF1D-3886-4FCF-9668-6366AC82BCD2}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.154","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26074,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100200075","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1316,21.5618]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":154,"OGC_FID":154,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001002","districtbaladi":"10007901","duration":null,"elevation":null,"globalid":"{EFCB5BAA-24C1-4F5A-B00C-B84D5D4E4026}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.155","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26075,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100200076","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1431,21.5716]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":155,"OGC_FID":155,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001002","districtbaladi":"10007901","duration":null,"elevation":null,"globalid":"{79E77481-2911-4EB5-B4C5-78F101E7616B}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.156","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26076,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100200077","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1379,21.5621]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":156,"OGC_FID":156,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001002","districtbaladi":"10007901","duration":null,"elevation":null,"globalid":"{1B4A0573-FE9C-47A2-845C-0D69C814C98F}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.157","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26077,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100200078","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1407,21.5512]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":157,"OGC_FID":157,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001002","districtbaladi":"10007901","duration":null,"elevation":null,"globalid":"{18BE047C-61CC-4AFC-BC25-9B0E53BC33AC}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.158","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26078,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100200079","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.126,21.5599]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":158,"OGC_FID":158,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001002","districtbaladi":"10007901","duration":null,"elevation":null,"globalid":"{9821DF77-4E65-4947-A205-732301CD2FD1}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.159","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26079,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100200080","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1431,21.5703]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":159,"OGC_FID":159,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001002","districtbaladi":"10007901","duration":null,"elevation":null,"globalid":"{741E594F-8CAE-47DE-956A-5B5BC55A49C7}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.160","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26080,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100200081","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1432,21.5745]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":160,"OGC_FID":160,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001002","districtbaladi":"10007901","duration":null,"elevation":null,"globalid":"{73180D5E-A6CE-4980-92C3-E0F1E62666C1}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.161","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26081,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100200082","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1356,21.5514]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":161,"OGC_FID":161,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001002","districtbaladi":"10007901","duration":null,"elevation":null,"globalid":"{2547DFDA-64AE-4605-B148-F8D4038AD7AF}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.162","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26082,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100200083","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1389,21.5513]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":162,"OGC_FID":162,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001002","districtbaladi":"10007901","duration":null,"elevation":null,"globalid":"{58153112-C71D-4CE6-960B-4193051875DB}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.163","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26083,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100200084","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1331,21.5515]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":163,"OGC_FID":163,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001002","districtbaladi":"10007901","duration":null,"elevation":null,"globalid":"{82ECD2D1-C1AC-4DCD-AD46-AC6CA1875229}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.164","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26084,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100200085","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1323,21.5624]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":164,"OGC_FID":164,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001002","districtbaladi":"10007901","duration":null,"elevation":null,"globalid":"{B4983339-1296-4996-8290-182754B45877}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.165","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26085,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100200086","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1262,21.5635]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":165,"OGC_FID":165,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001002","districtbaladi":"10007901","duration":null,"elevation":null,"globalid":"{B9A4074F-4D33-4E75-BEF6-BD372CA75984}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.166","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26086,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100200087","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1427,21.5605]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":166,"OGC_FID":166,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001002","districtbaladi":"10007901","duration":null,"elevation":null,"globalid":"{C9D99323-1C11-4460-AA18-32FF7FBFAB85}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.167","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26087,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100200088","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1263,21.5653]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":167,"OGC_FID":167,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001002","districtbaladi":"10007901","duration":null,"elevation":null,"globalid":"{3140E56B-7EC1-4B39-A946-39D781DF6771}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.168","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26088,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100200089","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1378,21.5592]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":168,"OGC_FID":168,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001002","districtbaladi":"10007901","duration":null,"elevation":null,"globalid":"{E7AE63DA-0174-4E1C-9C0A-CFFE36AC7226}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.169","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26089,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100200090","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1322,21.5618]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":169,"OGC_FID":169,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001002","districtbaladi":"10007901","duration":null,"elevation":null,"globalid":"{5C0630B1-87FA-4700-BF51-F2B1914301AE}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.170","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26090,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100200091","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1392,21.5591]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":170,"OGC_FID":170,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001002","districtbaladi":"10007901","duration":null,"elevation":null,"globalid":"{6362CB48-919C-4428-8C27-BF28B9DF1BF4}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.171","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26091,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100200092","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1324,21.5601]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":171,"OGC_FID":171,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001002","districtbaladi":"10007901","duration":null,"elevation":null,"globalid":"{8EC01127-F4BA-4965-B62C-D1AA4C7673D8}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.172","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26092,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100200093","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1265,21.5681]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":172,"OGC_FID":172,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001002","districtbaladi":"10007901","duration":null,"elevation":null,"globalid":"{C2123359-B9E5-4E31-95A9-D8A93DE42B20}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.173","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26093,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100200094","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1261,21.5617]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":173,"OGC_FID":173,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001002","districtbaladi":"10007901","duration":null,"elevation":null,"globalid":"{1EC7C4B1-6BB3-4DDB-ACB7-63CC07B43B15}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.174","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26094,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100200095","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1366,21.5605]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":174,"OGC_FID":174,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001002","districtbaladi":"10007901","duration":null,"elevation":null,"globalid":"{94E69887-5463-4B23-83AA-8EDACA887584}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.175","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26095,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100200096","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1262,21.5636]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":175,"OGC_FID":175,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001002","districtbaladi":"10007901","duration":null,"elevation":null,"globalid":"{45215411-155E-4DE9-9C90-FC49276C8070}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.176","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26096,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100200097","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1325,21.5594]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":176,"OGC_FID":176,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001002","districtbaladi":"10007901","duration":null,"elevation":null,"globalid":"{E96B5B65-69D3-4DE1-BF15-6C9F9A7FA4E2}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.177","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26097,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100200098","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1428,21.5635]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":177,"OGC_FID":177,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001002","districtbaladi":"10007901","duration":null,"elevation":null,"globalid":"{A4BEA8A6-EA28-4D30-BE1E-71331A5F2984}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.178","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26098,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100200099","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1308,21.5595]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":178,"OGC_FID":178,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001002","districtbaladi":"10007901","duration":null,"elevation":null,"globalid":"{BC41B5DE-C034-4F44-9090-B16F9F05D2F1}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.179","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26099,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100200100","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1324,21.5607]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":179,"OGC_FID":179,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001002","districtbaladi":"10007901","duration":null,"elevation":null,"globalid":"{9BFD6E4E-E1C2-46B4-9257-FAC930515C03}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.180","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26100,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100200101","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1427,21.5597]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":180,"OGC_FID":180,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001002","districtbaladi":"10007901","duration":null,"elevation":null,"globalid":"{B4D57A0E-D0EF-43D5-98F0-C8A2AC82B419}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.181","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26101,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100200102","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1315,21.5607]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":181,"OGC_FID":181,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":null,"globalid":"{74862CF2-0F21-4A3A-8B13-546C747A2990}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.182","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26102,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100400001","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1399,21.6432]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":182,"OGC_FID":182,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":null,"globalid":"{CDEB3937-FA06-4FF5-BE5A-97D5AFA95A8E}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.183","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26103,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100400002","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1415,21.6316]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":183,"OGC_FID":183,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Civil Work Company Ltd. (CWC)","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1483045200000,"dateofendcontract":1483045200000,"dateofstart":1388350800000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":8.69,"globalid":"{8A145C4E-A124-4F8D-BFBB-13D4DD526964}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.184","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26104,"projectbudget":null,"projectcentroid_id":"S3_13011","projectcentroid_unified_id":"00200100400003","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1483,21.6186]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":184,"OGC_FID":184,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Civil Work Company Ltd. (CWC)","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1483045200000,"dateofendcontract":1483045200000,"dateofstart":1388350800000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":7.62,"globalid":"{846DEE64-BA9F-41EB-90B5-CC5DE7D6AB89}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.185","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26105,"projectbudget":null,"projectcentroid_id":"S3_13011","projectcentroid_unified_id":"00200100400004","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1311,21.6386]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":185,"OGC_FID":185,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":null,"globalid":"{69FAD924-D9BD-4467-A020-7D72175688E8}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.186","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26106,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100400005","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1545,21.6186]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":186,"OGC_FID":186,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":null,"globalid":"{6FE8810F-81A8-4B36-B8C7-70D4E2C79FE2}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.187","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26107,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100400006","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1415,21.6223]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":187,"OGC_FID":187,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":null,"globalid":"{A6EB14B1-22D8-48DF-AD7C-6CEFB0E6DC48}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.188","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26108,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100400007","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1365,21.6251]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":188,"OGC_FID":188,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Civil Work Company Ltd. (CWC)","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1483045200000,"dateofendcontract":1483045200000,"dateofstart":1388350800000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":7.346,"globalid":"{4E61FA13-14F3-411B-9525-16FDDC03182B}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.189","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26109,"projectbudget":null,"projectcentroid_id":"S3_13011","projectcentroid_unified_id":"00200100400008","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1432,21.6245]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":189,"OGC_FID":189,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":null,"globalid":"{E1221B1F-E268-4D8A-9468-21E13C4D643B}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.190","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26110,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100400009","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1374,21.6423]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":190,"OGC_FID":190,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Civil Work Company Ltd. (CWC)","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1483045200000,"dateofendcontract":1483045200000,"dateofstart":1388350800000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":7.68,"globalid":"{5A3A3A1F-AA51-4B99-86E0-E57D1E9DBB88}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.191","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26111,"projectbudget":null,"projectcentroid_id":"S3_13011","projectcentroid_unified_id":"00200100400010","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1421,21.6429]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":191,"OGC_FID":191,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":null,"globalid":"{FF6333D6-BBF9-40C7-8477-74CBC0F48E7F}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.192","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26112,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100400011","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1502,21.6211]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":192,"OGC_FID":192,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":null,"globalid":"{9D79E465-3909-4A16-AEFC-C9FBD3CB15D5}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.193","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26113,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100400012","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1476,21.6203]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":193,"OGC_FID":193,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":null,"globalid":"{B7A9B3CC-3589-4AA2-9148-487636C548DF}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.194","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26114,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100400013","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.15,21.6218]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":194,"OGC_FID":194,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Civil Work Company Ltd. (CWC)","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1483045200000,"dateofendcontract":1483045200000,"dateofstart":1388350800000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":9.413,"globalid":"{A20A8EED-05BF-44A1-9D1E-557C7687367F}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.195","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26115,"projectbudget":null,"projectcentroid_id":"S3_13011","projectcentroid_unified_id":"00200100400014","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1492,21.6162]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":195,"OGC_FID":195,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":null,"globalid":"{7A1EA4C8-EAF0-4AF3-90CF-3AC660BCE7F9}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.196","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26116,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100400015","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1467,21.6163]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":196,"OGC_FID":196,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":null,"globalid":"{03319ACC-9810-45EF-8D01-735713418DB9}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.197","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26117,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100400016","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1421,21.6372]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":197,"OGC_FID":197,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":null,"globalid":"{C40DCE23-2269-46B3-B47A-C6C17AF261CF}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.198","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26118,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100400017","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1554,21.614]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":198,"OGC_FID":198,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":null,"globalid":"{1600C8B3-DD49-47CD-A017-FFDE040DF877}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.199","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26119,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100400018","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1413,21.6219]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":199,"OGC_FID":199,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":null,"globalid":"{96DA4128-7472-4F51-902F-A1CA012357D0}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.200","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26120,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100400019","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1395,21.6158]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":200,"OGC_FID":200,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":null,"globalid":"{01538089-734F-4E07-BF29-80B8BEDAF21A}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.201","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26121,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100400020","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.137,21.63]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":201,"OGC_FID":201,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":null,"globalid":"{73597F07-B2E3-4E1E-B8CE-4993C320F94A}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.202","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26122,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100400021","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1413,21.6113]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":202,"OGC_FID":202,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":null,"globalid":"{E644367F-F243-4D64-9A56-1030D86F3D15}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.203","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26123,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100400022","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1366,21.631]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":203,"OGC_FID":203,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":null,"globalid":"{B9920249-3981-4EC9-AB6C-C3BB52B89407}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.204","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26124,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100400023","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1524,21.6218]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":204,"OGC_FID":204,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Civil Work Company Ltd. (CWC)","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1483045200000,"dateofendcontract":1483045200000,"dateofstart":1388350800000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":7.661,"globalid":"{423A73F0-FCBA-4C72-8077-598A6029AE2C}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.205","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26125,"projectbudget":null,"projectcentroid_id":"S3_13011","projectcentroid_unified_id":"00200100400024","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1383,21.6193]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":205,"OGC_FID":205,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Civil Work Company Ltd. (CWC)","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1483045200000,"dateofendcontract":1483045200000,"dateofstart":1388350800000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":7.73,"globalid":"{6F267FA0-D527-403D-86EA-C3119F7A82E2}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.206","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26126,"projectbudget":null,"projectcentroid_id":"S3_13011","projectcentroid_unified_id":"00200100400025","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1418,21.6437]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":206,"OGC_FID":206,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Civil Work Company Ltd. (CWC)","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1483045200000,"dateofendcontract":1483045200000,"dateofstart":1388350800000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":7.626,"globalid":"{753AC299-DF05-440B-A6CB-7ECCB89C3E66}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.207","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26127,"projectbudget":null,"projectcentroid_id":"S3_13011","projectcentroid_unified_id":"00200100400026","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.145,21.6299]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":207,"OGC_FID":207,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":null,"globalid":"{FDBC253A-4D7F-48ED-8F53-041956DA7AED}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.208","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26128,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100400027","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.138,21.621]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":208,"OGC_FID":208,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":null,"globalid":"{CF2CD233-CC42-4931-BE13-3FB26ECA38CF}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.209","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26129,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100400028","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1403,21.6312]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":209,"OGC_FID":209,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":null,"globalid":"{9E42156C-DC3F-4CD0-AD90-31CBC43F597B}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.210","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26130,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100400029","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1469,21.6201]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":210,"OGC_FID":210,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":null,"globalid":"{3ADF5F01-8070-4747-87B7-802F3C85BC90}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.211","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26131,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100400030","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1334,21.6328]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":211,"OGC_FID":211,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":null,"globalid":"{AA071504-A4E9-4951-B4A4-51F7C3718EDE}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.212","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26132,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100400031","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.145,21.6299]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":212,"OGC_FID":212,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Civil Work Company Ltd. (CWC)","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1483045200000,"dateofendcontract":1483045200000,"dateofstart":1388350800000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":8.243,"globalid":"{DAEB24E8-16BE-4F76-B9C5-9964A9777E92}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.213","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26133,"projectbudget":null,"projectcentroid_id":"S3_13011","projectcentroid_unified_id":"00200100400032","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1366,21.631]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":213,"OGC_FID":213,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Civil Work Company Ltd. (CWC)","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1483045200000,"dateofendcontract":1483045200000,"dateofstart":1388350800000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":7.499,"globalid":"{CC96FD22-6800-41C9-80E6-791FF439176C}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.214","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26134,"projectbudget":null,"projectcentroid_id":"S3_13011","projectcentroid_unified_id":"00200100400033","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1388,21.6175]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":214,"OGC_FID":214,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":null,"globalid":"{073AFFFC-1314-4143-B05E-54264F298DEE}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.215","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26135,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100400034","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1402,21.618]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":215,"OGC_FID":215,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Civil Work Company Ltd. (CWC)","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1483045200000,"dateofendcontract":1483045200000,"dateofstart":1388350800000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":7.557,"globalid":"{9B1A5A70-9AD4-4F1A-8C54-A2C2DB067664}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.216","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26136,"projectbudget":null,"projectcentroid_id":"S3_13011","projectcentroid_unified_id":"00200100400035","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1387,21.6229]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":216,"OGC_FID":216,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Civil Work Company Ltd. (CWC)","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1483045200000,"dateofendcontract":1483045200000,"dateofstart":1388350800000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":7.236,"globalid":"{834FA6B8-FF0D-401B-BD5C-3A4B38D59B31}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.217","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26137,"projectbudget":null,"projectcentroid_id":"S3_13011","projectcentroid_unified_id":"00200100400036","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1408,21.6125]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":217,"OGC_FID":217,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":null,"globalid":"{EF258DEA-F7DE-42FC-90C3-6698F2F689A9}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.218","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26138,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100400037","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.144,21.6325]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":218,"OGC_FID":218,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":null,"globalid":"{32B01007-D187-4B10-AC75-E68EF1D89B1D}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.219","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26139,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100400038","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1546,21.6177]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":219,"OGC_FID":219,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":null,"globalid":"{149F4594-72E7-4F32-968B-9C80AFBE160C}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.220","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26140,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100400039","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1496,21.6227]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":220,"OGC_FID":220,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":null,"globalid":"{CECD0CD6-8673-4FD6-A607-6669DB2B528B}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.221","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26141,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100400040","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1551,21.6152]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":221,"OGC_FID":221,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":null,"globalid":"{E656284A-CD57-4427-A882-7CFE6D84900A}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.222","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26142,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100400041","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1457,21.6255]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":222,"OGC_FID":222,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":null,"globalid":"{085D425E-4F3E-4453-AA68-FF6C2EC98C9B}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.223","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26143,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100400042","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.147,21.6306]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":223,"OGC_FID":223,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":null,"globalid":"{C73A62F1-537D-4AA5-A135-09CEBC0FFC04}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.224","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26144,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100400043","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1376,21.6224]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":224,"OGC_FID":224,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":null,"globalid":"{AE472F50-DCA0-47C4-98D3-AA5B53295158}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.225","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26145,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100400044","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1546,21.6181]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":225,"OGC_FID":225,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":null,"globalid":"{E5FB5670-D836-44A8-A286-003AAC96F8C3}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.226","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26146,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100400045","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1383,21.6193]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":226,"OGC_FID":226,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Civil Work Company Ltd. (CWC)","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1483045200000,"dateofendcontract":1483045200000,"dateofstart":1388350800000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":7.449,"globalid":"{1ED383CD-1045-41C3-A6C7-9AC07C5776D7}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.227","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26147,"projectbudget":null,"projectcentroid_id":"S3_13011","projectcentroid_unified_id":"00200100400046","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.145,21.6253]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":227,"OGC_FID":227,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Civil Work Company Ltd. (CWC)","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1483045200000,"dateofendcontract":1483045200000,"dateofstart":1388350800000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":7.69,"globalid":"{5D668B5D-EB57-4DA4-8336-2FBEC16C9418}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.228","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26148,"projectbudget":null,"projectcentroid_id":"S3_13011","projectcentroid_unified_id":"00200100400047","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1425,21.642]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":228,"OGC_FID":228,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Civil Work Company Ltd. (CWC)","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1483045200000,"dateofendcontract":1483045200000,"dateofstart":1388350800000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":8.101,"globalid":"{676A2A48-9CE5-47D0-AAE4-326DDF0A73F8}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.229","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26149,"projectbudget":null,"projectcentroid_id":"S3_13011","projectcentroid_unified_id":"00200100400048","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1353,21.6282]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":229,"OGC_FID":229,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":null,"globalid":"{CDB1C42F-96C4-4002-9A56-F25602E3704C}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.230","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26150,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100400049","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1549,21.6166]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":230,"OGC_FID":230,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":null,"globalid":"{6A3A29E7-05CB-4B7B-980C-8658EE14294C}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.231","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26151,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100400050","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1455,21.6285]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":231,"OGC_FID":231,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":null,"globalid":"{DBFF63D4-BBCE-48E9-964E-D40B831BF0CC}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.232","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26152,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100400051","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.139,21.6307]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":232,"OGC_FID":232,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":null,"globalid":"{B0AD606C-41F7-4EF8-9B19-A1A3C4E5AE43}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.233","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26153,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100400052","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1407,21.6434]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":233,"OGC_FID":233,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":null,"globalid":"{AFC07DC9-8969-4B60-9085-9B7504E5D7A6}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.234","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26154,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100400053","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1465,21.6259]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":234,"OGC_FID":234,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Civil Work Company Ltd. (CWC)","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1483045200000,"dateofendcontract":1483045200000,"dateofstart":1388350800000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":7.404,"globalid":"{3C33B932-2771-4C3F-8C65-211E515152DC}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.235","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26155,"projectbudget":null,"projectcentroid_id":"S3_13011","projectcentroid_unified_id":"00200100400054","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1432,21.6246]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":235,"OGC_FID":235,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Civil Work Company Ltd. (CWC)","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1483045200000,"dateofendcontract":1483045200000,"dateofstart":1388350800000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":7.505,"globalid":"{3311C9C3-2769-4F1A-95E2-8F0DA131BB99}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.236","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26156,"projectbudget":null,"projectcentroid_id":"S3_13011","projectcentroid_unified_id":"00200100400055","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1457,21.6255]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":236,"OGC_FID":236,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":null,"globalid":"{59ACF2FF-26C6-40B9-B691-CA53A1AE0DCD}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.237","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26157,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100400056","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1545,21.6188]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":237,"OGC_FID":237,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":null,"globalid":"{798B5BA1-7E83-4686-ABF3-413B3FE2BBAD}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.238","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26158,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100400057","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1443,21.625]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":238,"OGC_FID":238,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":null,"globalid":"{8310BB68-908D-4244-91DB-AC3AEAC6F0FB}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.239","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26159,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100400058","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1348,21.6294]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":239,"OGC_FID":239,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Civil Work Company Ltd. (CWC)","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1483045200000,"dateofendcontract":1483045200000,"dateofstart":1388350800000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":9.349,"globalid":"{A590A16A-E0D3-4179-9E2A-0D07DBFC6CA9}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.240","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26160,"projectbudget":null,"projectcentroid_id":"S3_13011","projectcentroid_unified_id":"00200100400059","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1489,21.617]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":240,"OGC_FID":240,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Civil Work Company Ltd. (CWC)","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1483045200000,"dateofendcontract":1483045200000,"dateofstart":1388350800000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":7.459,"globalid":"{66145586-8C32-4921-9148-B063DC067256}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.241","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26161,"projectbudget":null,"projectcentroid_id":"S3_13011","projectcentroid_unified_id":"00200100400060","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1443,21.625]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":241,"OGC_FID":241,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":null,"globalid":"{E7CBFCD4-12DA-47CE-929E-AC9421FB0F81}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.242","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26162,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100400061","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1492,21.6162]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":242,"OGC_FID":242,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Civil Work Company Ltd. (CWC)","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1483045200000,"dateofendcontract":1483045200000,"dateofstart":1388350800000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":7.788,"globalid":"{BBEA7433-7885-4D7D-A38F-7CCFE361AA5B}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.243","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26163,"projectbudget":null,"projectcentroid_id":"S3_13011","projectcentroid_unified_id":"00200100400062","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.138,21.621]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":243,"OGC_FID":243,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Civil Work Company Ltd. (CWC)","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1483045200000,"dateofendcontract":1483045200000,"dateofstart":1388350800000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":7.883,"globalid":"{CFF8F7BB-E60A-48AD-B571-3E49E39C924B}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.244","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26164,"projectbudget":null,"projectcentroid_id":"S3_13011","projectcentroid_unified_id":"00200100400063","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.137,21.624]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":244,"OGC_FID":244,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":null,"globalid":"{579E6408-6837-4B1F-8B57-73D02EBF41E9}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.245","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26165,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100400064","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.137,21.6236]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":245,"OGC_FID":245,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":null,"globalid":"{12E6E3AA-39B7-49C3-9004-0CAECAAFD17E}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.246","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26166,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100400065","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1548,21.6168]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":246,"OGC_FID":246,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":null,"globalid":"{538CDA36-1F81-494D-A36C-9B0FD21EDDBD}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.247","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26167,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100400066","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1417,21.6438]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":247,"OGC_FID":247,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":null,"globalid":"{79B7FC6C-E941-4D2F-A4DA-266D1D2D7893}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.248","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26168,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100400067","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1489,21.617]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":248,"OGC_FID":248,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Civil Work Company Ltd. (CWC)","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1483045200000,"dateofendcontract":1483045200000,"dateofstart":1388350800000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":8.426,"globalid":"{99AC87EA-C892-4A6E-8017-285A505DA992}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.249","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26169,"projectbudget":null,"projectcentroid_id":"S3_13011","projectcentroid_unified_id":"00200100400068","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1478,21.6167]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":249,"OGC_FID":249,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Civil Work Company Ltd. (CWC)","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1483045200000,"dateofendcontract":1483045200000,"dateofstart":1388350800000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":8.612,"globalid":"{EB4F8797-AA5E-4323-8C45-043D679FA0C0}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.250","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26170,"projectbudget":null,"projectcentroid_id":"S3_13011","projectcentroid_unified_id":"00200100400069","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1339,21.6316]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":250,"OGC_FID":250,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":null,"globalid":"{3069120D-A0C7-4A1F-91A4-DD020A498CFD}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.251","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26171,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100400070","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1436,21.6335]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":251,"OGC_FID":251,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":null,"globalid":"{2A65F869-5D4B-4D2D-BD7C-653D361CAE65}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.252","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26172,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100400071","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1473,21.6261]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":252,"OGC_FID":252,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":null,"globalid":"{2D9F91A0-BEBC-418E-94C8-AF8B92066FC0}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.253","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26173,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100400072","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1317,21.6372]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":253,"OGC_FID":253,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Civil Work Company Ltd. (CWC)","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1483045200000,"dateofendcontract":1483045200000,"dateofstart":1388350800000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":8.328,"globalid":"{4C6137A9-F488-4ED0-ADA3-A5E77E75F856}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.254","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26174,"projectbudget":null,"projectcentroid_id":"S3_13011","projectcentroid_unified_id":"00200100400073","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.148,21.6193]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":254,"OGC_FID":254,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Civil Work Company Ltd. (CWC)","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1483045200000,"dateofendcontract":1483045200000,"dateofstart":1388350800000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":8.139,"globalid":"{CBC49B83-85D8-490A-A35A-97B1E1ABB48B}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.255","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26175,"projectbudget":null,"projectcentroid_id":"S3_13011","projectcentroid_unified_id":"00200100400074","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.136,21.6262]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":255,"OGC_FID":255,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Civil Work Company Ltd. (CWC)","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1483045200000,"dateofendcontract":1483045200000,"dateofstart":1388350800000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":9.021,"globalid":"{5BCEDF16-C3EA-4157-B100-854FAAA76177}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.256","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26176,"projectbudget":null,"projectcentroid_id":"S3_13011","projectcentroid_unified_id":"00200100400075","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1486,21.6178]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":256,"OGC_FID":256,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":null,"globalid":"{688D9A8F-728A-440E-AE94-89361B0E2D72}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.257","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26177,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100400076","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1546,21.6178]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":257,"OGC_FID":257,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":null,"globalid":"{2D78D45F-103E-45B2-A12D-DBC451447BFF}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.258","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26178,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100400077","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1547,21.6173]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":258,"OGC_FID":258,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":null,"globalid":"{EBC11343-53A3-4BFA-82F6-5B150921E3F1}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.259","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26179,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100400078","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1494,21.6209]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":259,"OGC_FID":259,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":null,"globalid":"{8903B8F1-8F34-4711-92CB-60C5BF0CA1CF}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.260","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26180,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100400079","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.148,21.6193]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":260,"OGC_FID":260,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":null,"globalid":"{2F1EFA5C-46E6-430F-A674-5FDEECFD66C1}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.261","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26181,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100400080","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1362,21.6319]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":261,"OGC_FID":261,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":null,"globalid":"{652E0CE8-A004-475D-A9D5-AF365B6F1B37}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.262","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26182,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100400081","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1417,21.6381]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":262,"OGC_FID":262,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Civil Work Company Ltd. (CWC)","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1483045200000,"dateofendcontract":1483045200000,"dateofstart":1388350800000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":7.593,"globalid":"{438441EF-31E8-4405-8486-25F64BF9B8CC}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.263","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26183,"projectbudget":null,"projectcentroid_id":"S3_13011","projectcentroid_unified_id":"00200100400082","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1465,21.626]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":263,"OGC_FID":263,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":null,"globalid":"{50C05C55-F6EA-4155-9379-1E54B78CB899}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.264","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26184,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100400083","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1311,21.6386]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":264,"OGC_FID":264,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":null,"globalid":"{69E1CB23-7F5F-423E-B764-3106EE6BC0FA}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.265","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26185,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100400084","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1504,21.624]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":265,"OGC_FID":265,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Civil Work Company Ltd. (CWC)","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1483045200000,"dateofendcontract":1483045200000,"dateofstart":1388350800000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":7.432,"globalid":"{81526B28-9244-480A-AD71-49CC3274B1C0}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.266","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26186,"projectbudget":null,"projectcentroid_id":"S3_13011","projectcentroid_unified_id":"00200100400085","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.139,21.6176]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":266,"OGC_FID":266,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":null,"globalid":"{2E1F000E-9554-42D2-8BBA-CD32EDCE380A}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.267","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26187,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100400086","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.141,21.6236]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":267,"OGC_FID":267,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":null,"globalid":"{8B0B12DD-8507-4514-97C3-416A0FA4608B}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.268","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26188,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100400087","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1366,21.642]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":268,"OGC_FID":268,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":null,"globalid":"{2D3B2775-2FF7-44BB-B2B8-6705322F87E0}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.269","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26189,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100400088","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1339,21.6316]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":269,"OGC_FID":269,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Civil Work Company Ltd. (CWC)","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1483045200000,"dateofendcontract":1483045200000,"dateofstart":1388350800000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":7.338,"globalid":"{45EC590E-FB4A-4E1B-BBBF-4395A4EB7F63}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.270","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26190,"projectbudget":null,"projectcentroid_id":"S3_13011","projectcentroid_unified_id":"00200100400089","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1395,21.6158]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":270,"OGC_FID":270,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":null,"globalid":"{B655DB7D-A990-4126-902D-8F26A52AF063}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.271","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26191,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100400090","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1513,21.6215]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":271,"OGC_FID":271,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":null,"globalid":"{1B06020B-AFA4-452C-9A3E-5E7AD6A6CCC1}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.272","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26192,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100400091","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1554,21.614]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":272,"OGC_FID":272,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":null,"globalid":"{D1A27EFC-D5E0-4B84-BA5E-938C3BBE9D60}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.273","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26193,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100400092","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1354,21.6416]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":273,"OGC_FID":273,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":null,"globalid":"{3BBB4A4D-817C-4B03-92A4-EDA36B491947}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.274","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26194,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100400093","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1426,21.6441]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":274,"OGC_FID":274,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":null,"globalid":"{5F947877-5B8E-4A4E-A373-3B94007E875F}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.275","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26195,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100400094","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.141,21.6401]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":275,"OGC_FID":275,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":null,"globalid":"{7A80CDDB-E521-47DC-9191-6F44F37A0563}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.276","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26196,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100400095","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1438,21.6115]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":276,"OGC_FID":276,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":null,"globalid":"{C29525B0-E976-4C2A-881F-FEE3EF42DF1F}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.277","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26197,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100400096","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1458,21.6197]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":277,"OGC_FID":277,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Civil Work Company Ltd. (CWC)","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1483045200000,"dateofendcontract":1483045200000,"dateofstart":1388350800000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":8.028,"globalid":"{4DFBB506-7F97-400C-A2B0-6DFE81823097}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.278","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26198,"projectbudget":null,"projectcentroid_id":"S3_13011","projectcentroid_unified_id":"00200100400097","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1456,21.616]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":278,"OGC_FID":278,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":null,"globalid":"{64111A0A-1FF5-4B0B-9301-747F775AF704}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.279","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26199,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100400098","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1495,21.6127]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":279,"OGC_FID":279,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Civil Work Company Ltd. (CWC)","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1483045200000,"dateofendcontract":1483045200000,"dateofstart":1388350800000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":8.179,"globalid":"{4243E3F9-F7F0-490B-93A9-8058989ECA6B}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.280","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26200,"projectbudget":null,"projectcentroid_id":"S3_13011","projectcentroid_unified_id":"00200100400099","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1484,21.6264]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":280,"OGC_FID":280,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":null,"globalid":"{4217E597-1C35-482F-96D3-2944EA273914}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.281","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26201,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100400100","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1498,21.6147]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":281,"OGC_FID":281,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Civil Work Company Ltd. (CWC)","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1483045200000,"dateofendcontract":1483045200000,"dateofstart":1388350800000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":7.498,"globalid":"{D8961002-5514-41FD-BD18-C57673A5B4A8}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.282","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26202,"projectbudget":null,"projectcentroid_id":"S3_13011","projectcentroid_unified_id":"00200100400101","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1425,21.6362]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":282,"OGC_FID":282,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":null,"globalid":"{6349058D-D881-4773-A602-53A905707711}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.283","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26203,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100400102","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1491,21.6268]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":283,"OGC_FID":283,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Civil Work Company Ltd. (CWC)","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1483045200000,"dateofendcontract":1483045200000,"dateofstart":1388350800000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":8.273,"globalid":"{A9AE8A0B-1662-47D5-8E15-CCABD6212007}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.284","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26204,"projectbudget":null,"projectcentroid_id":"S3_13011","projectcentroid_unified_id":"00200100400103","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1482,21.6265]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":284,"OGC_FID":284,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":null,"globalid":"{BD2F5C84-ACCE-413C-A051-D2FD86FF0271}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.285","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26205,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100400104","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1478,21.6167]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":285,"OGC_FID":285,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":null,"globalid":"{9577E335-64ED-4388-A89A-198C0F4F2386}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.286","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26206,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100400105","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1483,21.6186]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":286,"OGC_FID":286,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":null,"globalid":"{89A9A0BC-7F07-4D70-8FBB-34B5F6DF8614}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.287","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26207,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100400106","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.138,21.6304]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":287,"OGC_FID":287,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Civil Work Company Ltd. (CWC)","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1483045200000,"dateofendcontract":1483045200000,"dateofstart":1388350800000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":8.087,"globalid":"{7B96D420-342E-4DA6-B413-C330F6433CCC}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.288","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26208,"projectbudget":null,"projectcentroid_id":"S3_13011","projectcentroid_unified_id":"00200100400107","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1361,21.6262]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":288,"OGC_FID":288,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Civil Work Company Ltd. (CWC)","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1483045200000,"dateofendcontract":1483045200000,"dateofstart":1388350800000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":8.796,"globalid":"{43913DC4-AB23-42A4-A3A5-AF0350FBE4D0}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.289","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26209,"projectbudget":null,"projectcentroid_id":"S3_13011","projectcentroid_unified_id":"00200100400108","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1334,21.6328]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":289,"OGC_FID":289,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":null,"globalid":"{1D1DF636-8B69-4E81-A081-8B1EBD581E39}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.290","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26210,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100400109","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1435,21.619]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":290,"OGC_FID":290,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Civil Work Company Ltd. (CWC)","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1483045200000,"dateofendcontract":1483045200000,"dateofstart":1388350800000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":8.201,"globalid":"{E86AD0F5-F7D4-42E7-BA91-2A0297B6F69B}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.291","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26211,"projectbudget":null,"projectcentroid_id":"S3_13011","projectcentroid_unified_id":"00200100400110","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1356,21.6272]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":291,"OGC_FID":291,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":null,"globalid":"{D2DA9199-01BF-432B-9397-86420D37A5D9}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.292","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26212,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100400111","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1432,21.6246]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":292,"OGC_FID":292,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":null,"globalid":"{E4C40A18-9014-419A-BCA4-8767FCEF46E4}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.293","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26213,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100400112","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1416,21.611]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":293,"OGC_FID":293,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":null,"globalid":"{77C40230-7930-42FA-8896-2964174851AE}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.294","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26214,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100400113","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1486,21.6178]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":294,"OGC_FID":294,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":null,"globalid":"{74AEB3C0-E48C-4E8F-8275-273B26E20A03}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.295","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26215,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100400114","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1325,21.635]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":295,"OGC_FID":295,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Civil Work Company Ltd. (CWC)","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1483045200000,"dateofendcontract":1483045200000,"dateofstart":1388350800000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":7.372,"globalid":"{B2A47A1E-498F-41CC-81D1-3ABE3B7E70D6}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.296","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26216,"projectbudget":null,"projectcentroid_id":"S3_13011","projectcentroid_unified_id":"00200100400115","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.145,21.6251]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":296,"OGC_FID":296,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":null,"globalid":"{02232F75-B36A-405B-B6F2-32AE0F84B074}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.297","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26217,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100400116","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1428,21.6217]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":297,"OGC_FID":297,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Civil Work Company Ltd. (CWC)","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1483045200000,"dateofendcontract":1483045200000,"dateofstart":1388350800000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":7.471,"globalid":"{F28CEA9E-C55B-4A86-8C00-7D7E5CA00F6E}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.298","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26218,"projectbudget":null,"projectcentroid_id":"S3_13011","projectcentroid_unified_id":"00200100400117","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1408,21.6237]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":298,"OGC_FID":298,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Civil Work Company Ltd. (CWC)","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1483045200000,"dateofendcontract":1483045200000,"dateofstart":1388350800000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":7.889,"globalid":"{5BD91D13-61CF-4B04-B0F2-49B533B9003A}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.299","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26219,"projectbudget":null,"projectcentroid_id":"S3_13011","projectcentroid_unified_id":"00200100400118","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1403,21.6312]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":299,"OGC_FID":299,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Civil Work Company Ltd. (CWC)","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1483045200000,"dateofendcontract":1483045200000,"dateofstart":1388350800000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":7.745,"globalid":"{088C0CB8-C38E-4019-A84D-8C84DE48EB99}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.300","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26220,"projectbudget":null,"projectcentroid_id":"S3_13011","projectcentroid_unified_id":"00200100400119","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1317,21.6372]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":300,"OGC_FID":300,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":null,"globalid":"{384BBF91-3904-4ADD-835E-CAC447861334}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.301","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26221,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100400120","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1356,21.6272]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":301,"OGC_FID":301,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Civil Work Company Ltd. (CWC)","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1483045200000,"dateofendcontract":1483045200000,"dateofstart":1388350800000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":8.206,"globalid":"{F9CB2F71-E232-41A2-950D-A7B3835C02E1}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.302","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26222,"projectbudget":null,"projectcentroid_id":"S3_13011","projectcentroid_unified_id":"00200100400121","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1467,21.6163]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":302,"OGC_FID":302,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":null,"globalid":"{654604CB-8F10-4A55-82AB-9E8EE752B1DA}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.303","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26223,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100400122","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.154,21.6136]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":303,"OGC_FID":303,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Civil Work Company Ltd. (CWC)","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1483045200000,"dateofendcontract":1483045200000,"dateofstart":1388350800000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":8.092,"globalid":"{DC6CCF56-9106-4DE9-9DCB-A9BA66A2D177}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.304","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26224,"projectbudget":null,"projectcentroid_id":"S3_13011","projectcentroid_unified_id":"00200100400123","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.137,21.63]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":304,"OGC_FID":304,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Civil Work Company Ltd. (CWC)","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1483045200000,"dateofendcontract":1483045200000,"dateofstart":1388350800000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":7.281,"globalid":"{68BDC660-BF9D-49E9-89F6-8510FDC9ADC5}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.305","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26225,"projectbudget":null,"projectcentroid_id":"S3_13011","projectcentroid_unified_id":"00200100400124","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1408,21.6125]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":305,"OGC_FID":305,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Civil Work Company Ltd. (CWC)","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1483045200000,"dateofendcontract":1483045200000,"dateofstart":1388350800000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":7.784,"globalid":"{1FF3CB74-CCF3-497B-B625-DAC891FDE3AD}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.306","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26226,"projectbudget":null,"projectcentroid_id":"S3_13011","projectcentroid_unified_id":"00200100400125","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1322,21.636]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":306,"OGC_FID":306,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":null,"globalid":"{FE029AAE-E83A-4D9F-BCDF-BBE7936E5BD5}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.307","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26227,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100400126","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1505,21.6131]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":307,"OGC_FID":307,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":null,"globalid":"{BDF9B80B-7407-4392-9358-1CBFDA15AEA7}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.308","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26228,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100400127","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.133,21.6339]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":308,"OGC_FID":308,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":null,"globalid":"{F9D5264A-453D-45ED-9394-5B338AF6A0E5}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.309","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26229,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100400128","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1495,21.6154]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":309,"OGC_FID":309,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Civil Work Company Ltd. (CWC)","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1483045200000,"dateofendcontract":1483045200000,"dateofstart":1388350800000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":7.602,"globalid":"{E838495E-0068-4FC1-80FD-78CFEE03A31A}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.310","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26230,"projectbudget":null,"projectcentroid_id":"S3_13011","projectcentroid_unified_id":"00200100400129","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1465,21.626]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":310,"OGC_FID":310,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":null,"globalid":"{8CA6D2DD-C33F-4EB3-B07F-CB484EF939F4}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.311","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26231,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100400130","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1436,21.6117]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":311,"OGC_FID":311,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":null,"globalid":"{51F02AE8-A568-4280-B1AC-AE3C503EF791}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.312","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26232,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100400131","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.147,21.6122]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":312,"OGC_FID":312,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":null,"globalid":"{871E2D10-9A24-4587-BB99-C2E9A0B77D44}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.313","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26233,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100400132","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1547,21.6175]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":313,"OGC_FID":313,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":null,"globalid":"{F6AB03BD-90C2-40F5-9A4C-C15F9421E516}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.314","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26234,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100400133","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1456,21.616]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":314,"OGC_FID":314,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":null,"globalid":"{4603C067-7077-485A-8EC8-5A24CC0779FE}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.315","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26235,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100400134","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1414,21.6391]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":315,"OGC_FID":315,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":null,"globalid":"{5F26552A-1373-49BB-8854-B3A1F627DE1F}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.316","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26236,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100400135","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.136,21.6262]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":316,"OGC_FID":316,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":null,"globalid":"{B2349C58-4E5C-4ECD-BFF1-77D1044DC56D}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.317","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26237,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100400136","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1523,21.6133]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":317,"OGC_FID":317,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":null,"globalid":"{501C15C9-6556-4EC3-8A1F-CB69BA93B259}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.318","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26238,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100400137","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.145,21.6253]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":318,"OGC_FID":318,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Civil Work Company Ltd. (CWC)","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1483045200000,"dateofendcontract":1483045200000,"dateofstart":1388350800000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":7.888,"globalid":"{817E1CB1-FBDE-402E-AB3C-A98477B02B90}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.319","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26239,"projectbudget":null,"projectcentroid_id":"S3_13011","projectcentroid_unified_id":"00200100400138","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1473,21.6261]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":319,"OGC_FID":319,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":null,"globalid":"{3953484D-CA78-4CAA-BDCE-66AF98099802}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.320","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26240,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100400139","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1549,21.6165]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":320,"OGC_FID":320,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Civil Work Company Ltd. (CWC)","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1483045200000,"dateofendcontract":1483045200000,"dateofstart":1388350800000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":7.364,"globalid":"{6162CF6F-E2A4-421A-81A4-865F47AA605A}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.321","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26241,"projectbudget":null,"projectcentroid_id":"S3_13011","projectcentroid_unified_id":"00200100400140","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1401,21.6143]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":321,"OGC_FID":321,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Civil Work Company Ltd. (CWC)","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1483045200000,"dateofendcontract":1483045200000,"dateofstart":1388350800000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":7.61,"globalid":"{9B86EC8E-00E3-4622-950D-4D9FACAFE20E}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.322","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26242,"projectbudget":null,"projectcentroid_id":"S3_13011","projectcentroid_unified_id":"00200100400141","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1417,21.6381]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":322,"OGC_FID":322,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Civil Work Company Ltd. (CWC)","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1483045200000,"dateofendcontract":1483045200000,"dateofstart":1388350800000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":7.546,"globalid":"{02241475-BD3C-4C57-A62C-37A08D127D2C}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.323","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26243,"projectbudget":null,"projectcentroid_id":"S3_13011","projectcentroid_unified_id":"00200100400142","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1436,21.6335]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":323,"OGC_FID":323,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Civil Work Company Ltd. (CWC)","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1483045200000,"dateofendcontract":1483045200000,"dateofstart":1388350800000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":8.324,"globalid":"{3079350E-B406-4681-BFE4-061CECC845DB}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.324","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26244,"projectbudget":null,"projectcentroid_id":"S3_13011","projectcentroid_unified_id":"00200100400143","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1348,21.6294]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":324,"OGC_FID":324,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":null,"globalid":"{8B7E6B80-EE41-4CBF-807C-D14A8E30A906}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.325","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26245,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100400144","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1392,21.6429]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":325,"OGC_FID":325,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":null,"globalid":"{84B7571A-7383-48EB-AA5D-44ED4AC61240}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.326","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26246,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100400145","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1483,21.6234]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":326,"OGC_FID":326,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":null,"globalid":"{AE7846BC-CB2D-4D43-B872-1A729B32E18C}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.327","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26247,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100400146","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1401,21.6143]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":327,"OGC_FID":327,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":null,"globalid":"{F6FDFA71-BCE7-45D9-A96B-0F64753D5217}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.328","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26248,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100400147","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1482,21.6265]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":328,"OGC_FID":328,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Civil Work Company Ltd. (CWC)","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1483045200000,"dateofendcontract":1483045200000,"dateofstart":1388350800000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":8.263,"globalid":"{BE4554F3-C310-4FA0-9B5B-CB8733081ECA}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.329","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26249,"projectbudget":null,"projectcentroid_id":"S3_13011","projectcentroid_unified_id":"00200100400148","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1352,21.6284]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":329,"OGC_FID":329,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":null,"globalid":"{E5165877-79DB-461D-994A-57B7B2A47C3F}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.330","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26250,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100400149","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1398,21.6233]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":330,"OGC_FID":330,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":null,"globalid":"{6DC3FCA3-99AD-4DD7-80FD-0800AE50E375}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.331","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26251,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100400150","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1421,21.622]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":331,"OGC_FID":331,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Civil Work Company Ltd. (CWC)","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1483045200000,"dateofendcontract":1483045200000,"dateofstart":1388350800000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":8.46,"globalid":"{58403D0B-C7AC-4732-BE12-75ECC80E48A8}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.332","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26252,"projectbudget":null,"projectcentroid_id":"S3_13011","projectcentroid_unified_id":"00200100400151","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1343,21.6306]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":332,"OGC_FID":332,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":null,"globalid":"{5D29C384-7D67-48B6-88F4-1D7C02CD1A75}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.333","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26253,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100400152","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1352,21.6284]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":333,"OGC_FID":333,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":null,"globalid":"{06C8847B-EAC6-49E7-BDF9-E432F84ECEA2}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.334","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26254,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100400153","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1544,21.6192]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":334,"OGC_FID":334,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":null,"globalid":"{A05F29A1-F4D3-4EA0-A3E1-54981D5FFEBE}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.335","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26255,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100400154","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1388,21.6175]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":335,"OGC_FID":335,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":null,"globalid":"{4EBEBE72-9106-4ABC-9F95-D54939538B93}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.336","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26256,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100400155","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1406,21.6411]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":336,"OGC_FID":336,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Civil Work Company Ltd. (CWC)","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1483045200000,"dateofendcontract":1483045200000,"dateofstart":1388350800000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":7.534,"globalid":"{BC6A6FC2-E9FF-45C5-81F3-74968FCCCCC6}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.337","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26257,"projectbudget":null,"projectcentroid_id":"S3_13011","projectcentroid_unified_id":"00200100400156","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1466,21.6258]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":337,"OGC_FID":337,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":null,"globalid":"{DE4EFC13-2F83-46C1-A4BE-3D8FC2B006E7}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.338","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26258,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100400157","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1553,21.6146]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":338,"OGC_FID":338,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":null,"globalid":"{62B9445B-FE2C-4575-B6B1-233750C9EA3F}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.339","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26259,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100400158","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1408,21.6125]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":339,"OGC_FID":339,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":null,"globalid":"{9144C018-7662-4514-B8A6-0DC08FE5E668}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.340","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26260,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100400159","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1343,21.6306]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":340,"OGC_FID":340,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":null,"globalid":"{7376BA94-0527-4092-9AB1-F71CECC7D851}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.341","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26261,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100400160","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1409,21.6238]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":341,"OGC_FID":341,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":null,"globalid":"{E36BAD06-1BFE-456A-A0DE-C361A80C26CA}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.342","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26262,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100400161","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.148,21.631]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":342,"OGC_FID":342,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Civil Work Company Ltd. (CWC)","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1483045200000,"dateofendcontract":1483045200000,"dateofstart":1388350800000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":8.167,"globalid":"{3D024769-D3B8-4DD2-9F0A-1D32C299B4F1}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.343","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26263,"projectbudget":null,"projectcentroid_id":"S3_13011","projectcentroid_unified_id":"00200100400162","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.139,21.6307]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":343,"OGC_FID":343,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":null,"globalid":"{2FF547D7-A840-4C64-92DB-F66222E6784D}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.344","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26264,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100400163","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1374,21.6228]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":344,"OGC_FID":344,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":null,"globalid":"{1ABECA55-BFDD-49AE-B17C-35AE39605818}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.345","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26265,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100400164","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1485,21.6206]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":345,"OGC_FID":345,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":null,"globalid":"{ACE6F1B7-3CC9-4D46-9234-EF60A48C5BBD}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.346","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26266,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100400165","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1544,21.619]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":346,"OGC_FID":346,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Civil Work Company Ltd. (CWC)","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1483045200000,"dateofendcontract":1483045200000,"dateofstart":1388350800000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":8.037,"globalid":"{C077EFCD-789E-4CFC-989A-74DE6C9EACE0}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.347","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26267,"projectbudget":null,"projectcentroid_id":"S3_13011","projectcentroid_unified_id":"00200100400166","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1367,21.6244]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":347,"OGC_FID":347,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":null,"globalid":"{36E3DF3B-0838-43C3-922A-D76A82328A12}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.348","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26268,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100400167","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1424,21.6187]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":348,"OGC_FID":348,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":null,"globalid":"{46BA966B-4282-4D69-BC0A-448DB9517BA8}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.349","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26269,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100400168","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1502,21.6272]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":349,"OGC_FID":349,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":null,"globalid":"{B8F3FD59-63E6-41DC-A346-6FA10F902337}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.350","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26270,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100400169","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1432,21.6344]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":350,"OGC_FID":350,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Civil Work Company Ltd. (CWC)","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1483045200000,"dateofendcontract":1483045200000,"dateofstart":1388350800000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":7.738,"globalid":"{F7087ACD-4B13-4EE3-ADA9-F5E7CF118274}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.351","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26271,"projectbudget":null,"projectcentroid_id":"S3_13011","projectcentroid_unified_id":"00200100400170","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1437,21.6154]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":351,"OGC_FID":351,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Civil Work Company Ltd. (CWC)","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1483045200000,"dateofendcontract":1483045200000,"dateofstart":1388350800000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":8.196,"globalid":"{3731600B-C217-48BE-9CA9-AA75D4BDD9C8}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.352","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26272,"projectbudget":null,"projectcentroid_id":"S3_13011","projectcentroid_unified_id":"00200100400171","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.138,21.6304]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":352,"OGC_FID":352,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":null,"globalid":"{90CC08EE-03E1-40C3-B443-D1275FC82765}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.353","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26273,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100400172","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1446,21.6194]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":353,"OGC_FID":353,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":null,"globalid":"{8E00979A-158D-4131-B795-CE9AEF0D2F9A}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.354","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26274,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100400173","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1504,21.6319]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":354,"OGC_FID":354,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Civil Work Company Ltd. (CWC)","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1483045200000,"dateofendcontract":1483045200000,"dateofstart":1388350800000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":7.917,"globalid":"{ED1006AC-31B3-4D49-AB08-1634BF76000C}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.355","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26275,"projectbudget":null,"projectcentroid_id":"S3_13011","projectcentroid_unified_id":"00200100400174","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1415,21.6316]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":355,"OGC_FID":355,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":null,"globalid":"{E01BA305-44B2-45DA-8B1B-BB6D9BE10C36}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.356","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26276,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100400175","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1551,21.6155]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":356,"OGC_FID":356,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Civil Work Company Ltd. (CWC)","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1483045200000,"dateofendcontract":1483045200000,"dateofstart":1388350800000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":9.388,"globalid":"{C192838C-BB80-4D8A-A704-52CAE4EB5E9C}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.357","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26277,"projectbudget":null,"projectcentroid_id":"S3_13011","projectcentroid_unified_id":"00200100400176","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1495,21.6154]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":357,"OGC_FID":357,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":null,"globalid":"{A0A3C9FA-DCF2-42C6-B225-B14A7A0CAB67}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.358","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26278,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100400177","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1397,21.6431]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":358,"OGC_FID":358,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":null,"globalid":"{1A847015-5A70-4A05-8DD1-39B702375668}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.359","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26279,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100400178","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1506,21.6174]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":359,"OGC_FID":359,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":null,"globalid":"{D6BF69FB-B5E0-4361-A0E2-D3EFF8A8B601}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.360","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26280,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100400179","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1413,21.6183]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":360,"OGC_FID":360,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":null,"globalid":"{80480C1E-2944-4FEF-AF2E-A5F4A4AFE250}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.361","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26281,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100400180","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.149,21.6246]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":361,"OGC_FID":361,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":null,"globalid":"{F4C3D152-C9D5-498F-98E2-497699893F6A}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.362","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26282,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100400181","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1548,21.617]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":362,"OGC_FID":362,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Civil Work Company Ltd. (CWC)","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1483045200000,"dateofendcontract":1483045200000,"dateofstart":1388350800000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":7.399,"globalid":"{BADD3AC4-CEC5-4ACC-8D5E-B62E1033921A}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.363","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26283,"projectbudget":null,"projectcentroid_id":"S3_13011","projectcentroid_unified_id":"00200100400182","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.141,21.6237]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":363,"OGC_FID":363,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":null,"globalid":"{C7124342-F727-40CB-ABEA-3469E42E3F1F}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.364","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26284,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100400183","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1425,21.6362]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":364,"OGC_FID":364,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":null,"globalid":"{5F54C5DA-AFF7-4A65-82AB-32BCA56098AD}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.365","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26285,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100400184","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.155,21.6158]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":365,"OGC_FID":365,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":null,"globalid":"{FCD3727C-06D8-4A18-9EE3-69CDB21B6F8A}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.366","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26286,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100400185","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1553,21.6143]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":366,"OGC_FID":366,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Civil Work Company Ltd. (CWC)","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1483045200000,"dateofendcontract":1483045200000,"dateofstart":1388350800000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":7.655,"globalid":"{372AC09D-07FE-48B8-AFE3-9ADC4F85F8FA}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.367","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26287,"projectbudget":null,"projectcentroid_id":"S3_13011","projectcentroid_unified_id":"00200100400186","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.141,21.6401]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":367,"OGC_FID":367,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Civil Work Company Ltd. (CWC)","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1483045200000,"dateofendcontract":1483045200000,"dateofstart":1388350800000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":7.462,"globalid":"{132DC9D4-758C-4BDA-8C21-DE4E81AB4594}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.368","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26288,"projectbudget":null,"projectcentroid_id":"S3_13011","projectcentroid_unified_id":"00200100400187","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1412,21.6239]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":368,"OGC_FID":368,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Civil Work Company Ltd. (CWC)","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1483045200000,"dateofendcontract":1483045200000,"dateofstart":1388350800000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":7.45,"globalid":"{1F767932-468B-4BBA-9BEB-F19B5FBE25AB}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.369","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26289,"projectbudget":null,"projectcentroid_id":"S3_13011","projectcentroid_unified_id":"00200100400188","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1432,21.6344]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":369,"OGC_FID":369,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":null,"globalid":"{7015CF58-042D-4B7D-B67A-281B2590F318}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.370","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26290,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100400189","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1387,21.6229]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":370,"OGC_FID":370,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":null,"globalid":"{80B2FC3B-0939-4A84-B07C-DCAE679B8321}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.371","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26291,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100400190","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.139,21.6176]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":371,"OGC_FID":371,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":null,"globalid":"{3AC9149A-D6F9-4233-BC71-4A18E69E5FAF}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.372","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26292,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100400191","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1413,21.6112]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":372,"OGC_FID":372,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":null,"globalid":"{4E077B15-51C7-452C-9361-F2CB4BA56D51}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.373","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26293,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100400192","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1484,21.6125]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":373,"OGC_FID":373,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":null,"globalid":"{ADAD395D-D622-44AA-9274-623FF96B6FF7}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.374","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26294,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100400193","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1322,21.636]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":374,"OGC_FID":374,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":null,"globalid":"{0CE858BD-8860-4C45-A2A8-AFFA97DB247F}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.375","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26295,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100400194","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1379,21.6425]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":375,"OGC_FID":375,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Civil Work Company Ltd. (CWC)","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1483045200000,"dateofendcontract":1483045200000,"dateofstart":1388350800000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":7.489,"globalid":"{DEBB2257-BD47-471B-BAF7-9738B5EDB4F1}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.376","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26296,"projectbudget":null,"projectcentroid_id":"S3_13011","projectcentroid_unified_id":"00200100400195","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1421,21.6242]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":376,"OGC_FID":376,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Civil Work Company Ltd. (CWC)","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1483045200000,"dateofendcontract":1483045200000,"dateofstart":1388350800000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":9.314,"globalid":"{742DC5A4-3117-4DE2-AA02-C3DB28DD5449}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.377","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26297,"projectbudget":null,"projectcentroid_id":"S3_13011","projectcentroid_unified_id":"00200100400196","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1498,21.6147]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":377,"OGC_FID":377,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Civil Work Company Ltd. (CWC)","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1483045200000,"dateofendcontract":1483045200000,"dateofstart":1388350800000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":8.42,"globalid":"{E03738EC-4D76-4E28-B999-538ACAF0257C}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.378","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26298,"projectbudget":null,"projectcentroid_id":"S3_13011","projectcentroid_unified_id":"00200100400197","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1344,21.6307]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":378,"OGC_FID":378,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":null,"globalid":"{1B098FC7-6EBD-45B6-89EA-E754B0C195EC}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.379","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26299,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100400198","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1545,21.6184]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":379,"OGC_FID":379,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":null,"globalid":"{BD8D458C-AE7C-40ED-B4CF-687FFD7C7489}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.380","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26300,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100400199","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1403,21.6421]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":380,"OGC_FID":380,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":null,"globalid":"{28017B8B-A989-471B-8AC2-9E728FC55AD9}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.381","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26301,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100400200","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1421,21.6242]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":381,"OGC_FID":381,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":null,"globalid":"{4E88A25F-57EE-4A23-B4B4-54CC2FD46FF4}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.382","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26302,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100400201","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.155,21.6161]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":382,"OGC_FID":382,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":null,"globalid":"{A37EDE33-8144-4964-897B-5A865E068AD3}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.383","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26303,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100400202","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1399,21.6428]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":383,"OGC_FID":383,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Civil Work Company Ltd. (CWC)","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1483045200000,"dateofendcontract":1483045200000,"dateofstart":1388350800000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":7.397,"globalid":"{ABBFBCD6-3756-40AB-BDD8-F90F01709845}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.384","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26304,"projectbudget":null,"projectcentroid_id":"S3_13011","projectcentroid_unified_id":"00200100400203","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1409,21.6236]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":384,"OGC_FID":384,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Civil Work Company Ltd. (CWC)","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1483045200000,"dateofendcontract":1483045200000,"dateofstart":1388350800000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":8.018,"globalid":"{80864A89-3E11-4ACF-8560-E7BB008987B3}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.385","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26305,"projectbudget":null,"projectcentroid_id":"S3_13011","projectcentroid_unified_id":"00200100400204","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1365,21.6251]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":385,"OGC_FID":385,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":null,"globalid":"{21204546-DDBA-43F7-8B99-B62A397D3C84}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.386","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26306,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100400205","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1437,21.6154]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":386,"OGC_FID":386,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001004","districtbaladi":"10007830","duration":null,"elevation":null,"globalid":"{96313FC1-438C-44C0-A2E9-DB274FE4AAC9}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.387","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26307,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100400206","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1376,21.6223]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":387,"OGC_FID":387,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001006","districtbaladi":"10007831","duration":null,"elevation":null,"globalid":"{63B2223F-991F-488E-8206-84A6CC081DB2}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.388","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26308,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100600001","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1402,21.6108]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":388,"OGC_FID":388,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001006","districtbaladi":"10007831","duration":null,"elevation":null,"globalid":"{F6F1EDBF-EF4D-47EA-BB54-C36CB6643911}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.389","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26309,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100600002","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1405,21.6109]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":389,"OGC_FID":389,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001006","districtbaladi":"10007831","duration":null,"elevation":null,"globalid":"{6B50C113-FE38-4979-943E-D2EC8B5CBB74}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.390","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26310,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100600003","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1351,21.6096]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":390,"OGC_FID":390,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001006","districtbaladi":"10007831","duration":null,"elevation":null,"globalid":"{E9DB8D00-877B-423E-88BF-BC56B025E7DA}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.391","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26311,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100600004","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1363,21.6099]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":391,"OGC_FID":391,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001006","districtbaladi":"10007831","duration":null,"elevation":null,"globalid":"{5A521491-C5AB-4AD9-BBC5-11843AD61339}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.392","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26312,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100600005","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1372,21.6101]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":392,"OGC_FID":392,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001006","districtbaladi":"10007831","duration":null,"elevation":null,"globalid":"{A6EB86A3-0B7F-446B-8CBD-D7E39D1B7F0E}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.393","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26313,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100600006","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1381,21.6103]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":393,"OGC_FID":393,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001006","districtbaladi":"10007831","duration":null,"elevation":null,"globalid":"{A35D265F-2110-43AE-9761-8F0A80A7836B}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.394","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26314,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100600007","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.139,21.6105]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":394,"OGC_FID":394,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001006","districtbaladi":"10007831","duration":null,"elevation":null,"globalid":"{6FB3B71B-B9A8-4BD8-96CE-F3A733B51418}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.395","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26315,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100600008","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1409,21.6109]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":395,"OGC_FID":395,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Civil Work Company Ltd. (CWC)","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1483045200000,"dateofendcontract":1483045200000,"dateofstart":1388350800000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001006","districtbaladi":"10007831","duration":null,"elevation":7.093,"globalid":"{3F29BB6B-EC64-4A08-A53A-0815E574F068}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.396","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26316,"projectbudget":null,"projectcentroid_id":"S3_13011","projectcentroid_unified_id":"00200100600009","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1406,21.6121]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":396,"OGC_FID":396,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{E09311DE-DC01-4DBE-B78E-5242154986C3}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.397","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26317,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900001","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1696,21.583]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":397,"OGC_FID":397,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{F8EED904-4A81-489C-B7D4-A5C3BE7DDA97}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.398","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26318,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900002","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1707,21.5868]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":398,"OGC_FID":398,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{00448D61-F61A-48E1-A340-A00221281266}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.399","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26319,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900003","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1712,21.585]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":399,"OGC_FID":399,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{F1DF7E78-A370-490C-89AC-5EC679E98384}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.400","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26320,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900004","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1601,21.5973]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":400,"OGC_FID":400,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{53DEB7FF-CD12-4C7A-B3A4-6ED04A855A8E}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.401","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26321,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900005","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.166,21.5908]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":401,"OGC_FID":401,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{34CB3F9C-441A-4EEB-B3CC-C3956072E34A}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.402","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26322,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900006","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1613,21.5939]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":402,"OGC_FID":402,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{9CBAF64B-8D93-4F29-9964-ECD03C3F0DCD}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.403","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26323,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900007","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1741,21.5922]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":403,"OGC_FID":403,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{768DB887-C314-430A-A79A-E75A23C4AC4E}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.404","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26324,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900008","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.169,21.5917]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":404,"OGC_FID":404,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{C5E98364-2E00-440D-88EF-4EF9AF53E85E}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.405","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26325,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900009","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1679,21.585]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":405,"OGC_FID":405,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{DF8640A0-A939-43BD-BC32-8CC4FE7E2059}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.406","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26326,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900010","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1728,21.5854]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":406,"OGC_FID":406,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{1CEEC702-E66C-46B9-9D50-7417F80CB8EA}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.407","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26327,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900011","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1601,21.612]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":407,"OGC_FID":407,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{74E959B3-D278-4E20-8140-2FA85F5FD087}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.408","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26328,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900012","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1648,21.5832]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":408,"OGC_FID":408,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{C948CF2F-DE52-4B60-B535-B5A648920A7C}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.409","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26329,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900013","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.157,21.6075]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":409,"OGC_FID":409,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{6B24329F-7549-4CDE-9A88-9086456E4A10}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.410","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26330,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900014","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1686,21.5895]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":410,"OGC_FID":410,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{4D231722-680A-4777-B0A9-7CABCEF6B496}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.411","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26331,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900015","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1694,21.5854]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":411,"OGC_FID":411,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{131E056B-76A4-4B9C-8EB6-6FE06F2F8A1A}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.412","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26332,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900016","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.173,21.5864]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":412,"OGC_FID":412,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{1AF5C83E-3CCF-4CA7-AD6C-4A01BB7A55D9}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.413","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26333,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900017","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1637,21.5863]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":413,"OGC_FID":413,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{99D25B92-5F4D-4AE3-8EE4-E903057774D7}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.414","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26334,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900018","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1649,21.6076]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":414,"OGC_FID":414,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{FF6DA693-CF77-4DEC-B77A-1B87F7488755}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.415","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26335,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900019","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1662,21.5898]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":415,"OGC_FID":415,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{119C9DC8-862C-4696-96AB-9721CFE0A8CA}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.416","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26336,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900020","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1698,21.5825]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":416,"OGC_FID":416,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{71275630-A7BD-4F9B-A7D6-187A0A1D4433}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.417","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26337,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900021","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1736,21.5857]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":417,"OGC_FID":417,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{02A09470-1044-4256-A7EA-5FEA2640F975}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.418","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26338,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900022","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1635,21.587]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":418,"OGC_FID":418,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{64CE0876-A924-4D0E-BEED-8A335894D085}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.419","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26339,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900023","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1679,21.6073]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":419,"OGC_FID":419,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{C9A73D9B-925D-4BF8-B1B0-0D407061845A}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.420","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26340,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900024","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.17,21.5923]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":420,"OGC_FID":420,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{B96E1BA8-0707-4736-82EE-A31A00B631D6}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.421","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26341,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900025","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1604,21.5963]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":421,"OGC_FID":421,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{07BB7491-842F-4FE7-B4AB-8B5454E5F1D3}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.422","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26342,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900026","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1699,21.5892]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":422,"OGC_FID":422,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{D697E4D9-31CF-4518-A10E-4BCB88364F4B}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.423","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26343,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900027","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1671,21.6064]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":423,"OGC_FID":423,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{87E63A51-3EE0-4B37-BAB5-49F23BEDB00D}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.424","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26344,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900028","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1689,21.5886]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":424,"OGC_FID":424,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{C9A9E89A-76C6-41A4-AB5D-1A9A2C883F40}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.425","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26345,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900029","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1663,21.6075]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":425,"OGC_FID":425,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{18E978C8-107F-41AC-A354-B39ADBA19C53}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.426","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26346,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900030","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1665,21.6069]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":426,"OGC_FID":426,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{7752D352-BDB9-4AE4-BAAE-AC85D078CC1F}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.427","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26347,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900031","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1695,21.5834]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":427,"OGC_FID":427,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{2F1DC6CA-CDC0-4FEB-A2C0-1BD8A0836A24}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.428","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26348,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900032","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1651,21.6065]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":428,"OGC_FID":428,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{915D8E7A-019B-4187-9703-907E3601FF84}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.429","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26349,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900033","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1637,21.5987]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":429,"OGC_FID":429,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{C8BB7C55-70AF-4733-8F9F-15BEE6CD98C8}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.430","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26350,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900034","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1656,21.6078]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":430,"OGC_FID":430,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{91F312C3-DE50-40FE-813B-3CD4F0B266F4}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.431","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26351,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900035","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1704,21.5857]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":431,"OGC_FID":431,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{145E194C-6A02-4CCC-84F5-F4193962FC0E}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.432","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26352,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900036","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1708,21.5912]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":432,"OGC_FID":432,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{85F5F802-DD6B-4A55-BC33-9EA0582B29EA}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.433","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26353,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900037","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1567,21.6088]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":433,"OGC_FID":433,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{1C566BCF-B799-41F6-BB87-9B5EE88E1E59}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.434","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26354,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900038","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1615,21.5932]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":434,"OGC_FID":434,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{688EC5E2-A08F-48A8-B15E-04BE125208C7}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.435","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26355,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900039","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1661,21.6081]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":435,"OGC_FID":435,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{26281561-F1DC-49C6-AFD9-868CB37C61A4}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.436","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26356,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900040","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1621,21.5911]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":436,"OGC_FID":436,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{9FB097D8-6B28-482F-86E9-06974EFA70DB}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.437","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26357,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900041","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1681,21.5945]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":437,"OGC_FID":437,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{23FBD61E-1BC8-479A-9706-2C1B87C365BE}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.438","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26358,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900042","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1747,21.5849]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":438,"OGC_FID":438,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{B82B13D2-9B28-4829-821C-EEA0360318A7}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.439","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26359,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900043","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1635,21.5948]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":439,"OGC_FID":439,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{997B254A-9C85-4631-803F-2BFDF1F9B43C}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.440","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26360,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900044","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1622,21.5929]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":440,"OGC_FID":440,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{2D3BD735-2C63-4C5A-9DF4-1B26AF75E725}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.441","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26361,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900045","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1649,21.5905]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":441,"OGC_FID":441,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{6AB34870-1BFD-49D5-887F-3AC917B4DEFB}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.442","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26362,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900046","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1735,21.592]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":442,"OGC_FID":442,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{B0F938A0-9196-43A3-9BBD-CCE4F23AE1A5}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.443","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26363,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900047","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1603,21.5991]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":443,"OGC_FID":443,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{AF1EBAB0-8A54-456C-B111-6150E88D2702}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.444","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26364,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900048","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1664,21.5995]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":444,"OGC_FID":444,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{63A8EDD1-599A-4E13-B277-DD1E39D5D0AB}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.445","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26365,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900049","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1621,21.6064]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":445,"OGC_FID":445,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{ED9045D7-69F3-4F39-8D44-6DEE45FE53CF}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.446","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26366,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900050","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1716,21.5915]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":446,"OGC_FID":446,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{E847A71B-D436-456C-B683-CB7FFE77B6AF}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.447","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26367,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900051","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1567,21.6091]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":447,"OGC_FID":447,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{15B709A5-8069-40F9-9B62-F88802939963}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.448","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26368,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900052","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1647,21.6085]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":448,"OGC_FID":448,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{0A05B1F5-8B87-432D-A7E6-A3EE8DA8522A}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.449","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26369,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900053","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.163,21.608]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":449,"OGC_FID":449,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{049FDA5B-DEDC-4213-93D1-07DC293ED04A}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.450","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26370,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900054","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1569,21.6079]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":450,"OGC_FID":450,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{01F52AF3-B232-44D8-9D8A-86AE1F4D3065}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.451","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26371,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900055","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1652,21.582]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":451,"OGC_FID":451,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{99FD783F-DC75-437F-A9E0-5BC2D38F66FF}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.452","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26372,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900056","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1693,21.5908]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":452,"OGC_FID":452,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{BCC288D6-0589-47A3-83C1-4EB35DC54D17}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.453","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26373,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900057","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1662,21.5845]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":453,"OGC_FID":453,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{BE18D709-B306-4A4A-9924-A94522CA3159}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.454","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26374,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900058","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1651,21.5842]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":454,"OGC_FID":454,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{6E5B84C9-E57B-4347-BFAF-B459730F88FE}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.455","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26375,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900059","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1569,21.6112]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":455,"OGC_FID":455,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{8B37BE9E-08EC-44E8-B5DC-DA08EC2783BD}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.456","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26376,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900060","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1699,21.5856]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":456,"OGC_FID":456,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{E2F7F914-D939-494E-8A45-FE1C6EFEEE61}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.457","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26377,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900061","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1562,21.6113]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":457,"OGC_FID":457,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{8481D382-E678-49DC-84F2-B5479A673B53}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.458","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26378,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900062","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1683,21.598]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":458,"OGC_FID":458,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{5A26989A-D228-46DE-B957-2FD0CA5BEC6E}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.459","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26379,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900063","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1668,21.5847]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":459,"OGC_FID":459,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{D4D13DAC-D6CB-4CDB-8D90-36B7C4EE8757}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.460","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26380,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900064","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.164,21.5854]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":460,"OGC_FID":460,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{4C057EAD-C5CC-4D4A-BAD8-827B9BDBBDA6}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.461","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26381,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900065","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1597,21.5987]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":461,"OGC_FID":461,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{7B459E41-DE02-4111-BD0E-BD1E2EA30C1C}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.462","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26382,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900066","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1687,21.5842]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":462,"OGC_FID":462,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{498B1825-F8C1-4CB0-AB4F-4627CA61F0A4}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.463","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26383,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900067","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1611,21.6123]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":463,"OGC_FID":463,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{EAF37DD3-D053-4671-B60F-12DA496C566A}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.464","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26384,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900068","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1667,21.5889]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":464,"OGC_FID":464,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{A854D969-3A38-4996-A489-CA685D1D6295}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.465","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26385,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900069","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1715,21.5892]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":465,"OGC_FID":465,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{A37FB8F3-4DA1-4076-8C31-A2D698422D30}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.466","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26386,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900070","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1639,21.5935]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":466,"OGC_FID":466,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{71514ED1-E748-4F95-86ED-01B25714CE39}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.467","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26387,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900071","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1567,21.6093]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":467,"OGC_FID":467,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{13BF9FD8-7AB1-4E9E-BDB6-56C864714B79}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.468","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26388,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900072","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1616,21.5927]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":468,"OGC_FID":468,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{3C652FAC-3ECD-44AF-B680-4C3C3B40F5C6}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.469","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26389,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900073","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1654,21.5812]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":469,"OGC_FID":469,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{EADE28F0-8414-47E3-A9AB-B68BD1F92217}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.470","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26390,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900074","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1695,21.5834]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":470,"OGC_FID":470,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{321F7F71-2722-4A2B-8217-DA8E606A1376}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.471","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26391,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900075","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.169,21.5854]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":471,"OGC_FID":471,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{7446CD13-E240-41A9-A12B-564BD22E7EBF}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.472","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26392,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900076","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1619,21.5917]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":472,"OGC_FID":472,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{62568F22-BC35-4D2D-A96F-AF5767CCAD4C}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.473","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26393,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900077","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1682,21.584]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":473,"OGC_FID":473,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{E3D4F10F-EF4D-4F42-B972-9A08185FBB6A}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.474","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26394,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900078","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1637,21.5941]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":474,"OGC_FID":474,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{11E035CF-F152-4E82-9FFF-977E7A36FE91}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.475","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26395,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900079","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1684,21.5851]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":475,"OGC_FID":475,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{EC3C9350-326C-48B2-8461-7B17FEC26EC2}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.476","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26396,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900080","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1704,21.5893]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":476,"OGC_FID":476,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{380F5590-9BAB-491F-9386-E9F69CBC9321}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.477","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26397,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900081","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1592,21.6002]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":477,"OGC_FID":477,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{DEB3FC9D-DF2B-463C-8023-A2BB897F4D9B}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.478","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26398,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900082","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1689,21.5853]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":478,"OGC_FID":478,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{AC445E15-362A-4494-9B8A-718B6BF05D7A}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.479","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26399,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900083","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1712,21.5902]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":479,"OGC_FID":479,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{A400A77B-790D-4092-92F0-FF62E7D59BAD}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.480","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26400,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900084","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1569,21.6118]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":480,"OGC_FID":480,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{A1B9A607-7DAB-4E6D-AABA-2932BC3C06B3}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.481","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26401,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900085","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1639,21.5859]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":481,"OGC_FID":481,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{2606B3D8-D9E1-4FC7-B8DB-F04A03516A6A}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.482","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26402,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900086","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1569,21.6082]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":482,"OGC_FID":482,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{90EC298F-2B62-431C-B90D-A8EAFA61829B}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.483","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26403,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900087","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1629,21.5909]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":483,"OGC_FID":483,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{5CD3E8B7-5151-497F-9F50-6CCB59D1548D}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.484","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26404,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900088","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1623,21.5984]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":484,"OGC_FID":484,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{33016BE1-D83C-4BD8-BFA7-CD11A218176F}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.485","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26405,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900089","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1709,21.5843]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":485,"OGC_FID":485,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{54588088-AA43-4F83-A326-E5D5C24D514D}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.486","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26406,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900090","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1687,21.5926]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":486,"OGC_FID":486,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{EF0CBC63-F27D-476D-A78B-DC749239B015}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.487","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26407,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900091","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.166,21.5941]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":487,"OGC_FID":487,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{B4F3C9D4-09BB-4E79-A4C4-3B859CB86A32}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.488","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26408,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900092","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1674,21.5968]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":488,"OGC_FID":488,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{4A5929ED-1288-4B84-9597-B403C33C2D8A}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.489","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26409,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900093","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.166,21.6067]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":489,"OGC_FID":489,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{3AF1B0AB-6756-465F-AD7B-A42BFF698C00}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.490","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26410,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900094","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1674,21.5966]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":490,"OGC_FID":490,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{115D7B84-2C4E-423B-9918-14808F1AEB98}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.491","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26411,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900095","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1628,21.6085]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":491,"OGC_FID":491,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{C8F51AB9-F470-4693-A686-81719C5189F3}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.492","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26412,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900096","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1691,21.6003]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":492,"OGC_FID":492,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{1AF7BDDC-20DB-4BFB-95E4-829CE67F247A}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.493","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26413,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900097","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.159,21.6008]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":493,"OGC_FID":493,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{C1B215C0-8D01-4627-B25E-006A9CD46D02}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.494","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26414,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900098","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1688,21.5928]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":494,"OGC_FID":494,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{B21FE558-E129-49CF-B909-60826482A854}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.495","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26415,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900099","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1646,21.6116]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":495,"OGC_FID":495,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{DFD61876-397F-4988-9385-FCCE3125AD77}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.496","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26416,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900100","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1578,21.6044]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":496,"OGC_FID":496,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{317FA33C-A02E-4192-BBCE-173B6B460F7B}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.497","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26417,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900101","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1607,21.5979]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":497,"OGC_FID":497,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{10E0C8F6-CDB2-4A5B-9824-422E4E2F25A4}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.498","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26418,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900102","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1727,21.5874]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":498,"OGC_FID":498,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{25B47F4D-93C2-42F3-B190-F29081E08153}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.499","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26419,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900103","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1656,21.5918]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":499,"OGC_FID":499,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{1F37E687-F867-454D-92E6-1FD94C5EDF38}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.500","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26420,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900104","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.165,21.5938]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":500,"OGC_FID":500,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{83620023-4332-4354-B389-6CA2A44D4E55}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.501","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26421,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900105","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1668,21.5846]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":501,"OGC_FID":501,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"SAFA GENERAL CONTRACTOR","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1369861200000,"dateofendcontract":1328302800000,"dateofstart":1318194000000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{98BCB059-833F-4662-A7CF-708EC8FEBEB8}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.502","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26422,"projectbudget":null,"projectcentroid_id":"B4-10392","projectcentroid_unified_id":"00200100900106","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":1,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1699,21.5824]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":502,"OGC_FID":502,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{4921431A-DAEA-49D6-B31B-74AE636A7DEA}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.503","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26423,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900107","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1567,21.612]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":503,"OGC_FID":503,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{FB6560A4-537B-4BB0-82B6-FFFEB1E26C4D}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.504","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26424,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900108","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1667,21.5996]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":504,"OGC_FID":504,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{7EFF01CA-1345-4D9B-8978-AB6399543FB8}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.505","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26425,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900109","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1634,21.5911]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":505,"OGC_FID":505,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{42473386-D97F-4357-BAF0-EC73E8784DAC}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.506","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26426,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900110","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.169,21.5977]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":506,"OGC_FID":506,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{E86EE494-E79A-4BD5-A1D0-BF1BFF76BB59}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.507","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26427,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900111","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1692,21.5929]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":507,"OGC_FID":507,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{CB0EF1E9-D735-47F2-A085-A60C77959A6C}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.508","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26428,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900112","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1744,21.5859]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":508,"OGC_FID":508,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"SAFA GENERAL CONTRACTOR","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1369861200000,"dateofendcontract":1328302800000,"dateofstart":1318194000000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{8F190878-3F59-4B30-B5FF-C20835F7EC8A}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.509","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26429,"projectbudget":null,"projectcentroid_id":"B4-10392","projectcentroid_unified_id":"00200100900113","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":1,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1695,21.5834]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":509,"OGC_FID":509,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{F8CC4D56-9892-413A-B83F-EA1427677621}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.510","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26430,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900114","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1688,21.5982]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":510,"OGC_FID":510,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"SAFA GENERAL CONTRACTOR","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1369861200000,"dateofendcontract":1328302800000,"dateofstart":1318194000000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{81D13CEB-6DFA-47D7-B300-A2003E093ED3}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.511","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26431,"projectbudget":null,"projectcentroid_id":"B4-10392","projectcentroid_unified_id":"00200100900115","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":1,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1692,21.5843]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":511,"OGC_FID":511,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{AAF0D121-A71E-4033-A7C3-73279C621021}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.512","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26432,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900116","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1652,21.5896]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":512,"OGC_FID":512,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{46E67355-1E6B-4CC4-B680-D578DD69AFE9}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.513","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26433,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900117","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1627,21.5892]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":513,"OGC_FID":513,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{1DB374FA-0EFD-4135-8308-E838071DEAF6}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.514","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26434,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900118","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1596,21.599]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":514,"OGC_FID":514,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"SAFA GENERAL CONTRACTOR","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1369861200000,"dateofendcontract":1328302800000,"dateofstart":1318194000000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{922E1463-E2AB-4B27-A97A-71396724955A}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.515","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26435,"projectbudget":null,"projectcentroid_id":"B4-10392","projectcentroid_unified_id":"00200100900119","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":1,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1689,21.5852]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":515,"OGC_FID":515,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{B997EF50-71CC-4F13-8D7E-CE624BBA62EB}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.516","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26436,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900120","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1632,21.59]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":516,"OGC_FID":516,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{CB185D88-4027-4E20-8039-7E7529C96F87}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.517","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26437,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900121","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1629,21.5887]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":517,"OGC_FID":517,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{F9960DCA-C26B-4BB4-9A6D-E29DD7DF1B52}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.518","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26438,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900122","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1603,21.5968]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":518,"OGC_FID":518,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{FA1F8137-BEBA-4C63-AA4B-01328FE8C88D}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.519","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26439,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900123","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.167,21.5978]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":519,"OGC_FID":519,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{A0A0A70A-69F6-4233-BCDC-1A7FC85A5432}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.520","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26440,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900124","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1643,21.6096]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":520,"OGC_FID":520,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{E774D7B9-89AA-42E7-9A1B-C1096B336CB1}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.521","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26441,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900125","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1645,21.584]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":521,"OGC_FID":521,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{811EFC75-AB8A-4ECD-9F22-232D9B10F307}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.522","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26442,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900126","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1629,21.5967]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":522,"OGC_FID":522,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{7D274974-1FBD-4E81-B5FD-3FE729A71C2D}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.523","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26443,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900127","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1671,21.589]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":523,"OGC_FID":523,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{C59747E3-0863-47DC-87A3-7714DA63F972}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.524","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26444,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900128","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1652,21.6059]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":524,"OGC_FID":524,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"SAFA GENERAL CONTRACTOR","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1369861200000,"dateofendcontract":1328302800000,"dateofstart":1318194000000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{67F4B773-1012-4B15-9EDC-0F7DCBAF9789}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.525","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26445,"projectbudget":null,"projectcentroid_id":"B4-10392","projectcentroid_unified_id":"00200100900129","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":1,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1684,21.5851]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":525,"OGC_FID":525,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{0FE26384-93FB-4238-ADBF-2592C70A0F54}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.526","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26446,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900130","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1651,21.5841]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":526,"OGC_FID":526,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"SAFA GENERAL CONTRACTOR","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1369861200000,"dateofendcontract":1328302800000,"dateofstart":1318194000000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{9036302B-16F3-453D-B8F6-8E961EA3ECA4}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.527","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26447,"projectbudget":null,"projectcentroid_id":"B4-10392","projectcentroid_unified_id":"00200100900131","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":1,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1679,21.5849]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":527,"OGC_FID":527,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{A8676DC7-0D1C-4CF3-82F8-A19A15EA1601}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.528","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26448,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900132","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.162,21.6114]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":528,"OGC_FID":528,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{D96368F2-7938-4945-81A4-588DA8624827}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.529","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26449,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900133","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1564,21.6102]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":529,"OGC_FID":529,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"SAFA GENERAL CONTRACTOR","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1369861200000,"dateofendcontract":1328302800000,"dateofstart":1318194000000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{30813961-39E8-4106-BD8F-9FBA1AEEE554}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.530","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26450,"projectbudget":null,"projectcentroid_id":"B4-10392","projectcentroid_unified_id":"00200100900134","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":1,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1669,21.5846]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":530,"OGC_FID":530,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{9196B2BA-51E9-452F-AB14-9551CC75567A}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.531","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26451,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900135","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1636,21.6082]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":531,"OGC_FID":531,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{6BEB3E00-3EC5-4599-B215-440FB829DDA8}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.532","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26452,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900136","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1684,21.5976]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":532,"OGC_FID":532,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{6B38FCF3-9936-42A3-81D6-C4FF1E6DA42A}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.533","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26453,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900137","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1684,21.5851]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":533,"OGC_FID":533,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{B699CC45-62BE-4DB0-9333-71F47B260F9A}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.534","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26454,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900138","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1657,21.5843]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":534,"OGC_FID":534,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{AA612992-13E3-4C85-890C-319339729408}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.535","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26455,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900139","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1631,21.5882]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":535,"OGC_FID":535,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{8287DAFA-4CAB-4C81-80E2-ECFAB7B194F1}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.536","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26456,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900140","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.161,21.5948]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":536,"OGC_FID":536,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"SAFA GENERAL CONTRACTOR","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1369861200000,"dateofendcontract":1328302800000,"dateofstart":1318194000000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{F1D5F1DD-511C-450B-B6EC-1E104E0AAE74}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.537","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26457,"projectbudget":null,"projectcentroid_id":"B4-10392","projectcentroid_unified_id":"00200100900141","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":1,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1657,21.5843]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":537,"OGC_FID":537,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{EBCF2913-7EC5-46D0-AE5E-30E5C9130C1F}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.538","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26458,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900142","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1687,21.5926]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":538,"OGC_FID":538,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{1E645218-FA80-4BE1-818D-8C8FB1CF8EDC}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.539","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26459,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900143","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1608,21.5952]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":539,"OGC_FID":539,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{72009C82-1817-400E-BE99-94531450D68D}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.540","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26460,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900144","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1581,21.6035]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":540,"OGC_FID":540,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{8B63867D-D424-4101-8262-562739CF2269}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.541","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26461,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900145","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1718,21.5833]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":541,"OGC_FID":541,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"SAFA GENERAL CONTRACTOR","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1369861200000,"dateofendcontract":1328302800000,"dateofstart":1318194000000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{A80B7A38-AC4F-400F-BF41-76D9C62DC92E}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.542","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26462,"projectbudget":null,"projectcentroid_id":"B4-10392","projectcentroid_unified_id":"00200100900146","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":1,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1651,21.5841]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":542,"OGC_FID":542,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{AFD11FC4-EF59-4296-999B-FF9AC8427950}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.543","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26463,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900147","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.167,21.5911]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":543,"OGC_FID":543,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{D79050A9-B99D-4AE5-99F4-1A4055309D6D}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.544","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26464,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900148","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1641,21.5851]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":544,"OGC_FID":544,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{63482A54-B576-49A3-AFF4-BDBA5A807AD2}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.545","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26465,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900149","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.158,21.6114]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":545,"OGC_FID":545,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{56F25DEB-1F3D-46DC-954A-39C93881975F}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.546","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26466,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900150","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1568,21.6084]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":546,"OGC_FID":546,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{888A85AB-BFE2-4CE6-9863-44E73672E699}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.547","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26467,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900151","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1667,21.5921]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":547,"OGC_FID":547,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{DD441008-2840-4D8F-BEDB-BB4D9A3F5FA3}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.548","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26468,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900152","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1577,21.6116]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":548,"OGC_FID":548,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"SAFA GENERAL CONTRACTOR","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1369861200000,"dateofendcontract":1328302800000,"dateofstart":1318194000000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{1AF35628-0B49-4584-9356-BFF32F388FB1}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.549","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26469,"projectbudget":null,"projectcentroid_id":"B4-10392","projectcentroid_unified_id":"00200100900153","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":1,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1698,21.5825]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":549,"OGC_FID":549,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{D3C01D1C-82A2-48F4-9C4D-7EC3CB7EA845}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.550","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26470,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900154","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1571,21.6073]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":550,"OGC_FID":550,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{F0FCD73D-D222-42DF-BA84-1F2C4DD71E1D}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.551","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26471,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900155","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1632,21.5958]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":551,"OGC_FID":551,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{E4944DAD-5F29-4767-AFBF-6BD04E9D5A18}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.552","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26472,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900156","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.156,21.6119]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":552,"OGC_FID":552,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{94FCBCA3-02E8-4BBD-9225-32D6342C5083}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.553","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26473,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900157","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1627,21.593]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":553,"OGC_FID":553,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{EF0F5EB9-D3D8-4732-8A67-B8472E0C8CC1}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.554","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26474,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900158","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1599,21.5977]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":554,"OGC_FID":554,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{448759E5-C313-4E16-9605-17537E48B231}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.555","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26475,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900159","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1633,21.6093]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":555,"OGC_FID":555,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{8A919DF8-C193-49EC-B1B6-2884858E86D8}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.556","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26476,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900160","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1702,21.5857]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":556,"OGC_FID":556,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{C9BBBF2B-FB35-4912-87BF-6AC96F027406}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.557","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26477,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900161","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.166,21.5855]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":557,"OGC_FID":557,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{BF283233-D2DD-4816-9400-E3E714C10538}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.558","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26478,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900162","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1644,21.5841]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":558,"OGC_FID":558,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{3A75BAA1-321F-491B-8834-D3700427796B}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.559","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26479,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900163","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1607,21.5956]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":559,"OGC_FID":559,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{63AD8AA8-AA52-4717-8B48-3F059E4B0B80}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.560","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26480,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900164","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1726,21.5895]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":560,"OGC_FID":560,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{6AE5482E-4313-478D-BB2D-052359D7D0F7}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.561","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26481,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900165","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1707,21.5901]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":561,"OGC_FID":561,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{E0C60503-E0C1-4637-AAA0-F03AAACD496C}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.562","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26482,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900166","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1732,21.5876]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":562,"OGC_FID":562,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{727C2735-44DC-437A-B8B8-6F22F6DEFA68}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.563","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26483,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900167","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1663,21.5845]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":563,"OGC_FID":563,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{355D9D9C-3CD7-4673-A576-035B9B320E23}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.564","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26484,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900168","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1598,21.5981]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":564,"OGC_FID":564,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{581CF129-9CE7-41CD-9537-61EE759FC31C}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.565","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26485,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900169","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1605,21.5977]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":565,"OGC_FID":565,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{BBB9728F-5FB9-4CE8-A8F8-523258D54325}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.566","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26486,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900170","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1624,21.5903]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":566,"OGC_FID":566,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{480A3DD9-46A1-4086-9290-AE3ADF6EC230}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.567","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26487,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900171","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1674,21.5901]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":567,"OGC_FID":567,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{D7D22B77-B088-4B5A-A693-7B8E504181A9}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.568","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26488,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900172","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1674,21.5882]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":568,"OGC_FID":568,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{6EF70985-B97B-425C-B38D-3252828FE2FE}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.569","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26489,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900173","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1676,21.5859]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":569,"OGC_FID":569,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{EF17B7D5-A363-4696-947B-4EC7465D1A09}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.570","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26490,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900174","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1646,21.5837]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":570,"OGC_FID":570,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{321C2C70-C393-4D03-AAC0-CC172EC628AF}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.571","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26491,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900175","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1617,21.6124]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":571,"OGC_FID":571,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{AFE441BD-C49A-4BDE-B360-13410B4414B5}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.572","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26492,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900176","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.157,21.6077]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":572,"OGC_FID":572,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{FB50BAF0-7736-4DF3-BE24-2104CA0CD7A1}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.573","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26493,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900177","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1627,21.6091]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":573,"OGC_FID":573,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{CC563355-8F9B-42E7-A49E-3143B78D54F7}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.574","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26494,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900178","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1703,21.5878]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":574,"OGC_FID":574,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{5F7FA857-3A70-4560-BC9F-27F6AE515C87}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.575","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26495,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900179","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1642,21.5848]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":575,"OGC_FID":575,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{8F0C196A-4E27-4321-A744-5ECED9D2747C}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.576","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26496,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900180","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1645,21.5839]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":576,"OGC_FID":576,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{6A477553-94AC-481A-9A16-7D5BFA842326}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.577","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26497,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900181","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1605,21.5985]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":577,"OGC_FID":577,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{F41F7D53-453E-417B-8615-977629518025}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.578","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26498,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900182","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1586,21.6019]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":578,"OGC_FID":578,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{FF9F56BB-3746-4D6E-AC6B-BB21008BBE1E}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.579","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26499,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900183","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1633,21.6112]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":579,"OGC_FID":579,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{D60C9095-1EAD-4DBD-8317-6F212DA6EBF2}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.580","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26500,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900184","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1651,21.5991]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":580,"OGC_FID":580,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{CB2C324D-7683-427F-80A7-119FB11CF057}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.581","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26501,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900185","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1583,21.6029]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":581,"OGC_FID":581,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{F88BE1DA-DAF2-4772-81A6-96F4522CDA87}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.582","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26502,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900186","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1698,21.5898]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":582,"OGC_FID":582,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{069F6686-4C93-4C4B-B243-F5789D104809}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.583","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26503,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900187","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1636,21.61]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":583,"OGC_FID":583,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{95A012D1-49C9-481D-AEE0-D0ECB66598BF}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.584","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26504,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900188","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1681,21.5914]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":584,"OGC_FID":584,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{CCB7A7D7-013F-41E5-B9F0-5D54C304D154}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.585","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26505,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900189","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1598,21.6005]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":585,"OGC_FID":585,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{320DFF0F-11AF-4F31-8C41-5ACD4CA56DFA}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.586","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26506,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900190","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1646,21.5914]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":586,"OGC_FID":586,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{371C5761-7470-4EE2-B767-482C49876CBA}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.587","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26507,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900191","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.168,21.6067]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":587,"OGC_FID":587,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{0648C560-5074-41D6-A347-50B4A843D5CB}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.588","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26508,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900192","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.171,21.586]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":588,"OGC_FID":588,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{E273C341-E651-4CA1-B4C4-C1ADF07D2B80}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.589","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26509,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900193","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1563,21.6106]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":589,"OGC_FID":589,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{DA598124-FA73-494B-8AC4-0C8083B96B3E}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.590","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26510,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900194","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1663,21.6055]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":590,"OGC_FID":590,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{478C698B-BC56-457A-A5C7-38CB28C59C71}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.591","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26511,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900195","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1631,21.6077]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":591,"OGC_FID":591,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{7C51F0AA-1AA9-45ED-92D9-0C9CC37C728D}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.592","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26512,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900196","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1694,21.5907]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":592,"OGC_FID":592,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{AD20B3CB-0DF4-47DF-8C99-991752ACAF16}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.593","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26513,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900197","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1673,21.5945]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":593,"OGC_FID":593,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{EAE5BE0E-8F79-43E9-9771-CEB178C593C8}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.594","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26514,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900198","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1588,21.6014]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":594,"OGC_FID":594,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{5F51C477-08A9-44F8-A4F6-02F35844E4DD}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.595","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26515,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900199","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1691,21.5864]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":595,"OGC_FID":595,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{F58FFC74-F548-456E-B300-6B0A903AE3C2}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.596","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26516,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900200","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.165,21.5826]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":596,"OGC_FID":596,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{70E517B9-0191-4CBE-88CA-18844AB8AF3A}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.597","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26517,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900201","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1698,21.593]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":597,"OGC_FID":597,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{D72B0F18-7F3E-45BC-BF5F-AC4F6AB36564}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.598","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26518,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900202","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1571,21.6071]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":598,"OGC_FID":598,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{D3A5DB7B-5214-43DF-85FA-2126396EF431}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.599","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26519,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900203","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1702,21.591]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":599,"OGC_FID":599,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{B596DC24-4811-426C-84C1-2B91C5F61098}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.600","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26520,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900204","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1679,21.5974]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":600,"OGC_FID":600,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{9F030982-E58E-4E6D-A103-55234324C633}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.601","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26521,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900205","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1622,21.6107]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":601,"OGC_FID":601,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{BFD4129F-8D85-4BF3-AB9F-7A8F766F765D}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.602","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26522,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900206","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1696,21.5866]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":602,"OGC_FID":602,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{494EACAF-5BAA-4B44-B0EB-8C50BB36B118}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.603","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26523,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900207","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1705,21.5874]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":603,"OGC_FID":603,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{3D6741E6-ED51-4088-86BA-DA25542A5273}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.604","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26524,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900208","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.168,21.5947]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":604,"OGC_FID":604,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{9EAFE522-91C4-4782-A45D-F0FCFF21D842}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.605","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26525,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900209","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1568,21.6084]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":605,"OGC_FID":605,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{5C030DF6-A982-4941-9C39-5D1B861BCAAE}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.606","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26526,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900210","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.156,21.6123]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":606,"OGC_FID":606,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{424E93D0-3544-42D8-ADB6-31A62A2313D4}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.607","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26527,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900211","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1683,21.5929]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":607,"OGC_FID":607,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{A964EA42-39E6-45E5-894F-DD23C6B49FA8}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.608","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26528,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900212","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1729,21.5886]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":608,"OGC_FID":608,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{253DCC72-3105-4F87-AC60-FD76C4D3A309}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.609","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26529,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900213","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1695,21.592]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":609,"OGC_FID":609,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{22C437E8-FDC2-49C1-82F6-0599BE1B218F}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.610","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26530,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900214","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1634,21.6107]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":610,"OGC_FID":610,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{1CC154FA-C238-4EA8-8476-1B09A2332B83}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.611","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26531,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900215","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1644,21.5989]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":611,"OGC_FID":611,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{74B20DAD-10D2-43B9-B58E-F44BA4BE8923}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.612","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26532,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900216","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1683,21.5904]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":612,"OGC_FID":612,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{26C02BEC-50B4-45F0-AE1E-571F3323AD26}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.613","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26533,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900217","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1681,21.597]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":613,"OGC_FID":613,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{FCACC09A-ED84-4BEE-8AD4-A2EB0E550057}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.614","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26534,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900218","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1611,21.5943]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":614,"OGC_FID":614,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{681A9496-6D8F-45F4-ADA9-517E1A1DEFE0}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.615","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26535,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900219","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1626,21.5898]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":615,"OGC_FID":615,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"SAFA GENERAL CONTRACTOR","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1369861200000,"dateofendcontract":1328302800000,"dateofstart":1318194000000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{1688193F-6C55-452A-92DF-D2C9CECD6EB3}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.616","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26536,"projectbudget":null,"projectcentroid_id":"B4-10392","projectcentroid_unified_id":"00200100900220","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":1,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1652,21.582]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":616,"OGC_FID":616,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"SAFA GENERAL CONTRACTOR","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1369861200000,"dateofendcontract":1328302800000,"dateofstart":1318194000000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{5297AF96-FAB9-4FCA-BF28-43B71AA6068B}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.617","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26537,"projectbudget":null,"projectcentroid_id":"B4-10392","projectcentroid_unified_id":"00200100900221","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":1,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.165,21.5826]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":617,"OGC_FID":617,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"SAFA GENERAL CONTRACTOR","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1369861200000,"dateofendcontract":1328302800000,"dateofstart":1318194000000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{00C0F783-33C6-43AC-9403-C6AD1AE63430}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.618","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26538,"projectbudget":null,"projectcentroid_id":"B4-10392","projectcentroid_unified_id":"00200100900222","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":1,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1647,21.5836]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":618,"OGC_FID":618,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"SAFA GENERAL CONTRACTOR","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1369861200000,"dateofendcontract":1328302800000,"dateofstart":1318194000000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{9B27BABD-DE0B-4DD3-9CE9-D80134CCA56A}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.619","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26539,"projectbudget":null,"projectcentroid_id":"B4-10392","projectcentroid_unified_id":"00200100900223","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":1,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1645,21.584]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":619,"OGC_FID":619,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{1582FE81-580D-4A6F-9D61-404507F03481}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.620","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26540,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900224","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1668,21.5899]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":620,"OGC_FID":620,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{E52A0B3B-47AF-4108-8DD3-50E1E22617FD}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.621","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26541,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900225","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1644,21.5843]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":621,"OGC_FID":621,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"SAFA GENERAL CONTRACTOR","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1369861200000,"dateofendcontract":1328302800000,"dateofstart":1318194000000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{3B0EB7AA-8429-4BB8-A204-9C9AABA67B0D}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.622","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26542,"projectbudget":null,"projectcentroid_id":"B4-10392","projectcentroid_unified_id":"00200100900226","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":1,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1654,21.5812]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":622,"OGC_FID":622,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{B3C19CA6-FE35-410B-8660-2B72282C2233}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.623","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26543,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900227","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1726,21.5917]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":623,"OGC_FID":623,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{31B2B86C-15F9-4425-B200-83F0507BAFCA}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.624","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26544,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900228","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1633,21.5985]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":624,"OGC_FID":624,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{58D57096-7527-4179-AB5B-5C190084B9D8}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.625","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26545,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900229","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1633,21.5874]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":625,"OGC_FID":625,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"SAFA GENERAL CONTRACTOR","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1369861200000,"dateofendcontract":1328302800000,"dateofstart":1318194000000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{26069523-2E2D-49FF-A205-8CD759A3562E}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.626","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26546,"projectbudget":null,"projectcentroid_id":"B4-10392","projectcentroid_unified_id":"00200100900230","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":1,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1663,21.5845]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":626,"OGC_FID":626,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{4A2C9BE1-8ECF-4AC7-831A-839F443C2612}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.627","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26547,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900231","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.16,21.5975]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":627,"OGC_FID":627,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{47A6C7B1-91F6-47A3-A64D-F1B3E4BC9731}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.628","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26548,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900232","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1671,21.5997]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":628,"OGC_FID":628,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{9BC915F4-A869-40E0-A784-1490945ACE4D}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.629","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26549,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900233","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1724,21.5853]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":629,"OGC_FID":629,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{FC94A538-B429-45A0-A4B2-CFBE9395EA47}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.630","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26550,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900234","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1623,21.5984]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":630,"OGC_FID":630,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{A6F19E63-26C1-4547-900E-9772B0F31142}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.631","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26551,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900235","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1592,21.6003]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":631,"OGC_FID":631,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{8089FCE5-90DF-46F7-A899-5CA4B538EC73}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.632","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26552,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900236","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1594,21.5995]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":632,"OGC_FID":632,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{ED418F6E-D366-4DE9-B35A-EBE27A17B441}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.633","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26553,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900237","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1748,21.5844]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":633,"OGC_FID":633,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{6D040C13-B8E1-41B6-8482-E51D0F094808}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.634","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26554,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900238","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1625,21.5977]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":634,"OGC_FID":634,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{5A90D5F6-2FC6-4733-974A-7DD9D30EAEF4}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.635","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26555,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900239","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1665,21.605]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":635,"OGC_FID":635,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{44FA4A5A-23E1-4C50-9C72-63117434BF38}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.636","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26556,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900240","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1631,21.6099]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":636,"OGC_FID":636,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{10029273-39AF-4FE9-A102-6C8B304FC1E9}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.637","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26557,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900241","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1604,21.606]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":637,"OGC_FID":637,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{8E245783-52C4-4D0B-AF69-7BB93529A4FE}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.638","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26558,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900242","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1684,21.5938]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":638,"OGC_FID":638,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{FDD72C78-B276-4C47-8F50-49E4B319D4EB}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.639","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26559,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900243","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1566,21.6097]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":639,"OGC_FID":639,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{0884C345-6BCE-4FFE-A4A4-E9CD4B44743F}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.640","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26560,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900244","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1677,21.5924]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":640,"OGC_FID":640,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{3EB78908-DBE7-487B-AE85-0542B4FB8BE5}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.641","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26561,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900245","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1715,21.5841]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":641,"OGC_FID":641,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{76DE26E9-7646-4C80-98D1-2DAFEE4EE524}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.642","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26562,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900246","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.16,21.5998]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":642,"OGC_FID":642,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{966C28F0-C302-42A0-B25D-4DB43D4F0CCC}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.643","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26563,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900247","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1558,21.6134]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":643,"OGC_FID":643,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{67359210-8F1F-4262-A1C0-E17EFFBBEEFF}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.644","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26564,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900248","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1625,21.6098]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":644,"OGC_FID":644,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{9982A394-73A5-4D47-A148-7EDE705D7912}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.645","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26565,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900249","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1725,21.5863]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":645,"OGC_FID":645,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{9182315E-413B-4054-B678-47AB2CDC10AD}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.646","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26566,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900250","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1631,21.5921]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":646,"OGC_FID":646,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{84153911-0E91-4E11-B64D-85FDB7CD9F59}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.647","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26567,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900251","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1692,21.5843]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":647,"OGC_FID":647,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{6953FF01-523F-41F2-A857-E59C00BAD692}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.648","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26568,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900252","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1624,21.5983]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":648,"OGC_FID":648,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{BB855223-1901-4D48-A35A-DE273EE7E537}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.649","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26569,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900253","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1679,21.5849]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":649,"OGC_FID":649,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{060EFC09-0706-40D9-86A4-8F8BE3586531}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.650","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26570,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900254","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1677,21.6079]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":650,"OGC_FID":650,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{58C9D6EB-9939-4195-906C-19AA7E33F902}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.651","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26571,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900255","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1669,21.6057]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":651,"OGC_FID":651,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{E2CDEF16-45E6-4EE6-84C6-9BF3B0D3B5F4}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.652","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26572,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900256","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1633,21.6067]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":652,"OGC_FID":652,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{0DDEE524-80EA-45AC-B726-BC071449C6B2}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.653","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26573,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900257","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1661,21.6062]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":653,"OGC_FID":653,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001009","districtbaladi":"10007850","duration":null,"elevation":null,"globalid":"{530F319C-884A-4EE6-AAE4-1BA1D5E610C6}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.654","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26574,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200100900258","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1611,21.5979]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":654,"OGC_FID":654,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"KRIMMLEY","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":null,"dateofendcontract":1168722000000,"dateofstart":1097355600000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001035","districtbaladi":"10007777","duration":null,"elevation":0.0,"globalid":"{35D43598-2499-449F-8AA5-026537E03EC2}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.655","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001004","objectid_1":26575,"projectbudget":null,"projectcentroid_id":"S4-10006","projectcentroid_unified_id":"00200103500001","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":1,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1957,21.545]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":655,"OGC_FID":655,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"KRIMMLEY","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":null,"dateofendcontract":1168722000000,"dateofstart":1097355600000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001035","districtbaladi":"10007777","duration":null,"elevation":0.0,"globalid":"{6E94B3B9-8EE7-45D1-B17E-2A5F883965BE}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.656","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001004","objectid_1":26576,"projectbudget":null,"projectcentroid_id":"S4-10006","projectcentroid_unified_id":"00200103500002","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":1,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1966,21.5407]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":656,"OGC_FID":656,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"KRIMMLEY","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":null,"dateofendcontract":1168722000000,"dateofstart":1097355600000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001035","districtbaladi":"10007777","duration":null,"elevation":0.0,"globalid":"{190E8F8C-E568-4670-816C-A18BB9415541}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.657","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001004","objectid_1":26577,"projectbudget":null,"projectcentroid_id":"S4-10006","projectcentroid_unified_id":"00200103500003","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":1,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1959,21.5441]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":657,"OGC_FID":657,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"KRIMMLEY","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":null,"dateofendcontract":1168722000000,"dateofstart":1097355600000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001035","districtbaladi":"10007777","duration":null,"elevation":0.0,"globalid":"{0D0911F6-A38C-4286-81C8-F3187FAF4686}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.658","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001004","objectid_1":26578,"projectbudget":null,"projectcentroid_id":"S4-10006","projectcentroid_unified_id":"00200103500004","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":1,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1982,21.5333]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":658,"OGC_FID":658,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"KRIMMLEY","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":null,"dateofendcontract":1168722000000,"dateofstart":1097355600000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001035","districtbaladi":"10007777","duration":null,"elevation":0.0,"globalid":"{8A744FB3-16AC-4B02-8DF3-0493776035B7}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.659","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001004","objectid_1":26579,"projectbudget":null,"projectcentroid_id":"S4-10006","projectcentroid_unified_id":"00200103500005","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":1,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1968,21.5399]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":659,"OGC_FID":659,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"KRIMMLEY","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":null,"dateofendcontract":1168722000000,"dateofstart":1097355600000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001035","districtbaladi":"10007777","duration":null,"elevation":0.0,"globalid":"{DDA5C934-3F51-42CF-9898-69494A88E62C}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.660","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001004","objectid_1":26580,"projectbudget":null,"projectcentroid_id":"S4-10006","projectcentroid_unified_id":"00200103500006","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":1,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1975,21.5367]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":660,"OGC_FID":660,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"KRIMMLEY","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":null,"dateofendcontract":1168722000000,"dateofstart":1097355600000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001035","districtbaladi":"10007777","duration":null,"elevation":0.0,"globalid":"{45D354BF-8095-4BA4-820C-6E40FEDD5B6F}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.661","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001004","objectid_1":26581,"projectbudget":null,"projectcentroid_id":"S4-10006","projectcentroid_unified_id":"00200103500007","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":1,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1969,21.5393]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":661,"OGC_FID":661,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"KRIMMLEY","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":null,"dateofendcontract":1168722000000,"dateofstart":1097355600000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001035","districtbaladi":"10007777","duration":null,"elevation":0.0,"globalid":"{0F8B31D8-D72B-4F30-AE1F-F53C67205F75}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.662","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001004","objectid_1":26582,"projectbudget":null,"projectcentroid_id":"S4-10006","projectcentroid_unified_id":"00200103500008","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":1,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1977,21.5358]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":662,"OGC_FID":662,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"KRIMMLEY","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":null,"dateofendcontract":1168722000000,"dateofstart":1097355600000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001035","districtbaladi":"10007777","duration":null,"elevation":0.0,"globalid":"{D2560033-A08B-4566-9D3F-DDBA1318D4F3}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.663","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001004","objectid_1":26583,"projectbudget":null,"projectcentroid_id":"S4-10006","projectcentroid_unified_id":"00200103500009","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":1,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1971,21.5384]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":663,"OGC_FID":663,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"KRIMMLEY","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":null,"dateofendcontract":1168722000000,"dateofstart":1097355600000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001035","districtbaladi":"10007777","duration":null,"elevation":0.0,"globalid":"{9751C342-1E05-436A-91EA-EA83B716F43D}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.664","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001004","objectid_1":26584,"projectbudget":null,"projectcentroid_id":"S4-10006","projectcentroid_unified_id":"00200103500010","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":1,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1963,21.5424]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":664,"OGC_FID":664,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"KRIMMLEY","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":null,"dateofendcontract":1168722000000,"dateofstart":1097355600000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001035","districtbaladi":"10007777","duration":null,"elevation":0.0,"globalid":"{7C8F7CD6-B0C9-4BB2-B078-416460A6F943}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.665","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001004","objectid_1":26585,"projectbudget":null,"projectcentroid_id":"S4-10006","projectcentroid_unified_id":"00200103500011","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":1,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1973,21.5376]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":665,"OGC_FID":665,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"KRIMMLEY","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":null,"dateofendcontract":1168722000000,"dateofstart":1097355600000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001035","districtbaladi":"10007777","duration":null,"elevation":0.0,"globalid":"{D59D6B65-1A13-44B8-BB2C-437251A7C876}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.666","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001004","objectid_1":26586,"projectbudget":null,"projectcentroid_id":"S4-10006","projectcentroid_unified_id":"00200103500012","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":1,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1967,21.5402]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":666,"OGC_FID":666,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"KRIMMLEY","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":null,"dateofendcontract":1168722000000,"dateofstart":1097355600000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001035","districtbaladi":"10007777","duration":null,"elevation":0.0,"globalid":"{B4168328-8BB3-4DA2-858D-FC3A31D6AA84}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.667","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001004","objectid_1":26587,"projectbudget":null,"projectcentroid_id":"S4-10006","projectcentroid_unified_id":"00200103500013","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":1,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1963,21.5421]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":667,"OGC_FID":667,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"KRIMMLEY","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":null,"dateofendcontract":1168722000000,"dateofstart":1097355600000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001035","districtbaladi":"10007777","duration":null,"elevation":0.0,"globalid":"{4A3C91D1-FA31-438B-88C3-5AB2A5C41571}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.668","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001004","objectid_1":26588,"projectbudget":null,"projectcentroid_id":"S4-10006","projectcentroid_unified_id":"00200103500014","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":1,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1958,21.5442]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":668,"OGC_FID":668,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"KRIMMLEY","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":null,"dateofendcontract":1168722000000,"dateofstart":1097355600000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001035","districtbaladi":"10007777","duration":null,"elevation":0.0,"globalid":"{C1EB2BA7-B4C2-4457-A06D-902C09AAC27F}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.669","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001004","objectid_1":26589,"projectbudget":null,"projectcentroid_id":"S4-10006","projectcentroid_unified_id":"00200103500015","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":1,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1964,21.5414]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":669,"OGC_FID":669,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"KRIMMLEY","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":null,"dateofendcontract":1168722000000,"dateofstart":1097355600000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001035","districtbaladi":"10007777","duration":null,"elevation":0.0,"globalid":"{6099682C-12DD-47BB-A214-D9AD5BC37C38}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.670","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001004","objectid_1":26590,"projectbudget":null,"projectcentroid_id":"S4-10006","projectcentroid_unified_id":"00200103500016","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":1,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.198,21.5341]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":670,"OGC_FID":670,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"KRIMMLEY","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":null,"dateofendcontract":1168722000000,"dateofstart":1097355600000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001035","districtbaladi":"10007777","duration":null,"elevation":0.0,"globalid":"{14518655-7F89-40BA-B3AB-F37C082D2CA5}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.671","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001004","objectid_1":26591,"projectbudget":null,"projectcentroid_id":"S4-10006","projectcentroid_unified_id":"00200103500017","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":1,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2007,21.5335]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":671,"OGC_FID":671,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"KRIMMLEY","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":null,"dateofendcontract":1168722000000,"dateofstart":1097355600000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001035","districtbaladi":"10007777","duration":null,"elevation":0.0,"globalid":"{3009CF81-8E8C-44C7-B291-DB7DE60E60D9}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.672","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001004","objectid_1":26592,"projectbudget":null,"projectcentroid_id":"S4-10006","projectcentroid_unified_id":"00200103500018","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":1,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1996,21.5333]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":672,"OGC_FID":672,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"KRIMMLEY","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":null,"dateofendcontract":1168722000000,"dateofstart":1097355600000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001035","districtbaladi":"10007777","duration":null,"elevation":0.0,"globalid":"{5F8C1793-562D-4FF2-9AED-9BCCE561887E}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.673","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001004","objectid_1":26593,"projectbudget":null,"projectcentroid_id":"S4-10006","projectcentroid_unified_id":"00200103500019","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":1,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1961,21.5433]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":673,"OGC_FID":673,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"KRIMMLEY","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":null,"dateofendcontract":1168722000000,"dateofstart":1097355600000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001035","districtbaladi":"10007777","duration":null,"elevation":0.0,"globalid":"{3F82F923-7678-4498-8495-1974ED2E58C0}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.674","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001004","objectid_1":26594,"projectbudget":null,"projectcentroid_id":"S4-10006","projectcentroid_unified_id":"00200103500020","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":1,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1961,21.5428]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":674,"OGC_FID":674,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"KRIMMLEY","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":null,"dateofendcontract":1168722000000,"dateofstart":1097355600000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001035","districtbaladi":"10007777","duration":null,"elevation":0.0,"globalid":"{53061257-7390-4588-9544-3CDB4D7C9A91}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.675","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001004","objectid_1":26595,"projectbudget":null,"projectcentroid_id":"S4-10006","projectcentroid_unified_id":"00200103500021","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":1,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1978,21.5349]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":675,"OGC_FID":675,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"KRIMMLEY","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":null,"dateofendcontract":1168722000000,"dateofstart":1097355600000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001035","districtbaladi":"10007777","duration":null,"elevation":0.0,"globalid":"{270A357A-49D8-4008-8ABA-274C60A68B7E}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.676","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001004","objectid_1":26596,"projectbudget":null,"projectcentroid_id":"S4-10006","projectcentroid_unified_id":"00200103500022","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":1,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1965,21.5416]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":676,"OGC_FID":676,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"KRIMMLEY","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":null,"dateofendcontract":1168722000000,"dateofstart":1097355600000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001035","districtbaladi":"10007777","duration":null,"elevation":0.0,"globalid":"{C8B0D75D-119E-4C19-B76D-688E7886B234}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.677","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001004","objectid_1":26597,"projectbudget":null,"projectcentroid_id":"S4-10006","projectcentroid_unified_id":"00200103500023","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":1,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1956,21.5452]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":677,"OGC_FID":677,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"KRIMMLEY","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":null,"dateofendcontract":1168722000000,"dateofstart":1097355600000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001035","districtbaladi":"10007777","duration":null,"elevation":0.0,"globalid":"{7F5D5B95-32A6-4411-80E9-C32DB1C12DC4}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.678","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001004","objectid_1":26598,"projectbudget":null,"projectcentroid_id":"S4-10006","projectcentroid_unified_id":"00200103500024","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":1,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1966,21.5408]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":678,"OGC_FID":678,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"KRIMMLEY","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":null,"dateofendcontract":1168722000000,"dateofstart":1097355600000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001035","districtbaladi":"10007777","duration":null,"elevation":0.0,"globalid":"{F8A006AD-B62B-4F47-987C-16B19316DE3D}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.679","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001004","objectid_1":26599,"projectbudget":null,"projectcentroid_id":"S4-10006","projectcentroid_unified_id":"00200103500025","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":1,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.196,21.5435]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":679,"OGC_FID":679,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"KRIMMLEY","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":null,"dateofendcontract":1168722000000,"dateofstart":1097355600000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001035","districtbaladi":"10007777","duration":null,"elevation":0.0,"globalid":"{E06E7A9D-8464-446B-83F9-AF7F4939AB23}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.680","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001004","objectid_1":26600,"projectbudget":null,"projectcentroid_id":"S4-10006","projectcentroid_unified_id":"00200103500026","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":1,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1983,21.5331]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":680,"OGC_FID":680,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001038","districtbaladi":"10007804","duration":null,"elevation":null,"globalid":"{88C0EC63-15D3-41DE-9B4F-910AEBD6BADD}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.681","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26601,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200103800001","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1107,21.5656]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":681,"OGC_FID":681,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001038","districtbaladi":"10007804","duration":null,"elevation":null,"globalid":"{8F465585-8AF3-41C9-BCB6-410F73A56482}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.682","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26602,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200103800002","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1096,21.5934]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":682,"OGC_FID":682,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001038","districtbaladi":"10007804","duration":null,"elevation":null,"globalid":"{E3C65603-0D83-4DF5-B732-55EF5E3CB67C}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.683","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26603,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200103800003","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1099,21.5725]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":683,"OGC_FID":683,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001038","districtbaladi":"10007804","duration":null,"elevation":null,"globalid":"{44AE0F96-855A-465A-B81C-AF000E0E3707}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.684","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26604,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200103800004","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1126,21.591]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":684,"OGC_FID":684,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001038","districtbaladi":"10007804","duration":null,"elevation":null,"globalid":"{A21D5592-F07C-4003-A1B2-DF7E88F0D1C3}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.685","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26605,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200103800005","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1109,21.5634]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":685,"OGC_FID":685,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001038","districtbaladi":"10007804","duration":null,"elevation":null,"globalid":"{A94BE9EF-A95C-4CA5-998D-9473F12328B9}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.686","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26606,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200103800006","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1091,21.5837]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":686,"OGC_FID":686,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001038","districtbaladi":"10007804","duration":null,"elevation":null,"globalid":"{E9757CDA-E7E7-4A57-B1D6-17E7DA62D8AD}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.687","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26607,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200103800007","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1096,21.5757]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":687,"OGC_FID":687,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001038","districtbaladi":"10007804","duration":null,"elevation":null,"globalid":"{74CD2EA8-F329-47B9-A0A0-69255C45C2D2}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.688","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26608,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200103800008","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1168,21.5908]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":688,"OGC_FID":688,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001038","districtbaladi":"10007804","duration":null,"elevation":null,"globalid":"{BEFB69B6-8BC9-4B1B-ADED-E52985BFA384}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.689","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26609,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200103800009","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1112,21.5605]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":689,"OGC_FID":689,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001038","districtbaladi":"10007804","duration":null,"elevation":null,"globalid":"{0BBBFE41-430D-47F9-86C8-720512226ABB}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.690","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26610,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200103800010","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1092,21.5912]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":690,"OGC_FID":690,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001038","districtbaladi":"10007804","duration":null,"elevation":null,"globalid":"{6AEE12B5-B65F-418E-AC73-152E67AAA660}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.691","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26611,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200103800011","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1096,21.579]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":691,"OGC_FID":691,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001038","districtbaladi":"10007804","duration":null,"elevation":null,"globalid":"{CEA1B440-B018-4926-9558-B7F338B9AFAD}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.692","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26612,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200103800012","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1114,21.5939]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":692,"OGC_FID":692,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001038","districtbaladi":"10007804","duration":null,"elevation":null,"globalid":"{540FEB97-63F1-498D-95A3-B17CCBA3B7FA}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.693","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26613,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200103800013","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1242,21.5906]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":693,"OGC_FID":693,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001038","districtbaladi":"10007804","duration":null,"elevation":null,"globalid":"{088D5D71-7A75-45F0-AC16-A386F43856FA}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.694","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26614,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200103800014","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.107,21.5976]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":694,"OGC_FID":694,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001038","districtbaladi":"10007804","duration":null,"elevation":null,"globalid":"{219BE84F-DD4D-4342-A092-0B3FCE72D803}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.695","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26615,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200103800015","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.112,21.5933]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":695,"OGC_FID":695,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001038","districtbaladi":"10007804","duration":null,"elevation":null,"globalid":"{232DCBA3-4B68-4586-82E6-14FBAC160585}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.696","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26616,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200103800016","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1098,21.6005]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":696,"OGC_FID":696,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001038","districtbaladi":"10007804","duration":null,"elevation":null,"globalid":"{F4E0556D-6BE0-4E77-8406-697795C40ADB}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.697","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26617,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200103800017","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1157,21.5577]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":697,"OGC_FID":697,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001038","districtbaladi":"10007804","duration":null,"elevation":null,"globalid":"{0F30C7AC-12B9-41EF-9B46-130E390E05C5}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.698","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26618,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200103800018","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1114,21.5596]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":698,"OGC_FID":698,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001038","districtbaladi":"10007804","duration":null,"elevation":null,"globalid":"{375BB1FB-A816-4344-BF7E-4B647FA75A1B}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.699","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26619,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200103800019","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1126,21.5587]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":699,"OGC_FID":699,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001038","districtbaladi":"10007804","duration":null,"elevation":null,"globalid":"{0B45D81C-8B58-4F68-A284-A9AA59205601}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.700","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26620,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200103800020","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1093,21.5914]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":700,"OGC_FID":700,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001038","districtbaladi":"10007804","duration":null,"elevation":null,"globalid":"{9B2123E7-50FA-4D72-B23D-09B4787E6FBC}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.701","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26621,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200103800021","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1096,21.5797]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":701,"OGC_FID":701,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001038","districtbaladi":"10007804","duration":null,"elevation":null,"globalid":"{0F1A26D5-151C-4E14-A62A-AB0C36F4E12B}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.702","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26622,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200103800022","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1102,21.5674]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":702,"OGC_FID":702,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001038","districtbaladi":"10007804","duration":null,"elevation":null,"globalid":"{3DD7875E-C33C-4D22-8408-81F5500B0481}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.703","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26623,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200103800023","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1083,21.5878]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":703,"OGC_FID":703,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001038","districtbaladi":"10007803","duration":null,"elevation":null,"globalid":"{D015F3B9-F24C-43E9-995B-B514A3E04703}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.704","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26624,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200103800024","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.105,21.6585]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":704,"OGC_FID":704,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001038","districtbaladi":"10007804","duration":null,"elevation":null,"globalid":"{CCDD502A-50A1-4068-A439-91AB0F6B3530}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.705","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26625,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200103800025","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1224,21.5637]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":705,"OGC_FID":705,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001038","districtbaladi":"10007804","duration":null,"elevation":null,"globalid":"{1269D8E0-5D8A-4AE4-A730-65D0C4E59AEC}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.706","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26626,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200103800026","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1095,21.5783]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":706,"OGC_FID":706,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001038","districtbaladi":"10007804","duration":null,"elevation":null,"globalid":"{5583BBAD-2768-4F0E-A108-7E513224B651}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.707","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26627,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200103800027","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1108,21.5939]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":707,"OGC_FID":707,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001038","districtbaladi":"10007804","duration":null,"elevation":null,"globalid":"{E3FC956A-3B6F-41B9-9C64-B4A8A98708BF}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.708","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26628,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200103800028","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1097,21.5755]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":708,"OGC_FID":708,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001038","districtbaladi":"10007804","duration":null,"elevation":null,"globalid":"{129A98D9-1476-4B76-8838-99D8BA5D3656}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.709","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26629,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200103800029","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.111,21.5645]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":709,"OGC_FID":709,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001038","districtbaladi":"10007804","duration":null,"elevation":null,"globalid":"{1F588B99-4B2F-482F-8BDC-37862376ECF2}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.710","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26630,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200103800030","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1242,21.5655]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":710,"OGC_FID":710,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001038","districtbaladi":"10007804","duration":null,"elevation":null,"globalid":"{23D7E2F7-11BE-4433-9474-4BF9D5B3D2C4}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.711","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26631,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200103800031","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1087,21.5855]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":711,"OGC_FID":711,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001038","districtbaladi":"10007804","duration":null,"elevation":null,"globalid":"{A158C721-C1AB-4A38-A5FA-240700DF138C}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.712","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26632,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200103800032","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1099,21.5745]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":712,"OGC_FID":712,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001038","districtbaladi":"10007804","duration":null,"elevation":null,"globalid":"{DB4A9611-34C3-4DDE-ABBD-709D51B66797}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.713","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26633,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200103800033","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1235,21.5663]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":713,"OGC_FID":713,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001038","districtbaladi":"10007804","duration":null,"elevation":null,"globalid":"{E4F3F098-2152-43FC-A65F-65F1DF7BE3A4}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.714","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26634,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200103800034","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.112,21.5939]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":714,"OGC_FID":714,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001038","districtbaladi":"10007804","duration":null,"elevation":null,"globalid":"{B1540E00-44DE-4EF8-8CE7-789B7ED464CB}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.715","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26635,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200103800035","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1099,21.5687]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":715,"OGC_FID":715,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001038","districtbaladi":"10007804","duration":null,"elevation":null,"globalid":"{8F85AE00-9407-4279-9AFB-EE3110D8564B}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.716","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26636,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200103800036","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1098,21.5717]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":716,"OGC_FID":716,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001038","districtbaladi":"10007804","duration":null,"elevation":null,"globalid":"{964C2019-4642-40EE-A547-AD7F38D4B1DA}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.717","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26637,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200103800037","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.113,21.5645]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":717,"OGC_FID":717,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001038","districtbaladi":"10007804","duration":null,"elevation":null,"globalid":"{D9199AED-A370-40F7-9DE0-B75AA54BED33}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.718","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26638,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200103800038","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1084,21.5875]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":718,"OGC_FID":718,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001038","districtbaladi":"10007804","duration":null,"elevation":null,"globalid":"{C5FB8783-E95B-4C42-9BE6-714C853370B4}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.719","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26639,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200103800039","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1109,21.5622]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":719,"OGC_FID":719,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001038","districtbaladi":"10007804","duration":null,"elevation":null,"globalid":"{672E682A-7F65-4D55-9A47-B9361FBA7015}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.720","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26640,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200103800040","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.111,21.5641]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":720,"OGC_FID":720,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001038","districtbaladi":"10007804","duration":null,"elevation":null,"globalid":"{99CB005D-5FD2-42B6-AE7F-33C0C6E2FEA5}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.721","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26641,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200103800041","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1096,21.5934]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":721,"OGC_FID":721,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001038","districtbaladi":"10007803","duration":null,"elevation":null,"globalid":"{969A1144-C75D-4A7A-B693-C3AF5D497120}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.722","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26642,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200103800042","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1044,21.6615]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":722,"OGC_FID":722,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001038","districtbaladi":"10007804","duration":null,"elevation":null,"globalid":"{EE7F87FF-D8E0-44F8-B404-C41057666060}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.723","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26643,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200103800043","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1095,21.5771]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":723,"OGC_FID":723,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001038","districtbaladi":"10007804","duration":null,"elevation":null,"globalid":"{B8B17C0C-F966-4556-874D-217577AB4AF7}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.724","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26644,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200103800044","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1126,21.5909]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":724,"OGC_FID":724,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001038","districtbaladi":"10007804","duration":null,"elevation":null,"globalid":"{10348F38-DFD3-42B3-AE1B-4B3802C58690}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.725","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26645,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200103800045","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.11,21.6011]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":725,"OGC_FID":725,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001038","districtbaladi":"10007804","duration":null,"elevation":null,"globalid":"{5CF66AC9-55D6-4001-971F-E89591E73034}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.726","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26646,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200103800046","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1089,21.5845]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":726,"OGC_FID":726,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001038","districtbaladi":"10007804","duration":null,"elevation":null,"globalid":"{F2D3D9B3-C162-419A-BF2B-EE6B2762372A}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.727","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26647,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200103800047","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1109,21.5648]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":727,"OGC_FID":727,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001038","districtbaladi":"10007804","duration":null,"elevation":null,"globalid":"{0F54BCE5-7BFE-438B-A39F-07AE0FDCF4CA}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.728","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26648,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200103800048","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1246,21.5606]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":728,"OGC_FID":728,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001038","districtbaladi":"10007804","duration":null,"elevation":null,"globalid":"{6E13019C-8537-4E34-927C-A161858E9020}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.729","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26649,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200103800049","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1109,21.5621]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":729,"OGC_FID":729,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001038","districtbaladi":"10007804","duration":null,"elevation":null,"globalid":"{A7264E21-A2FA-417F-8ADB-AF817BDD9C0D}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.730","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26650,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200103800050","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1255,21.5636]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":730,"OGC_FID":730,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001038","districtbaladi":"10007804","duration":null,"elevation":null,"globalid":"{3B4C4129-5783-4CB8-9BFC-61A422D80529}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.731","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26651,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200103800051","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1115,21.5956]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":731,"OGC_FID":731,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001038","districtbaladi":"10007804","duration":null,"elevation":null,"globalid":"{83C21447-30B7-4046-90CB-04222DB14638}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.732","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26652,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200103800052","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1108,21.5934]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":732,"OGC_FID":732,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001038","districtbaladi":"10007804","duration":null,"elevation":null,"globalid":"{AF46A69C-F585-4240-97F6-61F3588B45E4}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.733","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26653,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200103800053","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1097,21.5962]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":733,"OGC_FID":733,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001038","districtbaladi":"10007804","duration":null,"elevation":null,"globalid":"{AEC67567-E3FB-4930-9372-DC3A4943861D}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.734","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26654,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200103800054","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.113,21.5643]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":734,"OGC_FID":734,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001038","districtbaladi":"10007804","duration":null,"elevation":null,"globalid":"{D91C36D9-ACAD-4AE9-96A4-405BFBE7DA19}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.735","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26655,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200103800055","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1243,21.5668]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":735,"OGC_FID":735,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001038","districtbaladi":"10007804","duration":null,"elevation":null,"globalid":"{765A1C14-F6BD-4441-AEA0-CBD9026BB035}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.736","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26656,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200103800056","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.11,21.5739]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":736,"OGC_FID":736,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001038","districtbaladi":"10007804","duration":null,"elevation":null,"globalid":"{612413A3-735D-4D60-933B-674F6668C793}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.737","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26657,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200103800057","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1091,21.5974]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":737,"OGC_FID":737,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001038","districtbaladi":"10007804","duration":null,"elevation":null,"globalid":"{F49D1FB0-C21B-456E-8B88-6EA41E8C84AE}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.738","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26658,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200103800058","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1099,21.5692]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":738,"OGC_FID":738,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001038","districtbaladi":"10007804","duration":null,"elevation":null,"globalid":"{C0D65B8E-CBAA-4FA0-9F73-D59EDBACAF65}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.739","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26659,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200103800059","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.112,21.5939]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":739,"OGC_FID":739,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001038","districtbaladi":"10007804","duration":null,"elevation":null,"globalid":"{FE7A3D38-D413-4E12-A56E-D158C3B5019A}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.740","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26660,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200103800060","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1096,21.5939]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":740,"OGC_FID":740,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001038","districtbaladi":"10007803","duration":null,"elevation":null,"globalid":"{6A99978D-1BBA-43AB-BE22-3FCE80455EAB}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.741","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26661,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200103800061","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1036,21.6545]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":741,"OGC_FID":741,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001038","districtbaladi":"10007804","duration":null,"elevation":null,"globalid":"{0B250B27-9839-445A-86F0-D6E48881CE89}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.742","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26662,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200103800062","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1243,21.5664]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":742,"OGC_FID":742,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001038","districtbaladi":"10007804","duration":null,"elevation":null,"globalid":"{C21B11A8-7882-4FB8-BCF2-C811161C80BC}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.743","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26663,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200103800063","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1207,21.5907]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":743,"OGC_FID":743,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001038","districtbaladi":"10007804","duration":null,"elevation":null,"globalid":"{0F6D2C90-056C-4161-B550-258E5251E9E2}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.744","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26664,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200103800064","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1098,21.57]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":744,"OGC_FID":744,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001038","districtbaladi":"10007804","duration":null,"elevation":null,"globalid":"{062972D4-90E5-4663-9147-F063002C47BF}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.745","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26665,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200103800065","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.111,21.5615]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":745,"OGC_FID":745,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001038","districtbaladi":"10007804","duration":null,"elevation":null,"globalid":"{683E6237-F5BF-469C-BB3B-ED40793F9592}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.746","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26666,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200103800066","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1095,21.5823]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":746,"OGC_FID":746,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001038","districtbaladi":"10007804","duration":null,"elevation":null,"globalid":"{B6C599CB-2F37-473F-98BC-7D8291F103FE}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.747","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26667,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200103800067","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1113,21.5601]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":747,"OGC_FID":747,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001038","districtbaladi":"10007804","duration":null,"elevation":null,"globalid":"{413F0BA6-02EE-41E7-92EF-A383A07D5173}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.748","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26668,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200103800068","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1168,21.5908]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":748,"OGC_FID":748,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001038","districtbaladi":"10007804","duration":null,"elevation":null,"globalid":"{8DE8DEA6-89B4-48E9-B96C-508CCE7F7CC2}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.749","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26669,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200103800069","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1074,21.5897]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":749,"OGC_FID":749,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001038","districtbaladi":"10007804","duration":null,"elevation":null,"globalid":"{DAE5F797-F718-4CD6-A7FC-B139248BB0ED}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.750","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26670,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200103800070","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1086,21.5859]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":750,"OGC_FID":750,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001038","districtbaladi":"10007804","duration":null,"elevation":null,"globalid":"{60D03C91-FB05-4E90-906C-C0AE3F98DECB}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.751","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26671,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200103800071","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1116,21.5593]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":751,"OGC_FID":751,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001038","districtbaladi":"10007803","duration":null,"elevation":null,"globalid":"{E74F9936-DB8B-4390-8C9D-9DCFA443236E}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.752","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26672,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200103800072","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1049,21.6603]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":752,"OGC_FID":752,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001038","districtbaladi":"10007804","duration":null,"elevation":null,"globalid":"{E125423A-EFB0-43F1-9086-329A5137CBE5}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.753","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26673,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200103800073","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1133,21.5586]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":753,"OGC_FID":753,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001038","districtbaladi":"10007804","duration":null,"elevation":null,"globalid":"{7ADB67E5-5180-46E2-BECC-3A35069FA006}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.754","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26674,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200103800074","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1109,21.5626]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":754,"OGC_FID":754,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001038","districtbaladi":"10007804","duration":null,"elevation":null,"globalid":"{F2A3AC9F-7080-4F92-97D2-B46F8ED266E9}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.755","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26675,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200103800075","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.112,21.5589]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":755,"OGC_FID":755,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001038","districtbaladi":"10007804","duration":null,"elevation":null,"globalid":"{13A59007-150A-426C-B6AC-B293261A78CD}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.756","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26676,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200103800076","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1096,21.5762]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":756,"OGC_FID":756,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001038","districtbaladi":"10007804","duration":null,"elevation":null,"globalid":"{9A89BAA3-E5BD-4164-97A5-B5EB22316A0B}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.757","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26677,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200103800077","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1097,21.5808]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":757,"OGC_FID":757,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001038","districtbaladi":"10007804","duration":null,"elevation":null,"globalid":"{F0BF5641-A6BE-4F52-9902-0A695769D842}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.758","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26678,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200103800078","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1115,21.5956]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":758,"OGC_FID":758,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001038","districtbaladi":"10007804","duration":null,"elevation":null,"globalid":"{199BFC43-03D7-4860-81FF-42733C89C1AB}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.759","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26679,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200103800079","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1109,21.5652]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":759,"OGC_FID":759,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001038","districtbaladi":"10007804","duration":null,"elevation":null,"globalid":"{62CC1A15-184E-49B4-A05F-2C9CD76C521E}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.760","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26680,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200103800080","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1084,21.5975]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":760,"OGC_FID":760,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001038","districtbaladi":"10007804","duration":null,"elevation":null,"globalid":"{12061A08-ECB6-4217-94C8-BDBF56A6E96B}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.761","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26681,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200103800081","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1241,21.5636]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":761,"OGC_FID":761,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001038","districtbaladi":"10007804","duration":null,"elevation":null,"globalid":"{1C6AD780-36B3-438C-AE97-719C7623892F}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.762","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26682,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200103800082","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1109,21.563]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":762,"OGC_FID":762,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001038","districtbaladi":"10007804","duration":null,"elevation":null,"globalid":"{5DBD554D-BF02-4F0C-95C2-3BDED6445D6A}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.763","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26683,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200103800083","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1099,21.5731]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":763,"OGC_FID":763,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001038","districtbaladi":"10007804","duration":null,"elevation":null,"globalid":"{7ECD2EB9-9F5D-4E21-A541-0EABE002308E}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.764","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26684,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200103800084","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1095,21.5768]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":764,"OGC_FID":764,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001038","districtbaladi":"10007804","duration":null,"elevation":null,"globalid":"{9BD1B2BA-9DA2-4FD1-9575-34E7325663D4}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.765","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26685,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200103800085","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.107,21.5899]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":765,"OGC_FID":765,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001038","districtbaladi":"10007804","duration":null,"elevation":null,"globalid":"{FD93418D-D47C-4838-AC4D-24345F7453CD}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.766","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26686,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200103800086","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1237,21.5664]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":766,"OGC_FID":766,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001038","districtbaladi":"10007803","duration":null,"elevation":null,"globalid":"{213E6500-3F50-4D3F-BC23-F22630F7264E}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.767","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26687,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200103800087","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1046,21.6553]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":767,"OGC_FID":767,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001038","districtbaladi":"10007804","duration":null,"elevation":null,"globalid":"{0F7CB93F-A7CF-427A-8285-C8F81AD2757A}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.768","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26688,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200103800088","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1234,21.5907]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":768,"OGC_FID":768,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001038","districtbaladi":"10007803","duration":null,"elevation":null,"globalid":"{54698FC4-B169-4930-9D38-EA14EA3B47FA}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.769","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26689,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200103800089","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.107,21.5981]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":769,"OGC_FID":769,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001038","districtbaladi":"10007804","duration":null,"elevation":null,"globalid":"{61F86567-C801-4622-80F9-DC8A2875D009}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.770","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26690,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200103800090","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1137,21.5587]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":770,"OGC_FID":770,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001038","districtbaladi":"10007804","duration":null,"elevation":null,"globalid":"{EDC8EEAD-3B02-45F0-A4D7-5CD636683995}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.771","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26691,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200103800091","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1108,21.5939]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":771,"OGC_FID":771,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001038","districtbaladi":"10007804","duration":null,"elevation":null,"globalid":"{A323C43C-EFEE-4F39-95E4-66B339D311D5}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.772","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26692,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200103800092","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1095,21.582]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":772,"OGC_FID":772,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001038","districtbaladi":"10007804","duration":null,"elevation":null,"globalid":"{50F1F95C-8E58-44F6-9588-247508E6DA83}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.773","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26693,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200103800093","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1113,21.5648]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":773,"OGC_FID":773,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001038","districtbaladi":"10007804","duration":null,"elevation":null,"globalid":"{263DCB94-4F9E-4B68-8358-610C7924DBF1}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.774","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26694,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200103800094","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1235,21.5651]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":774,"OGC_FID":774,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001038","districtbaladi":"10007804","duration":null,"elevation":null,"globalid":"{9231F59D-46CB-4EEC-822C-7098137B7AF2}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.775","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26695,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200103800095","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1098,21.5697]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":775,"OGC_FID":775,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001038","districtbaladi":"10007804","duration":null,"elevation":null,"globalid":"{CE3BA71E-2E50-4D24-ADFF-ABDFEB8AB255}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.776","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26696,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200103800096","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1105,21.5666]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":776,"OGC_FID":776,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001038","districtbaladi":"10007804","duration":null,"elevation":null,"globalid":"{4DE65DDF-2A53-4D38-9EE8-1F7D199DCF95}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.777","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26697,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200103800097","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1095,21.5775]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":777,"OGC_FID":777,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001038","districtbaladi":"10007804","duration":null,"elevation":null,"globalid":"{13B6C9C9-D21E-4967-AA4F-C44DAC5620E1}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.778","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26698,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200103800098","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1108,21.5934]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":778,"OGC_FID":778,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001038","districtbaladi":"10007804","duration":null,"elevation":null,"globalid":"{2C95A800-DE52-4218-8A43-40687C9921B4}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.779","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26699,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200103800099","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.113,21.5586]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":779,"OGC_FID":779,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001038","districtbaladi":"10007804","duration":null,"elevation":null,"globalid":"{07AF5395-E700-4C23-B210-8919A29BCB35}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.780","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26700,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200103800100","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1096,21.5939]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":780,"OGC_FID":780,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001038","districtbaladi":"10007804","duration":null,"elevation":null,"globalid":"{2F9B7C7C-AABE-4E54-86BC-4295BA7C5B60}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.781","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26701,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200103800101","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1097,21.5802]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":781,"OGC_FID":781,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001038","districtbaladi":"10007804","duration":null,"elevation":null,"globalid":"{B5FC299D-61D0-413B-BE77-47249C3DDB06}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.782","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26702,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200103800102","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1096,21.5814]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":782,"OGC_FID":782,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001038","districtbaladi":"10007804","duration":null,"elevation":null,"globalid":"{9BBD5E34-8ABA-43D9-96E4-1EA4133A4461}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.783","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26703,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200103800103","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1093,21.5917]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":783,"OGC_FID":783,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001038","districtbaladi":"10007804","duration":null,"elevation":null,"globalid":"{50B6D113-5923-4004-95A9-08E0EB1ED6C3}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.784","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26704,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200103800104","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1065,21.5905]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":784,"OGC_FID":784,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001038","districtbaladi":"10007804","duration":null,"elevation":null,"globalid":"{7035C3BB-856D-45EC-B9CD-4AAAEAE5085D}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.785","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26705,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200103800105","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1101,21.6012]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":785,"OGC_FID":785,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001038","districtbaladi":"10007804","duration":null,"elevation":null,"globalid":"{BBCEC92F-5CB4-4807-8215-467464DD0435}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.786","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26706,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200103800106","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1097,21.5699]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":786,"OGC_FID":786,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001038","districtbaladi":"10007804","duration":null,"elevation":null,"globalid":"{AB65C30B-37A6-429C-BBC1-90A2E9EB7846}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.787","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26707,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200103800107","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1222,21.5619]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":787,"OGC_FID":787,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001038","districtbaladi":"10007804","duration":null,"elevation":null,"globalid":"{D94F8D12-5C6B-48A0-831E-73A4CE3BEA31}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.788","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26708,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200103800108","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1084,21.5868]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":788,"OGC_FID":788,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001038","districtbaladi":"10007804","duration":null,"elevation":null,"globalid":"{6936B0D3-CCE9-4EA5-BE27-60D23E92ADBD}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.789","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26709,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200103800109","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1247,21.5628]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":789,"OGC_FID":789,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001038","districtbaladi":"10007804","duration":null,"elevation":null,"globalid":"{379CE5C3-9A45-4ED5-BD3D-8D0108430C94}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.790","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26710,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200103800110","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1111,21.5611]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":790,"OGC_FID":790,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001038","districtbaladi":"10007804","duration":null,"elevation":null,"globalid":"{BC4869EE-D1B7-4028-B1CB-A8B10F08661A}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.791","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26711,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200103800111","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1255,21.5627]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":791,"OGC_FID":791,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001038","districtbaladi":"10007804","duration":null,"elevation":null,"globalid":"{6E0782BC-9108-4704-B275-685E2553C15F}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.792","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26712,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200103800112","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1113,21.5599]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":792,"OGC_FID":792,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001038","districtbaladi":"10007804","duration":null,"elevation":null,"globalid":"{7BC245ED-B76E-44D1-AC14-040E799139CB}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.793","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26713,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200103800113","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.113,21.5649]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":793,"OGC_FID":793,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001038","districtbaladi":"10007804","duration":null,"elevation":null,"globalid":"{0D634884-F7C4-40C2-8814-15EF570A0968}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.794","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26714,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200103800114","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1095,21.5763]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":794,"OGC_FID":794,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001038","districtbaladi":"10007804","duration":null,"elevation":null,"globalid":"{239CC0A4-3DB1-40CE-852A-B8D929D2A547}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.795","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26715,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200103800115","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1114,21.5939]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":795,"OGC_FID":795,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001038","districtbaladi":"10007804","duration":null,"elevation":null,"globalid":"{13AD652B-470F-45C0-8151-B6737444A996}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.796","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26716,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200103800116","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1246,21.5612]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":796,"OGC_FID":796,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001038","districtbaladi":"10007804","duration":null,"elevation":null,"globalid":"{87BB4881-DCB4-4B82-B977-4583721D02C0}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.797","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26717,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200103800117","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1089,21.5906]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":797,"OGC_FID":797,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001038","districtbaladi":"10007804","duration":null,"elevation":null,"globalid":"{C7860AC2-8D54-43A1-916A-53AB75B72531}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.798","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26718,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200103800118","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1141,21.5588]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":798,"OGC_FID":798,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001038","districtbaladi":"10007804","duration":null,"elevation":null,"globalid":"{09D45320-7D54-45F9-914F-F9EC63634694}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.799","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26719,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200103800119","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1067,21.5902]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":799,"OGC_FID":799,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001038","districtbaladi":"10007804","duration":null,"elevation":null,"globalid":"{918DC232-CAF3-46BA-A3CD-574DC0AE684D}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.800","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26720,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200103800120","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1104,21.567]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":800,"OGC_FID":800,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001038","districtbaladi":"10007804","duration":null,"elevation":null,"globalid":"{4CAD69F4-C62F-4422-A14A-4870E3E120A3}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.801","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26721,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200103800121","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1152,21.5588]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":801,"OGC_FID":801,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001038","districtbaladi":"10007804","duration":null,"elevation":null,"globalid":"{59908401-B093-42C2-9673-C9F94485450C}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.802","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26722,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200103800122","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1094,21.583]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":802,"OGC_FID":802,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001038","districtbaladi":"10007804","duration":null,"elevation":null,"globalid":"{6C5E085F-9E71-428C-B716-FC822A823BF0}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.803","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26723,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200103800123","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1098,21.5703]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":803,"OGC_FID":803,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001038","districtbaladi":"10007803","duration":null,"elevation":null,"globalid":"{9BD6BD54-0BA7-4A64-89CF-6B1A407F4EF5}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.804","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26724,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200103800124","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.105,21.6559]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":804,"OGC_FID":804,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001038","districtbaladi":"10007803","duration":null,"elevation":null,"globalid":"{3DDE31E4-C109-4ABE-A234-86898D3C8D99}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.805","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26725,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200103800125","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.105,21.6571]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":805,"OGC_FID":805,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001038","districtbaladi":"10007804","duration":null,"elevation":null,"globalid":"{F8E12BAB-B321-4682-94B3-AF84652DF09D}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.806","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26726,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200103800126","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1207,21.5907]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":806,"OGC_FID":806,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001038","districtbaladi":"10007804","duration":null,"elevation":null,"globalid":"{433336AB-A733-416C-8039-EA26183F8782}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.807","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26727,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200103800127","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1124,21.5588]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":807,"OGC_FID":807,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001038","districtbaladi":"10007804","duration":null,"elevation":null,"globalid":"{F8D7FA17-4807-4C4D-B04F-8C64E3B65911}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.808","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26728,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200103800128","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1097,21.5971]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":808,"OGC_FID":808,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001038","districtbaladi":"10007804","duration":null,"elevation":null,"globalid":"{BDA924E2-097D-4013-A76A-5251B42EDBE8}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.809","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26729,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200103800129","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1111,21.5609]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":809,"OGC_FID":809,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001038","districtbaladi":"10007804","duration":null,"elevation":null,"globalid":"{CED55A92-CAD4-4073-ADAD-F2EBB4CDF905}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.810","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26730,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200103800130","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1097,21.5962]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":810,"OGC_FID":810,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001038","districtbaladi":"10007804","duration":null,"elevation":null,"globalid":"{2FD485C7-CB0C-4ED0-9456-E2AEE9D7D7A1}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.811","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26731,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200103800131","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1098,21.5986]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":811,"OGC_FID":811,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001038","districtbaladi":"10007804","duration":null,"elevation":null,"globalid":"{1A46751C-564B-457E-9101-31D27AFE4032}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.812","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26732,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200103800132","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1077,21.5895]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":812,"OGC_FID":812,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001038","districtbaladi":"10007804","duration":null,"elevation":null,"globalid":"{AA11D0D2-0D53-497D-AB02-73AC6C549871}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.813","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26733,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200103800133","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.112,21.5933]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":813,"OGC_FID":813,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001038","districtbaladi":"10007804","duration":null,"elevation":null,"globalid":"{5440C955-922B-4F46-8BAF-94FF8343D906}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.814","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26734,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200103800134","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1234,21.5906]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":814,"OGC_FID":814,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001038","districtbaladi":"10007803","duration":null,"elevation":null,"globalid":"{CA5D5DA1-EC70-441F-9BC1-F46F58EFB6F6}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.815","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26735,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200103800135","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1063,21.5984]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":815,"OGC_FID":815,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001038","districtbaladi":"10007804","duration":null,"elevation":null,"globalid":"{BFD6C48F-48B3-4912-92C6-ED338439EB9C}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.816","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26736,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200103800136","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1118,21.5591]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":816,"OGC_FID":816,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001038","districtbaladi":"10007804","duration":null,"elevation":null,"globalid":"{B5D90EF1-FC43-4281-8E41-81E8C6513D13}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.817","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26737,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200103800137","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1108,21.5655]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":817,"OGC_FID":817,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001038","districtbaladi":"10007804","duration":null,"elevation":null,"globalid":"{FE77C089-82A6-4A95-8BB9-0A195F402973}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.818","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26738,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200103800138","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1099,21.5683]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":818,"OGC_FID":818,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001038","districtbaladi":"10007804","duration":null,"elevation":null,"globalid":"{D957C6A0-805C-4198-8D2D-BDAF15D7B567}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.819","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26739,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200103800139","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1158,21.5585]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":819,"OGC_FID":819,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001040","districtbaladi":"10007934","duration":null,"elevation":null,"globalid":"{BBD9C13F-B84E-48F8-8C1B-68A4C915FE2B}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.820","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26740,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200104000001","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1141,21.7207]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":820,"OGC_FID":820,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001040","districtbaladi":"10007934","duration":null,"elevation":null,"globalid":"{B8A8F45C-B80B-433E-B1E2-AE5706415424}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.821","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26741,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200104000002","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1165,21.7252]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":821,"OGC_FID":821,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001040","districtbaladi":"10007934","duration":null,"elevation":null,"globalid":"{3DD9E06A-3F71-4089-A2E0-914CA3706866}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.822","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26742,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200104000003","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1158,21.7235]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":822,"OGC_FID":822,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001040","districtbaladi":"10007934","duration":null,"elevation":null,"globalid":"{1B6938CC-4F61-4E62-8DA0-5F368BD07D9F}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.823","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26743,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200104000004","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1202,21.7348]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":823,"OGC_FID":823,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001040","districtbaladi":"10007934","duration":null,"elevation":null,"globalid":"{D0FC3AF5-CFA5-4BA6-B9CA-5B959FE28281}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.824","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26744,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200104000005","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.112,21.7189]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":824,"OGC_FID":824,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001040","districtbaladi":"10007934","duration":null,"elevation":null,"globalid":"{C5112AA2-5447-4CAD-BC00-405BDF9AB6C4}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.825","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26745,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200104000006","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.115,21.7218]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":825,"OGC_FID":825,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001040","districtbaladi":"10007934","duration":null,"elevation":null,"globalid":"{E1733B8C-4855-44AC-B8B5-8FB63314F9E1}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.826","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26746,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200104000007","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1145,21.7211]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":826,"OGC_FID":826,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001040","districtbaladi":"10007934","duration":null,"elevation":null,"globalid":"{A2E2EBE3-90E3-46E7-B989-222EEDD613FF}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.827","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26747,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200104000008","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1153,21.7224]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":827,"OGC_FID":827,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001040","districtbaladi":"10007934","duration":null,"elevation":null,"globalid":"{B8D59D95-1D36-4DBF-BA06-D7ED489AFD0C}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.828","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26748,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200104000009","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1092,21.7177]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":828,"OGC_FID":828,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001040","districtbaladi":"10007934","duration":null,"elevation":null,"globalid":"{FE02E260-A654-43DA-812E-F6822089C98D}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.829","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26749,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200104000010","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1179,21.7304]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":829,"OGC_FID":829,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001040","districtbaladi":"10007934","duration":null,"elevation":null,"globalid":"{FAB62FAB-5454-4DF4-9D8D-EFCD6B95C49F}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.830","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26750,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200104000011","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1135,21.72]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":830,"OGC_FID":830,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001040","districtbaladi":"10007934","duration":null,"elevation":null,"globalid":"{4D108E4E-1CB2-4E74-BD03-E14728FD562A}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.831","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26751,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200104000012","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1038,21.7165]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":831,"OGC_FID":831,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001040","districtbaladi":"10007934","duration":null,"elevation":null,"globalid":"{9B1A8861-4BC6-430E-9698-8084256F88A0}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.832","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26752,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200104000013","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1185,21.733]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":832,"OGC_FID":832,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001040","districtbaladi":"10007934","duration":null,"elevation":null,"globalid":"{ABF4793C-19ED-41F3-B1F2-5E27AA57250C}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.833","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26753,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200104000014","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1195,21.7341]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":833,"OGC_FID":833,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001040","districtbaladi":"10007934","duration":null,"elevation":null,"globalid":"{C9ACB145-4409-4D8F-BBCE-8F0DED565445}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.834","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26754,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200104000015","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1162,21.7243]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":834,"OGC_FID":834,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001040","districtbaladi":"10007934","duration":null,"elevation":null,"globalid":"{E8B2475E-12CB-48EC-BB90-D24E19636AAA}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.835","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26755,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200104000016","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1173,21.7285]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":835,"OGC_FID":835,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001040","districtbaladi":"10007934","duration":null,"elevation":null,"globalid":"{FD522C1B-0B51-47F2-BB4F-CCBC62110672}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.836","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26756,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200104000017","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.12,21.7347]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":836,"OGC_FID":836,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001040","districtbaladi":"10007934","duration":null,"elevation":null,"globalid":"{A961004A-08BB-4A58-BE4E-133192A6A256}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.837","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26757,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200104000018","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1148,21.7215]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":837,"OGC_FID":837,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001040","districtbaladi":"10007934","duration":null,"elevation":null,"globalid":"{5E378A93-13EB-464A-8AA0-19FEF21C2349}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.838","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26758,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200104000019","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1171,21.7279]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":838,"OGC_FID":838,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001040","districtbaladi":"10007934","duration":null,"elevation":null,"globalid":"{4475C052-61BB-4DD1-A414-4F64298B55DF}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.839","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26759,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200104000020","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1155,21.7226]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":839,"OGC_FID":839,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001040","districtbaladi":"10007934","duration":null,"elevation":null,"globalid":"{6B3A36B3-D53D-4CFD-AA65-301B6DF9BA50}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.840","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26760,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200104000021","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1157,21.7244]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":840,"OGC_FID":840,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001040","districtbaladi":"10007934","duration":null,"elevation":null,"globalid":"{93A85D97-8AE5-49E7-A3DD-FA5A4B67018B}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.841","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26761,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200104000022","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1043,21.7166]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":841,"OGC_FID":841,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001040","districtbaladi":"10007934","duration":null,"elevation":null,"globalid":"{838BFE64-E4F2-4DB4-BEF9-712B83BE468F}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.842","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26762,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200104000023","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1169,21.727]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":842,"OGC_FID":842,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001040","districtbaladi":"10007934","duration":null,"elevation":null,"globalid":"{CD02786C-04F3-446D-A6FC-C4B9E18331D9}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.843","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26763,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200104000024","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1183,21.7325]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":843,"OGC_FID":843,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001040","districtbaladi":"10007934","duration":null,"elevation":null,"globalid":"{80699274-BE63-4A9F-AA89-8E5E86F15AAB}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.844","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26764,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200104000025","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1177,21.7295]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":844,"OGC_FID":844,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001040","districtbaladi":"10007934","duration":null,"elevation":null,"globalid":"{C12ADBB5-2DAE-4AF7-BB22-2FB6C0CD463A}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.845","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26765,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200104000026","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1181,21.7313]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":845,"OGC_FID":845,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001040","districtbaladi":"10007934","duration":null,"elevation":null,"globalid":"{ECDEA4B4-9603-4E77-9D62-5BE650893E4C}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.846","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26766,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200104000027","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1167,21.7287]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":846,"OGC_FID":846,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001040","districtbaladi":"10007934","duration":null,"elevation":null,"globalid":"{D5EED8AE-F14E-4E4B-AA04-0E298FC01D66}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.847","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26767,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200104000028","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1087,21.7176]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":847,"OGC_FID":847,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001040","districtbaladi":"10007934","duration":null,"elevation":null,"globalid":"{B452FF0E-9802-45C9-BFDB-BBE8053728BB}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.848","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26768,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200104000029","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1167,21.7261]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":848,"OGC_FID":848,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001040","districtbaladi":"10007934","duration":null,"elevation":null,"globalid":"{F806D94D-0E84-46D5-86E7-B514C826ED56}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.849","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001009","objectid_1":26769,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200104000030","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1107,21.718]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":849,"OGC_FID":849,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001052","districtbaladi":"10007828","duration":null,"elevation":null,"globalid":"{DD8C8813-4275-4771-A542-BA92D4F02F10}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.850","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26770,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105200001","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1751,21.6253]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":850,"OGC_FID":850,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001052","districtbaladi":"10007828","duration":null,"elevation":null,"globalid":"{EE94657C-37AF-412B-BA8E-AD8069426367}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.851","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26771,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105200002","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1841,21.625]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":851,"OGC_FID":851,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001052","districtbaladi":"10007828","duration":null,"elevation":null,"globalid":"{DF851CF0-2B4B-41CE-8033-665BC29F2EFD}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.852","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26772,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105200003","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1742,21.6215]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":852,"OGC_FID":852,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001052","districtbaladi":"10007828","duration":null,"elevation":null,"globalid":"{6AE48247-4B4C-406D-8DFE-AFEEC05C5573}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.853","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26773,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105200004","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1567,21.6142]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":853,"OGC_FID":853,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001052","districtbaladi":"10007828","duration":null,"elevation":null,"globalid":"{75E54A33-3CA6-4A5D-9975-4CD866D50CF7}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.854","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26774,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105200005","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1702,21.6168]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":854,"OGC_FID":854,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001052","districtbaladi":"10007828","duration":null,"elevation":null,"globalid":"{4B69F2B0-FB85-4576-8F98-C1E0CB095DA8}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.855","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26775,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105200006","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1811,21.6189]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":855,"OGC_FID":855,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001052","districtbaladi":"10007828","duration":null,"elevation":null,"globalid":"{C1B12635-C775-44FF-BAFD-12F49F4360B2}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.856","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26776,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105200007","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1791,21.6223]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":856,"OGC_FID":856,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001052","districtbaladi":"10007828","duration":null,"elevation":null,"globalid":"{1DFDB97F-D1FE-4FB5-8939-630C1EE2BFE7}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.857","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26777,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105200008","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1551,21.617]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":857,"OGC_FID":857,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001052","districtbaladi":"10007828","duration":null,"elevation":null,"globalid":"{8FA144A8-178E-4878-ABA3-521A9163F8B8}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.858","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26778,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105200009","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1738,21.6299]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":858,"OGC_FID":858,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001052","districtbaladi":"10007828","duration":null,"elevation":null,"globalid":"{9DB2A350-7032-4FFA-9758-86DD1881287E}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.859","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26779,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105200010","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1685,21.6248]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":859,"OGC_FID":859,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001052","districtbaladi":"10007828","duration":null,"elevation":null,"globalid":"{7DE18FFE-FDEF-4FDD-90B6-F9287EA8AC09}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.860","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26780,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105200011","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1545,21.6206]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":860,"OGC_FID":860,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001052","districtbaladi":"10007828","duration":null,"elevation":null,"globalid":"{160CD1E9-6D43-42B1-B5E2-366FD8469413}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.861","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26781,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105200012","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1546,21.6199]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":861,"OGC_FID":861,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001052","districtbaladi":"10007828","duration":null,"elevation":null,"globalid":"{457C195A-FF56-41C2-89C9-97A46E694443}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.862","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26782,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105200013","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1716,21.6209]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":862,"OGC_FID":862,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001052","districtbaladi":"10007828","duration":null,"elevation":null,"globalid":"{65CE1ABE-6EEA-44F4-841F-C6334C7A81DC}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.863","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26783,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105200014","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1542,21.6222]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":863,"OGC_FID":863,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001052","districtbaladi":"10007828","duration":null,"elevation":null,"globalid":"{61C34A99-81FB-46B4-AD0C-94CCED9CF6D6}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.864","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26784,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105200015","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1764,21.6218]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":864,"OGC_FID":864,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001052","districtbaladi":"10007828","duration":null,"elevation":null,"globalid":"{AC8184F0-482B-47A5-A133-25CDEE08EE93}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.865","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26785,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105200016","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1619,21.6192]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":865,"OGC_FID":865,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001052","districtbaladi":"10007828","duration":null,"elevation":null,"globalid":"{4EFAD391-EEE3-4826-A342-721351769AC7}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.866","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26786,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105200017","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1598,21.6186]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":866,"OGC_FID":866,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001052","districtbaladi":"10007828","duration":null,"elevation":null,"globalid":"{E5727C49-92F5-4003-A553-D748346B529C}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.867","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26787,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105200018","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1673,21.6202]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":867,"OGC_FID":867,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001052","districtbaladi":"10007828","duration":null,"elevation":null,"globalid":"{6C173E3C-785B-4276-9FA7-14D7B68F9192}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.868","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26788,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105200019","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1846,21.6234]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":868,"OGC_FID":868,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001052","districtbaladi":"10007828","duration":null,"elevation":null,"globalid":"{E99DBB42-0ACA-42C2-83C0-3FCCFF3F5D26}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.869","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26789,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105200020","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1644,21.6156]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":869,"OGC_FID":869,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001052","districtbaladi":"10007828","duration":null,"elevation":null,"globalid":"{24FC05FB-6A8D-42A2-A414-6B4937CC9730}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.870","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26790,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105200021","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1723,21.6171]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":870,"OGC_FID":870,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001052","districtbaladi":"10007828","duration":null,"elevation":null,"globalid":"{39BA68AA-2348-4D50-9ED0-30EBC0403D4C}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.871","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26791,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105200022","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1555,21.6291]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":871,"OGC_FID":871,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001052","districtbaladi":"10007828","duration":null,"elevation":null,"globalid":"{9877C8C0-1FD2-4C3E-907B-270DC5C7ADCC}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.872","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26792,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105200023","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1843,21.6243]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":872,"OGC_FID":872,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001052","districtbaladi":"10007828","duration":null,"elevation":null,"globalid":"{AEE13F81-6CDB-4726-807D-C9DCA486A132}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.873","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26793,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105200024","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1571,21.6176]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":873,"OGC_FID":873,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001052","districtbaladi":"10007828","duration":null,"elevation":null,"globalid":"{55556061-57AE-45EC-B8A6-C41F1A8179CB}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.874","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26794,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105200025","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1681,21.6203]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":874,"OGC_FID":874,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001052","districtbaladi":"10007828","duration":null,"elevation":null,"globalid":"{0CC02651-D378-41C6-A768-E6415DEAAA4A}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.875","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26795,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105200026","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1543,21.6245]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":875,"OGC_FID":875,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001052","districtbaladi":"10007828","duration":null,"elevation":null,"globalid":"{18FC0FFA-1E11-49C5-838F-250A64673092}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.876","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26796,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105200027","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.17,21.6206]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":876,"OGC_FID":876,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001052","districtbaladi":"10007828","duration":null,"elevation":null,"globalid":"{8C22843D-08CB-4FA9-AC6C-31A151B023DA}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.877","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26797,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105200028","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1668,21.6288]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":877,"OGC_FID":877,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001052","districtbaladi":"10007828","duration":null,"elevation":null,"globalid":"{77751EA4-76FB-43CC-9BDA-A5339CF3C055}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.878","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26798,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105200029","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1571,21.6181]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":878,"OGC_FID":878,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001052","districtbaladi":"10007828","duration":null,"elevation":null,"globalid":"{F0855925-CD66-4AB1-8C7E-CFA5BDF262C1}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.879","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26799,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105200030","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1569,21.6182]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":879,"OGC_FID":879,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001052","districtbaladi":"10007828","duration":null,"elevation":null,"globalid":"{65D0B735-0B81-4339-A908-D7BCAAA49B9B}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.880","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26800,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105200031","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1553,21.6165]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":880,"OGC_FID":880,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001052","districtbaladi":"10007828","duration":null,"elevation":null,"globalid":"{14E8CEC1-A9C2-410D-A0FA-3A50ADFE1517}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.881","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26801,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105200032","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1757,21.6234]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":881,"OGC_FID":881,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001052","districtbaladi":"10007828","duration":null,"elevation":null,"globalid":"{BDECCB9B-2F2D-4C43-B9ED-3B9FB6DB3C1C}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.882","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26802,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105200033","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1663,21.6301]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":882,"OGC_FID":882,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001052","districtbaladi":"10007828","duration":null,"elevation":null,"globalid":"{2C2D136E-8D08-47FF-B2A4-4D3DA051C80A}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.883","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26803,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105200034","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1628,21.6193]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":883,"OGC_FID":883,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001052","districtbaladi":"10007828","duration":null,"elevation":null,"globalid":"{B07CFE5B-7E85-4986-B209-C1D7AC79306F}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.884","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26804,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105200035","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1788,21.6184]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":884,"OGC_FID":884,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001052","districtbaladi":"10007828","duration":null,"elevation":null,"globalid":"{EDA4A366-D3BA-497C-A86C-33144B15BAD7}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.885","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26805,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105200036","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1573,21.6163]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":885,"OGC_FID":885,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001052","districtbaladi":"10007828","duration":null,"elevation":null,"globalid":"{0E53480C-3E0A-4266-8834-DE0D5DF6317A}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.886","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26806,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105200037","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1836,21.6263]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":886,"OGC_FID":886,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001052","districtbaladi":"10007828","duration":null,"elevation":null,"globalid":"{55C34EEE-8B33-4974-8BC5-A59CA4B47079}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.887","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26807,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105200038","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.176,21.6226]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":887,"OGC_FID":887,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001052","districtbaladi":"10007828","duration":null,"elevation":null,"globalid":"{6361B1D6-2915-468A-A299-62F77D85FA7E}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.888","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26808,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105200039","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1746,21.6269]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":888,"OGC_FID":888,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001052","districtbaladi":"10007828","duration":null,"elevation":null,"globalid":"{75CF5A54-CA69-400C-9E75-C4FFC46746F8}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.889","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26809,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105200040","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1715,21.617]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":889,"OGC_FID":889,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001052","districtbaladi":"10007828","duration":null,"elevation":null,"globalid":"{9E67A3E2-F331-4F5F-A0A2-A8C91CB1B0BA}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.890","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26810,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105200041","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1575,21.6151]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":890,"OGC_FID":890,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001052","districtbaladi":"10007828","duration":null,"elevation":null,"globalid":"{4A71CC1E-E4DB-4D8C-8315-383D265C3B3A}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.891","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26811,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105200042","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.161,21.6189]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":891,"OGC_FID":891,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001052","districtbaladi":"10007828","duration":null,"elevation":null,"globalid":"{1BAD5046-8009-435D-865B-46D3886E38DB}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.892","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26812,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105200043","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1776,21.6182]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":892,"OGC_FID":892,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001052","districtbaladi":"10007828","duration":null,"elevation":null,"globalid":"{D4515013-D737-4D6C-962D-FDACAA7B4F3B}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.893","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26813,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105200044","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1822,21.6229]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":893,"OGC_FID":893,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001052","districtbaladi":"10007828","duration":null,"elevation":null,"globalid":"{A7437323-C1F2-4851-942D-FB649E9FB622}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.894","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26814,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105200045","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1533,21.6317]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":894,"OGC_FID":894,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001052","districtbaladi":"10007828","duration":null,"elevation":null,"globalid":"{BA1B4228-0385-4155-AEAD-57E984B14D9E}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.895","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26815,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105200046","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1543,21.6251]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":895,"OGC_FID":895,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001052","districtbaladi":"10007828","duration":null,"elevation":null,"globalid":"{FC870824-70B6-423B-A25E-92193D8D1E29}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.896","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26816,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105200047","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1576,21.6183]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":896,"OGC_FID":896,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001052","districtbaladi":"10007828","duration":null,"elevation":null,"globalid":"{0F9EA5F9-127C-406A-B2E9-E09BAEEEFB61}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.897","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26817,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105200048","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1609,21.619]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":897,"OGC_FID":897,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001052","districtbaladi":"10007828","duration":null,"elevation":null,"globalid":"{20B96CD7-F7D5-4EA2-B69E-93A926D143E1}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.898","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26818,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105200049","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1559,21.618]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":898,"OGC_FID":898,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001052","districtbaladi":"10007828","duration":null,"elevation":null,"globalid":"{0B1C8BE4-43BD-4701-8FF2-120AB87EFC4C}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.899","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26819,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105200050","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1542,21.6259]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":899,"OGC_FID":899,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001052","districtbaladi":"10007828","duration":null,"elevation":null,"globalid":"{4C7EAE96-0941-4EBB-9F52-4052B4462341}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.900","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26820,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105200051","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1771,21.6181]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":900,"OGC_FID":900,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001052","districtbaladi":"10007828","duration":null,"elevation":null,"globalid":"{786D2D7F-4D2E-4577-9F4B-AD6BF2B7402A}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.901","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26821,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105200052","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1736,21.6174]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":901,"OGC_FID":901,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001052","districtbaladi":"10007828","duration":null,"elevation":null,"globalid":"{204BB523-75AC-4B26-97BA-C0B538255389}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.902","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26822,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105200053","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.185,21.6221]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":902,"OGC_FID":902,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001052","districtbaladi":"10007828","duration":null,"elevation":null,"globalid":"{AAB8D50E-518B-4491-BAA3-E59284F75710}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.903","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26823,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105200054","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1599,21.6306]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":903,"OGC_FID":903,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001052","districtbaladi":"10007828","duration":null,"elevation":null,"globalid":"{E3920309-892D-4522-A255-6F140E42FF9E}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.904","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26824,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105200055","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1755,21.6241]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":904,"OGC_FID":904,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001052","districtbaladi":"10007828","duration":null,"elevation":null,"globalid":"{CA38EC18-99F4-474F-BF03-FE4F55D96150}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.905","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26825,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105200056","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1687,21.6241]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":905,"OGC_FID":905,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001052","districtbaladi":"10007828","duration":null,"elevation":null,"globalid":"{20751CD4-AA13-4764-B521-899FA49ADFAC}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.906","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26826,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105200057","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1845,21.6237]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":906,"OGC_FID":906,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001052","districtbaladi":"10007828","duration":null,"elevation":null,"globalid":"{B3825AAF-01D3-4618-BAA5-BDCF90735C25}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.907","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26827,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105200058","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1678,21.6163]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":907,"OGC_FID":907,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001052","districtbaladi":"10007828","duration":null,"elevation":null,"globalid":"{3D9C7282-FC28-46A2-AA71-B1CE07B03D79}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.908","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26828,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105200059","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1693,21.6225]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":908,"OGC_FID":908,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001052","districtbaladi":"10007828","duration":null,"elevation":null,"globalid":"{A5023816-BC2A-411B-AE45-D15101D100AF}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.909","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26829,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105200060","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1661,21.6183]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":909,"OGC_FID":909,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001052","districtbaladi":"10007828","duration":null,"elevation":null,"globalid":"{1006B119-580C-4341-B7FA-2EDEBC660420}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.910","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26830,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105200061","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1632,21.6154]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":910,"OGC_FID":910,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001052","districtbaladi":"10007828","duration":null,"elevation":null,"globalid":"{7607E0D5-760A-4973-9A92-70000B15B964}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.911","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26831,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105200062","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1593,21.6147]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":911,"OGC_FID":911,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001052","districtbaladi":"10007828","duration":null,"elevation":null,"globalid":"{A7F1A8B9-B1F5-442A-A6AB-D7CC3C2BA738}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.912","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26832,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105200063","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1541,21.623]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":912,"OGC_FID":912,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001052","districtbaladi":"10007828","duration":null,"elevation":null,"globalid":"{4FBF1139-F1F4-4987-A782-EA0950D9B5BE}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.913","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26833,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105200064","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.154,21.6275]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":913,"OGC_FID":913,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001052","districtbaladi":"10007828","duration":null,"elevation":null,"globalid":"{F2B4017E-7CF3-42D4-8087-B0A570E87902}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.914","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26834,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105200065","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1834,21.627]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":914,"OGC_FID":914,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001052","districtbaladi":"10007828","duration":null,"elevation":null,"globalid":"{3D0C39B9-660B-47EE-A07F-EB759899F69D}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.915","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26835,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105200066","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1824,21.6191]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":915,"OGC_FID":915,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001052","districtbaladi":"10007828","duration":null,"elevation":null,"globalid":"{132A3E94-F1B9-4C31-8C7C-3B5A58B51360}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.916","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26836,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105200067","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1605,21.6188]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":916,"OGC_FID":916,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001052","districtbaladi":"10007828","duration":null,"elevation":null,"globalid":"{26DFBA3F-C3AB-4EDB-B4FD-55468CBE4F6E}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.917","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26837,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105200068","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1659,21.6191]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":917,"OGC_FID":917,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001052","districtbaladi":"10007828","duration":null,"elevation":null,"globalid":"{811C629E-DF0D-4F74-98F9-5F64F5847404}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.918","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26838,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105200069","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1666,21.6293]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":918,"OGC_FID":918,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001052","districtbaladi":"10007828","duration":null,"elevation":null,"globalid":"{9C4F4EBF-96CE-4C42-9431-71E6203E4699}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.919","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26839,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105200070","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1784,21.6183]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":919,"OGC_FID":919,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001052","districtbaladi":"10007828","duration":null,"elevation":null,"globalid":"{F53EC140-9DB2-46F5-A967-A78DBC06B768}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.920","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26840,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105200071","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1662,21.6305]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":920,"OGC_FID":920,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001052","districtbaladi":"10007828","duration":null,"elevation":null,"globalid":"{0E17AF30-51B2-4A59-8388-3A28CB0D8977}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.921","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26841,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105200072","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1681,21.6256]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":921,"OGC_FID":921,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001052","districtbaladi":"10007828","duration":null,"elevation":null,"globalid":"{5F6EB05C-0967-4CF5-8346-2EA8CE53B3A0}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.922","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26842,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105200073","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1665,21.62]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":922,"OGC_FID":922,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001052","districtbaladi":"10007828","duration":null,"elevation":null,"globalid":"{84169446-6998-4D1C-B45C-6C4D7DB1B50D}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.923","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26843,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105200074","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1671,21.6201]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":923,"OGC_FID":923,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001052","districtbaladi":"10007828","duration":null,"elevation":null,"globalid":"{F3F5A015-BC82-4C8A-A96D-EB86FDE195CC}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.924","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26844,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105200075","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1748,21.6261]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":924,"OGC_FID":924,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001052","districtbaladi":"10007828","duration":null,"elevation":null,"globalid":"{7EFABEC9-659C-4D57-A3FD-26D0DB6241DA}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.925","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26845,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105200076","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1756,21.6178]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":925,"OGC_FID":925,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001052","districtbaladi":"10007828","duration":null,"elevation":null,"globalid":"{D908F44F-208B-4A8B-9F90-C314A6D6633C}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.926","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26846,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105200077","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1752,21.6217]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":926,"OGC_FID":926,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001052","districtbaladi":"10007828","duration":null,"elevation":null,"globalid":"{98F872D0-008A-4312-B146-36111D84159E}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.927","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26847,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105200078","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1646,21.6197]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":927,"OGC_FID":927,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001052","districtbaladi":"10007828","duration":null,"elevation":null,"globalid":"{798E85B5-41B6-4199-ABB1-6F9E0C26DBB9}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.928","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26848,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105200079","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1804,21.6226]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":928,"OGC_FID":928,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001052","districtbaladi":"10007828","duration":null,"elevation":null,"globalid":"{454E9EB8-87C9-4A44-87AF-2BF8F9712154}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.929","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26849,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105200080","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1672,21.6279]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":929,"OGC_FID":929,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001052","districtbaladi":"10007828","duration":null,"elevation":null,"globalid":"{00D20160-43FF-416D-9615-92506EE06EF5}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.930","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26850,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105200081","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1625,21.6153]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":930,"OGC_FID":930,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001052","districtbaladi":"10007828","duration":null,"elevation":null,"globalid":"{38A8F42E-2F7C-4675-B888-774E911724BA}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.931","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26851,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105200082","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1533,21.6312]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":931,"OGC_FID":931,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001052","districtbaladi":"10007828","duration":null,"elevation":null,"globalid":"{EADC866C-774D-452A-979B-7703435A790C}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.932","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26852,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105200083","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1729,21.6212]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":932,"OGC_FID":932,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001052","districtbaladi":"10007828","duration":null,"elevation":null,"globalid":"{C53BBF4F-5C7C-4A3A-A815-4185147C9578}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.933","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26853,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105200084","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1799,21.6186]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":933,"OGC_FID":933,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001052","districtbaladi":"10007828","duration":null,"elevation":null,"globalid":"{CABE58FF-B613-484D-A026-93A6B452DFB0}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.934","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26854,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105200085","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1746,21.6215]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":934,"OGC_FID":934,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001052","districtbaladi":"10007828","duration":null,"elevation":null,"globalid":"{A84D29DF-BDFE-475D-A9BE-97942C1BA7AF}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.935","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26855,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105200086","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1662,21.6183]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":935,"OGC_FID":935,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001052","districtbaladi":"10007828","duration":null,"elevation":null,"globalid":"{6005B765-EFC8-48C5-B331-EF6DD5A7ACB9}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.936","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26856,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105200087","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1697,21.6216]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":936,"OGC_FID":936,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001052","districtbaladi":"10007828","duration":null,"elevation":null,"globalid":"{BD2C4094-1CCB-4574-AA51-AB44B4E8A1E9}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.937","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26857,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105200088","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1572,21.6169]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":937,"OGC_FID":937,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001052","districtbaladi":"10007828","duration":null,"elevation":null,"globalid":"{EB13A534-EDC4-4FA3-8B4B-F00DC1BB2A7F}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.938","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26858,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105200089","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1545,21.6288]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":938,"OGC_FID":938,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001052","districtbaladi":"10007828","duration":null,"elevation":null,"globalid":"{EC16AA9C-3312-4DBD-AF7E-771C9C941A91}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.939","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26859,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105200090","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1681,21.6164]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":939,"OGC_FID":939,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001052","districtbaladi":"10007828","duration":null,"elevation":null,"globalid":"{EA77C7B4-7CAD-466E-BACE-EFDE744272D3}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.940","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26860,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105200091","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1661,21.616]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":940,"OGC_FID":940,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001052","districtbaladi":"10007828","duration":null,"elevation":null,"globalid":"{66EAC953-2A5F-4034-84C0-7781058EC80B}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.941","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26861,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105200092","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1637,21.6194]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":941,"OGC_FID":941,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001052","districtbaladi":"10007828","duration":null,"elevation":null,"globalid":"{E78E851D-0732-450F-8166-BC1858C6E8EB}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.942","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26862,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105200093","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1724,21.6212]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":942,"OGC_FID":942,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001052","districtbaladi":"10007828","duration":null,"elevation":null,"globalid":"{4F6D68CC-50F9-437F-89CC-6F717150FCB5}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.943","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26863,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105200094","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1715,21.621]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":943,"OGC_FID":943,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001052","districtbaladi":"10007828","duration":null,"elevation":null,"globalid":"{CFC1A864-E0A0-4E73-9894-72F377123F63}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.944","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26864,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105200095","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1704,21.6208]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":944,"OGC_FID":944,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001052","districtbaladi":"10007828","duration":null,"elevation":null,"globalid":"{2B70FA9C-D9D8-4CA8-B066-28523AA67887}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.945","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26865,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105200096","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1763,21.6219]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":945,"OGC_FID":945,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001052","districtbaladi":"10007828","duration":null,"elevation":null,"globalid":"{9776EE2C-E09D-4A54-BD5B-BBE8FAD64A0A}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.946","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26866,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105200097","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1637,21.6195]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":946,"OGC_FID":946,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001052","districtbaladi":"10007828","duration":null,"elevation":null,"globalid":"{8DC31B00-A3EB-4D3C-895B-98FF53826109}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.947","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26867,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105200098","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1573,21.6297]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":947,"OGC_FID":947,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001052","districtbaladi":"10007828","duration":null,"elevation":null,"globalid":"{0D83DF1B-49D4-4CAA-9214-4EFB06A66A04}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.948","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26868,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105200099","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1674,21.6165]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":948,"OGC_FID":948,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001052","districtbaladi":"10007828","duration":null,"elevation":null,"globalid":"{F23A617E-60F3-4C28-A2A2-18928769CEA4}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.949","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26869,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105200100","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1577,21.6182]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":949,"OGC_FID":949,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001052","districtbaladi":"10007828","duration":null,"elevation":null,"globalid":"{AEF4C822-ABB9-48E8-A003-28F2E8D809CD}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.950","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26870,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105200101","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1687,21.6205]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":950,"OGC_FID":950,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001052","districtbaladi":"10007828","duration":null,"elevation":null,"globalid":"{76BF77B0-AC34-4C35-A9A1-8FB7F9232CC8}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.951","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26871,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105200102","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.155,21.6178]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":951,"OGC_FID":951,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001052","districtbaladi":"10007828","duration":null,"elevation":null,"globalid":"{7FA69977-D0A1-41EF-876D-26EF393FA2D6}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.952","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26872,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105200103","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1551,21.6177]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":952,"OGC_FID":952,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001052","districtbaladi":"10007828","duration":null,"elevation":null,"globalid":"{747075AA-F7F9-4A69-89F8-FD7E1E44786F}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.953","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26873,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105200104","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1557,21.614]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":953,"OGC_FID":953,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001052","districtbaladi":"10007828","duration":null,"elevation":null,"globalid":"{0E51B1A2-15DB-4BB5-BC77-C2746B4EE391}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.954","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26874,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105200105","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1677,21.6268]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":954,"OGC_FID":954,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001052","districtbaladi":"10007828","duration":null,"elevation":null,"globalid":"{83C3659D-5E1E-4CFC-9F24-63A102CAAC1E}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.955","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26875,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105200106","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1651,21.6197]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":955,"OGC_FID":955,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001052","districtbaladi":"10007828","duration":null,"elevation":null,"globalid":"{69934EBC-356E-4CD6-AB3E-D38152F517CE}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.956","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26876,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105200107","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1574,21.6157]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":956,"OGC_FID":956,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001052","districtbaladi":"10007828","duration":null,"elevation":null,"globalid":"{16685D9B-F731-49AB-B3E0-7FD0CDCB657E}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.957","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26877,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105200108","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1696,21.6166]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":957,"OGC_FID":957,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001052","districtbaladi":"10007828","duration":null,"elevation":null,"globalid":"{B471B7D3-51B4-4F28-BF2F-A1E9CB5F5156}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.958","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26878,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105200109","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1685,21.6203]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":958,"OGC_FID":958,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001052","districtbaladi":"10007828","duration":null,"elevation":null,"globalid":"{BB539C62-599F-457F-94B3-914355F24051}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.959","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26879,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105200110","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.166,21.631]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":959,"OGC_FID":959,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001052","districtbaladi":"10007828","duration":null,"elevation":null,"globalid":"{82AA312F-368A-418B-87A1-F1B659B06B2F}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.960","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26880,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105200111","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.173,21.6213]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":960,"OGC_FID":960,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001052","districtbaladi":"10007828","duration":null,"elevation":null,"globalid":"{4CB9A182-387F-43E3-83EB-2C2765623289}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.961","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26881,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105200112","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1551,21.6179]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":961,"OGC_FID":961,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001052","districtbaladi":"10007828","duration":null,"elevation":null,"globalid":"{17F7DE4A-08F8-42DC-AA7C-4ABB0D752F9E}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.962","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26882,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105200113","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1656,21.6159]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":962,"OGC_FID":962,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001052","districtbaladi":"10007828","duration":null,"elevation":null,"globalid":"{486BA0AD-2ADD-4856-AF85-CB270C10D644}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.963","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26883,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105200114","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1561,21.6141]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":963,"OGC_FID":963,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001052","districtbaladi":"10007828","duration":null,"elevation":null,"globalid":"{63F9DAF8-C2FA-4EF5-BCB7-C5E64BCA09E9}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.964","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26884,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105200115","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.171,21.6169]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":964,"OGC_FID":964,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001052","districtbaladi":"10007828","duration":null,"elevation":null,"globalid":"{7AE1C944-C396-4026-8C3B-D5490224174A}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.965","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26885,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105200116","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1597,21.6187]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":965,"OGC_FID":965,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001052","districtbaladi":"10007828","duration":null,"elevation":null,"globalid":"{FC10FFE7-5827-47C1-BF42-E919ED61A2CB}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.966","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26886,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105200117","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1668,21.6169]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":966,"OGC_FID":966,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001052","districtbaladi":"10007828","duration":null,"elevation":null,"globalid":"{A30810A5-454A-41F8-8E98-7BD5F93131A9}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.967","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26887,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105200118","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1838,21.6257]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":967,"OGC_FID":967,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001052","districtbaladi":"10007828","duration":null,"elevation":null,"globalid":"{700EDAE0-3741-400D-9021-A7AEDCAA269A}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.968","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26888,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105200119","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1578,21.6176]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":968,"OGC_FID":968,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001052","districtbaladi":"10007828","duration":null,"elevation":null,"globalid":"{C3FFB9C8-33D3-4E9C-9C77-36832FAC93A7}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.969","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26889,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105200120","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1585,21.6185]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":969,"OGC_FID":969,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001052","districtbaladi":"10007828","duration":null,"elevation":null,"globalid":"{DA9EA739-42A4-4329-A3A7-C255B7957A3A}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.970","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26890,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105200121","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1739,21.6292]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":970,"OGC_FID":970,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001052","districtbaladi":"10007828","duration":null,"elevation":null,"globalid":"{C9A39105-1B9A-459B-9DD3-7F38D35FF95B}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.971","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26891,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105200122","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.169,21.6233]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":971,"OGC_FID":971,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001052","districtbaladi":"10007828","duration":null,"elevation":null,"globalid":"{0D74C223-3F2C-46AC-AB92-D8F21E7F0DF4}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.972","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26892,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105200123","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1744,21.6276]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":972,"OGC_FID":972,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001052","districtbaladi":"10007828","duration":null,"elevation":null,"globalid":"{B56FEA15-25C3-41D6-A766-6CB2EB46FE41}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.973","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26893,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105200124","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1656,21.6198]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":973,"OGC_FID":973,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001052","districtbaladi":"10007828","duration":null,"elevation":null,"globalid":"{E6B4E6DA-8918-44FE-AAA7-8ED910C86DAD}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.974","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26894,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105200125","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1611,21.615]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":974,"OGC_FID":974,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001052","districtbaladi":"10007828","duration":null,"elevation":null,"globalid":"{6CAED8FD-C945-4DB3-9067-8F11C6491FA0}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.975","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26895,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105200126","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1685,21.6164]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":975,"OGC_FID":975,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001052","districtbaladi":"10007828","duration":null,"elevation":null,"globalid":"{C842D4D7-4B70-4117-9D5F-F72FB90F3DAF}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.976","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26896,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105200127","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1741,21.6284]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":976,"OGC_FID":976,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001052","districtbaladi":"10007828","duration":null,"elevation":null,"globalid":"{2ABE1CA9-69EF-4FC4-8E31-E4BC6FB3F0EC}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.977","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26897,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105200128","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1577,21.6144]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":977,"OGC_FID":977,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001052","districtbaladi":"10007828","duration":null,"elevation":null,"globalid":"{B624C507-6076-491E-BBB0-E368697FDB32}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.978","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26898,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105200129","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1709,21.6209]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":978,"OGC_FID":978,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001052","districtbaladi":"10007828","duration":null,"elevation":null,"globalid":"{E368B7A8-0505-4D32-801E-100410F01310}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.979","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26899,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105200130","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.175,21.6177]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":979,"OGC_FID":979,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001052","districtbaladi":"10007828","duration":null,"elevation":null,"globalid":"{5189FE16-69C7-4DE4-BD81-273B953E5B5B}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.980","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26900,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105200131","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.158,21.6168]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":980,"OGC_FID":980,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001052","districtbaladi":"10007828","duration":null,"elevation":null,"globalid":"{B2E0875E-AA46-415A-B582-04F2B0FF8900}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.981","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26901,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105200132","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1655,21.6199]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":981,"OGC_FID":981,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001052","districtbaladi":"10007828","duration":null,"elevation":null,"globalid":"{1B6780AD-E582-40B0-9274-22F2B0B75B5C}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.982","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26902,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105200133","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1544,21.6214]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":982,"OGC_FID":982,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001052","districtbaladi":"10007828","duration":null,"elevation":null,"globalid":"{B55E205F-9C87-4F3B-9617-1A9319043C02}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.983","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26903,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105200134","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1665,21.6175]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":983,"OGC_FID":983,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001052","districtbaladi":"10007828","duration":null,"elevation":null,"globalid":"{F6DCAFF6-D249-49E2-9CFA-7921517AD302}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.984","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26904,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105200135","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1545,21.6232]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":984,"OGC_FID":984,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001052","districtbaladi":"10007828","duration":null,"elevation":null,"globalid":"{ECFE5D1D-C23C-4459-8DB6-6E9FB6D52621}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.985","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26905,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105200136","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1753,21.6246]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":985,"OGC_FID":985,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001052","districtbaladi":"10007828","duration":null,"elevation":null,"globalid":"{C6388848-B58D-4A05-A5C8-ADCDEB8A6B06}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.986","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26906,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105200137","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1587,21.6302]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":986,"OGC_FID":986,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001052","districtbaladi":"10007828","duration":null,"elevation":null,"globalid":"{6D52D836-876D-4355-A1D7-3A894D43F15D}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.987","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26907,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105200138","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1836,21.6232]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":987,"OGC_FID":987,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001052","districtbaladi":"10007828","duration":null,"elevation":null,"globalid":"{316E416A-3A56-46AD-932F-D53C2B1483A5}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.988","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001010","objectid_1":26908,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105200139","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.157,21.6181]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":988,"OGC_FID":988,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{8716E85E-6A3E-46AC-89B6-1E279142F5D1}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.989","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26909,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600001","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1442,21.5694]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":989,"OGC_FID":989,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{691235B6-AC7D-4B83-8FCF-837C665DBDB8}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.990","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26910,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600002","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1666,21.5632]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":990,"OGC_FID":990,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{328B86AD-DD51-48CE-99C2-C528E7EC5B32}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.991","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26911,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600003","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1716,21.5618]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":991,"OGC_FID":991,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{A4AE388F-BB63-41AA-9F92-66A9DA9DEB5C}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.992","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26912,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600004","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1678,21.5635]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":992,"OGC_FID":992,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{0044865C-76A3-41A5-BA45-063F61FC9B08}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.993","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26913,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600005","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1697,21.5673]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":993,"OGC_FID":993,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{6E724068-AD69-43CB-8C55-171C2624DE99}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.994","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26914,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600006","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.153,21.5637]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":994,"OGC_FID":994,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{FC571F53-9EB2-4832-A308-3761FB9B89AC}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.995","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26915,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600007","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1689,21.5699]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":995,"OGC_FID":995,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{141048DD-46D2-458A-8DF4-9FBC89065053}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.996","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26916,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600008","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1625,21.5801]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":996,"OGC_FID":996,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{6A4B6D6B-F8D3-4D9F-9FB7-1288569126B9}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.997","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26917,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600009","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.171,21.5631]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":997,"OGC_FID":997,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{FF194553-25F8-4538-9CFE-A9CD94DCE1EA}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.998","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26918,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600010","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1664,21.5773]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":998,"OGC_FID":998,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{041BBE16-4189-43D7-9BCB-FAE1ADA99924}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.999","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26919,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600011","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1621,21.5717]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":999,"OGC_FID":999,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{828EE6FE-B95B-44D8-BEF8-B122D6F49A8C}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1000","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26920,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600012","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.149,21.5763]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1000,"OGC_FID":1000,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{E2476446-8327-47C8-8395-FC82F233A324}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1001","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26921,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600013","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1564,21.5732]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1001,"OGC_FID":1001,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{4D8B5781-3987-4C4D-901D-F2BC5E85A0B1}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1002","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26922,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600014","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1528,21.5722]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1002,"OGC_FID":1002,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{B0D9B97B-4D5F-4D82-909F-1D1558DAA3C4}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1003","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26923,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600015","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1453,21.5753]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1003,"OGC_FID":1003,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{6D697CAD-BFC0-4B35-B061-631B8311D984}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1004","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26924,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600016","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1671,21.5753]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1004,"OGC_FID":1004,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{86601749-7A80-4B61-BDD5-770594EDDB60}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1005","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26925,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600017","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.143,21.5666]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1005,"OGC_FID":1005,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{2320BA3F-1F1B-4834-A6F1-2103A17DA024}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1006","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26926,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600018","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.169,21.5642]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1006,"OGC_FID":1006,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{FD40E34A-0924-4023-B242-095AFE613DF2}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1007","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26927,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600019","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1473,21.5704]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1007,"OGC_FID":1007,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{86423312-B4B2-4222-BBE9-6F1E6A233F8B}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1008","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26928,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600020","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1724,21.5594]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1008,"OGC_FID":1008,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{3E6C63D0-96E4-4250-8B29-C15B8035BC72}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1009","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26929,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600021","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1548,21.578]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1009,"OGC_FID":1009,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{E430AE47-935C-4BFC-9027-A8CA3FE66F63}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1010","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26930,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600022","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1535,21.5724]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1010,"OGC_FID":1010,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{8F97001E-28C9-46ED-861E-EC31E34FAF00}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1011","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26931,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600023","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1555,21.5782]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1011,"OGC_FID":1011,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{04205CA3-1F1C-4B36-9168-9A063B294C6D}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1012","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26932,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600024","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.173,21.5577]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1012,"OGC_FID":1012,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{0CA8F6AC-B044-439A-AE0B-D80B93AFD244}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1013","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26933,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600025","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1586,21.5791]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1013,"OGC_FID":1013,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{E4397D72-E223-4296-A74D-C85066981372}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1014","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26934,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600026","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1693,21.5688]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1014,"OGC_FID":1014,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{9EDDC94D-53E4-4BBE-8841-FE2CACB3AAF9}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1015","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26935,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600027","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.148,21.5761]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1015,"OGC_FID":1015,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{5E9F342A-0B14-48B5-9AF8-C90F96255738}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1016","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26936,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600028","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1449,21.5721]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1016,"OGC_FID":1016,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{47F0ABC1-453A-4150-83F9-F4057E8F86D8}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1017","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26937,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600029","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1678,21.5731]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1017,"OGC_FID":1017,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{E2698FA4-8073-4D28-97A0-5AF67D1D101D}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1018","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26938,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600030","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1556,21.573]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1018,"OGC_FID":1018,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{10559910-BB6B-4591-B474-067C8FE366B9}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1019","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26939,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600031","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1595,21.5548]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1019,"OGC_FID":1019,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{FD108A34-75BF-4F6F-A433-159B23228B82}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1020","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26940,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600032","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1676,21.5638]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1020,"OGC_FID":1020,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{8CE4C26F-A807-4349-A0D6-F0F1A7D3F53B}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1021","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26941,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600033","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1591,21.5772]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1021,"OGC_FID":1021,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{1813DD5A-8E34-4409-99E0-B9B35A827AA2}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1022","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26942,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600034","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.168,21.5724]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1022,"OGC_FID":1022,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{878E447A-BD97-479F-A237-B8B7F819652B}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1023","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26943,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600035","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1514,21.5692]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1023,"OGC_FID":1023,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{472E9515-AF9E-4149-9435-8D8530CE0EC4}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1024","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26944,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600036","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1694,21.5643]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1024,"OGC_FID":1024,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{1229BC3E-2AEF-4FB8-89F1-956AF474D336}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1025","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26945,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600037","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1572,21.5734]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1025,"OGC_FID":1025,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{3F9E4B02-0A62-47C4-A8BE-F27AE5D6573F}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1026","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26946,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600038","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1453,21.5711]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1026,"OGC_FID":1026,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{481D2405-3B3F-42ED-99AB-E7DC44394164}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1027","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26947,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600039","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1602,21.5796]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1027,"OGC_FID":1027,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{33C5424C-A36A-436D-98BE-22868A3E8148}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1028","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26948,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600040","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1453,21.5744]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1028,"OGC_FID":1028,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{62F95E16-94FD-4725-9CF9-2AA45F14F0F6}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1029","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26949,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600041","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1587,21.575]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1029,"OGC_FID":1029,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{9026D5D9-3CD6-49B6-98BB-7D6004D54C31}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1030","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26950,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600042","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1723,21.5599]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1030,"OGC_FID":1030,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{AB6ADACD-51C3-4362-9FDF-D4AC444E4C8E}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1031","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26951,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600043","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1698,21.5668]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1031,"OGC_FID":1031,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{6530B29F-93E6-46E8-A63B-B84FF83D91F9}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1032","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26952,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600044","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1594,21.555]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1032,"OGC_FID":1032,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{9687921A-CA64-452E-B683-B21763AF7046}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1033","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26953,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600045","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1479,21.5663]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1033,"OGC_FID":1033,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{492A9628-3DAA-4B2D-9269-821E4E2250E0}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1034","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26954,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600046","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1581,21.5731]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1034,"OGC_FID":1034,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{0261280C-44DF-4786-9321-6C6A9900C6BB}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1035","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26955,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600047","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1597,21.5752]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1035,"OGC_FID":1035,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{90CBFEE5-29C7-4E1E-92F5-8F702F93C442}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1036","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26956,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600048","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1492,21.5696]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1036,"OGC_FID":1036,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{C5C3BAF3-CD7D-4175-9ABD-81224DAD0187}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1037","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26957,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600049","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1565,21.5781]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1037,"OGC_FID":1037,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{F7A393D0-F287-44D3-A2F8-7EB63B1C6C3E}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1038","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26958,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600050","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1524,21.5735]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1038,"OGC_FID":1038,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{1449A465-0499-46E2-9BDA-F028E17E4DE3}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1039","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26959,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600051","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1712,21.5627]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1039,"OGC_FID":1039,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{20D4B20D-4112-42BE-88E8-AEF4180BDDCA}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1040","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26960,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600052","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1608,21.5576]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1040,"OGC_FID":1040,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{77D56253-A784-4ADD-8F99-42451CBA47FB}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1041","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26961,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600053","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1483,21.572]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1041,"OGC_FID":1041,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{D2E2C4D5-D1A7-465B-9643-196F876817A7}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1042","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26962,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600054","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1463,21.5746]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1042,"OGC_FID":1042,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{44E5E94B-23B0-406B-9DB7-0DE85D82DFED}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1043","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26963,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600055","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1488,21.5709]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1043,"OGC_FID":1043,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{5B3011D7-2AA8-4BD2-B61D-611CE21CD64F}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1044","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26964,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600056","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1608,21.5723]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1044,"OGC_FID":1044,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{6D1234D8-6E76-4517-999F-E288A147067E}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1045","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26965,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600057","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1433,21.5717]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1045,"OGC_FID":1045,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{4AD47D7F-A8F3-4B04-9DE4-A85F150D17A8}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1046","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26966,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600058","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1611,21.5778]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1046,"OGC_FID":1046,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{6B6DFD9A-681B-43A7-9780-B53CD149D94A}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1047","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26967,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600059","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1583,21.5727]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1047,"OGC_FID":1047,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{EFF40A97-65DF-4C38-819E-EC053BD1AFC9}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1048","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26968,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600060","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1589,21.5745]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1048,"OGC_FID":1048,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{37DD9C9F-21F6-44CF-A1C5-22874794AA97}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1049","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26969,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600061","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1538,21.5725]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1049,"OGC_FID":1049,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{9828660A-5CE4-4538-8075-A4E302EA0087}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1050","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26970,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600062","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1463,21.5715]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1050,"OGC_FID":1050,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{F25E952D-1F55-442E-B132-7DA0FA90E350}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1051","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26971,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600063","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1571,21.5787]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1051,"OGC_FID":1051,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{A72045B7-2AEB-4D1A-8712-A27DBF604E17}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1052","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26972,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600064","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1668,21.5762]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1052,"OGC_FID":1052,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{FD1FFCE9-7CF4-482E-80DA-25AE3A33D670}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1053","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26973,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600065","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1701,21.5642]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1053,"OGC_FID":1053,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{B652FBE3-6C63-45C4-88A6-4093DEBD71E5}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1054","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26974,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600066","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.146,21.5724]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1054,"OGC_FID":1054,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{14EE1590-F473-4CC7-B2B6-0DB48E344A00}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1055","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26975,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600067","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1677,21.5736]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1055,"OGC_FID":1055,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{C5596B35-B296-4385-B926-FE39E2DE426B}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1056","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26976,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600068","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1616,21.573]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1056,"OGC_FID":1056,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{BE46FC32-60A3-445E-A024-B14A2AF5D4D5}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1057","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26977,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600069","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1623,21.5712]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1057,"OGC_FID":1057,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{888008FF-623F-4230-B283-2EEED2E63468}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1058","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26978,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600070","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1691,21.5693]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1058,"OGC_FID":1058,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{8BC748A6-0A93-42DD-8516-DC6DA9987BBB}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1059","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26979,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600071","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1725,21.5589]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1059,"OGC_FID":1059,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{1B21C2EE-5FEA-473E-A864-98603498FE3C}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1060","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26980,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600072","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1511,21.5681]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1060,"OGC_FID":1060,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{1B91C74B-5A15-4098-91C3-6E49DD8727E1}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1061","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26981,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600073","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1432,21.5717]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1061,"OGC_FID":1061,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{4174B5B8-A542-4974-B99C-5E8D9F1C3378}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1062","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26982,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600074","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1509,21.5686]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1062,"OGC_FID":1062,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{0A33030B-8CD5-4AB3-B1AC-CAFE730985A0}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1063","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26983,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600075","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1731,21.5574]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1063,"OGC_FID":1063,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{CD3C4704-F2BB-40F4-9F77-F307CC5E7C86}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1064","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26984,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600076","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1532,21.5775]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1064,"OGC_FID":1064,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{3CCD6ECC-B640-4E9C-9FE4-262A53B7AD94}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1065","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26985,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600077","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1634,21.5803]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1065,"OGC_FID":1065,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{47B0B4E4-A5AC-4D40-B9BB-634B161E3830}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1066","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26986,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600078","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1671,21.5634]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1066,"OGC_FID":1066,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{D83CDAC9-8F11-4A41-B44E-C46E4A4686E9}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1067","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26987,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600079","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1571,21.5766]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1067,"OGC_FID":1067,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{1DAE892D-65D5-4852-970B-0F909243F778}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1068","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26988,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600080","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.17,21.5662]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1068,"OGC_FID":1068,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{DC6B5BD3-7C2A-4C39-BCF9-F13326591E2F}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1069","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26989,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600081","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1517,21.5683]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1069,"OGC_FID":1069,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{91700505-8440-484D-8867-6846CBFE10F4}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1070","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26990,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600082","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1531,21.566]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1070,"OGC_FID":1070,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{4A4C7A19-1D00-4324-9285-A917A3EE129B}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1071","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26991,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600083","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1448,21.5751]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1071,"OGC_FID":1071,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{5CCE171F-0A1E-4DBA-A79D-CDC55A4AA21C}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1072","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26992,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600084","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1494,21.5662]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1072,"OGC_FID":1072,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{630856A0-1BBE-4932-AC4D-BEA80C07CECF}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1073","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26993,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600085","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1643,21.5806]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1073,"OGC_FID":1073,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{96658653-9CE2-4610-816B-0569B5044861}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1074","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26994,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600086","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1503,21.5686]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1074,"OGC_FID":1074,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{6DB83B96-3805-4540-98E0-6B88E42D4E61}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1075","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26995,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600087","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1718,21.5612]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1075,"OGC_FID":1075,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{6A5BA908-7C83-4B55-AEEB-3E8393263E66}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1076","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26996,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600088","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.145,21.5664]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1076,"OGC_FID":1076,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{2538023B-4A77-4E49-8918-E977A18CE132}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1077","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26997,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600089","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1522,21.5773]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1077,"OGC_FID":1077,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{52D9B6AC-8302-44C6-AD96-448CE3A7C923}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1078","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26998,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600090","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1665,21.5634]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1078,"OGC_FID":1078,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{167AF55F-ACDF-40AD-B3E3-A5D477FEF9F0}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1079","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":26999,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600091","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1456,21.57]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1079,"OGC_FID":1079,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{2D611613-554F-4844-87F8-329D6D051783}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1080","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27000,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600092","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1504,21.5701]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1080,"OGC_FID":1080,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{FA949357-CC58-49FF-B882-69116CAD4B90}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1081","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27001,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600093","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1496,21.5684]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1081,"OGC_FID":1081,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{A5076976-5EDA-43CA-972B-F0E1BA82CF72}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1082","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27002,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600094","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1611,21.5714]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1082,"OGC_FID":1082,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{EBBCF6AE-071E-4616-BFCF-3666E0DB4866}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1083","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27003,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600095","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1715,21.5623]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1083,"OGC_FID":1083,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{51F11E2A-7144-42BF-B355-678DF05FAC41}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1084","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27004,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600096","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1433,21.5665]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1084,"OGC_FID":1084,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{D0E7C258-4B17-4BA5-A732-52F5DA9C3EED}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1085","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27005,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600097","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1628,21.5802]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1085,"OGC_FID":1085,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{B34B953E-1474-4380-B7A4-EA773E232AEA}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1086","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27006,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600098","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1655,21.5802]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1086,"OGC_FID":1086,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{558539B1-C8D2-4012-B9BD-2F0C8E951AEF}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1087","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27007,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600099","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1733,21.5568]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1087,"OGC_FID":1087,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{D13A2721-BC6D-4812-9E68-08EBD46C763B}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1088","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27008,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600100","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1593,21.5553]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1088,"OGC_FID":1088,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{BAB121D9-AA71-407D-BB33-539AAEBCCE5D}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1089","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27009,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600101","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.159,21.574]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1089,"OGC_FID":1089,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{0BFF5481-42B7-48E3-9F63-71371AE6332C}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1090","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27010,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600102","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1697,21.5644]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1090,"OGC_FID":1090,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{826B024C-318C-458D-9524-EF18AF86FCF8}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1091","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27011,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600103","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1595,21.5794]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1091,"OGC_FID":1091,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{FA54C46B-58E5-4302-B2B6-7E9C7CBC1848}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1092","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27012,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600104","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1586,21.5717]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1092,"OGC_FID":1092,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{B0B10D82-956A-4B23-A720-B48F3A74C5D6}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1093","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27013,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600105","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1666,21.5767]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1093,"OGC_FID":1093,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{A8DC2822-2AEF-4825-9A0D-EBACDE0B941B}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1094","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27014,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600106","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1471,21.5758]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1094,"OGC_FID":1094,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{A8407682-B8CF-4362-B7C6-A268EE02DCC5}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1095","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27015,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600107","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1665,21.5771]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1095,"OGC_FID":1095,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{83EFC59D-5883-42FD-8C33-F41F00D1A30E}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1096","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27016,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600108","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1528,21.5604]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1096,"OGC_FID":1096,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{67EB4D93-1A2E-4124-BA21-3AF784C2C401}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1097","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27017,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600109","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1481,21.5707]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1097,"OGC_FID":1097,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{420D53D3-E469-417E-91AE-CA8E28D57849}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1098","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27018,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600110","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1576,21.5746]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1098,"OGC_FID":1098,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{FE991085-D9E9-463A-8FE4-5282AB7424B6}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1099","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27019,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600111","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1682,21.5719]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1099,"OGC_FID":1099,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{9A757B2B-9874-4E23-B512-8ADE897F9385}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1100","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27020,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600112","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1569,21.5767]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1100,"OGC_FID":1100,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{F45C6760-FE37-4BF8-9F80-A1E2B8F36761}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1101","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27021,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600113","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.166,21.5784]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1101,"OGC_FID":1101,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{5BF8F8FD-AF8C-43ED-A923-81D490DD0E30}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1102","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27022,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600114","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1491,21.571]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1102,"OGC_FID":1102,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{F9FDAC36-2AA3-4C58-BB1E-6FD8A2C5EFCA}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1103","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27023,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600115","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.162,21.5722]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1103,"OGC_FID":1103,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{8B8915FA-7EDD-462F-B48D-C687FDB8206A}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1104","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27024,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600116","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.145,21.5751]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1104,"OGC_FID":1104,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{A9909EFC-5420-4E9E-A9DE-058CCDDF9884}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1105","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27025,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600117","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1694,21.5683]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1105,"OGC_FID":1105,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{67891AAD-7FA9-4248-A3A8-B99E189C0FBB}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1106","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27026,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600118","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1693,21.5639]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1106,"OGC_FID":1106,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{AB3F3CA2-93EE-46D9-A9DB-2AD8A0B9B465}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1107","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27027,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600119","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1465,21.5756]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1107,"OGC_FID":1107,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{FA3CD847-0BA8-48B2-99A1-54A952736AA0}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1108","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27028,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600120","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1686,21.5709]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1108,"OGC_FID":1108,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{959BB9B2-92B8-4D3A-8086-1434F0E9A6A6}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1109","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27029,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600121","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1584,21.5759]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1109,"OGC_FID":1109,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{AFEF2440-EA2F-4B23-BF30-DF13AD4B2618}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1110","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27030,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600122","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1589,21.578]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1110,"OGC_FID":1110,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{711507B8-114A-4BA0-BC8F-45E9F9FD82E0}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1111","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27031,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600123","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1609,21.5798]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1111,"OGC_FID":1111,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{B9C9ABC6-672A-4C96-ABEA-09D51D09742B}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1112","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27032,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600124","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1675,21.574]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1112,"OGC_FID":1112,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{83E31FD0-1D21-498D-9F00-FA989A551AEB}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1113","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27033,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600125","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1587,21.5787]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1113,"OGC_FID":1113,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{42FD587B-A082-4064-8A48-8BE1D64C8882}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1114","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27034,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600126","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.153,21.5628]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1114,"OGC_FID":1114,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{7856FEDE-FEDE-4ACD-83BD-28F1D0F4BE3E}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1115","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27035,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600127","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1588,21.5783]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1115,"OGC_FID":1115,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{FA475666-229F-43B4-90D8-3FCBECC430EA}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1116","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27036,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600128","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1509,21.5688]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1116,"OGC_FID":1116,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{B7C496C5-D6B4-4B80-A3F9-EA3F4DD9300D}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1117","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27037,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600129","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1529,21.5615]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1117,"OGC_FID":1117,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{E8D65132-112B-4FAC-A7C3-AE04C71F3A0C}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1118","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27038,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600130","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1507,21.5715]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1118,"OGC_FID":1118,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{FF0ECF25-C43B-4F6A-A03D-51237FDA3A37}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1119","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27039,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600131","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1498,21.5699]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1119,"OGC_FID":1119,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"SAFA GENERAL CONTRACTOR","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1369861200000,"dateofendcontract":1328302800000,"dateofstart":1318194000000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{47B6164A-D1C3-49B6-8E8D-FBBA5E05F0BD}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1120","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27040,"projectbudget":null,"projectcentroid_id":"B4-10392","projectcentroid_unified_id":"00200105600132","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":1,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.165,21.5808]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1120,"OGC_FID":1120,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{6819672C-B46C-47D8-A90D-E7EEDD6930A0}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1121","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27041,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600133","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1728,21.5581]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1121,"OGC_FID":1121,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{7584317E-C203-4F62-A5E0-B319A87837AA}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1122","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27042,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600134","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1732,21.5571]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1122,"OGC_FID":1122,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{EA4D7F87-D0AE-4E8E-AF72-396709599BCE}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1123","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27043,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600135","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1474,21.5749]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1123,"OGC_FID":1123,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"SAFA GENERAL CONTRACTOR","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1369861200000,"dateofendcontract":1328302800000,"dateofstart":1318194000000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{665D7277-CB3E-491C-93C2-78EAC3C2D4C4}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1124","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27044,"projectbudget":null,"projectcentroid_id":"B4-10392","projectcentroid_unified_id":"00200105600136","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":1,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1643,21.5806]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1124,"OGC_FID":1124,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"SAFA GENERAL CONTRACTOR","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1369861200000,"dateofendcontract":1328302800000,"dateofstart":1318194000000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{8F72CE70-ECA5-4EAC-92AE-8565DDC7C911}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1125","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27045,"projectbudget":null,"projectcentroid_id":"B4-10392","projectcentroid_unified_id":"00200105600137","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":1,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1637,21.5804]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1125,"OGC_FID":1125,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{1CB50ED5-D890-40B3-9127-B45ED5E761FF}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1126","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27046,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600138","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1528,21.5595]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1126,"OGC_FID":1126,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{92443746-8D09-4690-A8FF-7BE30335B522}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1127","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27047,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600139","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1466,21.5737]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1127,"OGC_FID":1127,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"SAFA GENERAL CONTRACTOR","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1369861200000,"dateofendcontract":1328302800000,"dateofstart":1318194000000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{A5ACF72D-C85F-4ADF-A653-BB37455719C7}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1128","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27048,"projectbudget":null,"projectcentroid_id":"B4-10392","projectcentroid_unified_id":"00200105600140","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":1,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1627,21.5801]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1128,"OGC_FID":1128,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{EF29639C-8857-45CB-BE8F-880974B42FF9}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1129","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27049,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600141","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1525,21.5523]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1129,"OGC_FID":1129,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"SAFA GENERAL CONTRACTOR","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1369861200000,"dateofendcontract":1328302800000,"dateofstart":1318194000000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{E0166BF7-4744-4927-BC33-9A8A66F4366D}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1130","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27050,"projectbudget":null,"projectcentroid_id":"B4-10392","projectcentroid_unified_id":"00200105600142","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":1,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1619,21.5799]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1130,"OGC_FID":1130,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{070DD88E-CD1F-4508-9611-A863E197E815}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1131","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27051,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600143","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1585,21.5721]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1131,"OGC_FID":1131,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{40E9ED5D-E361-4299-B9B7-9ABE4352DF86}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1132","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27052,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600144","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1594,21.5551]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1132,"OGC_FID":1132,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{33BE5411-DA8B-4B06-82F1-10AC23CEFBEC}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1133","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27053,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600145","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1681,21.5636]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1133,"OGC_FID":1133,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{ECBA9EEB-0A55-4130-8FF3-FE9FF90011C0}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1134","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27054,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600146","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1486,21.5759]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1134,"OGC_FID":1134,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{E0BF16BA-510D-4149-BB55-D872786F8148}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1135","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27055,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600147","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1686,21.564]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1135,"OGC_FID":1135,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{44A7AD0C-0382-4908-9ADD-B115C096BD1E}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1136","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27056,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600148","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1606,21.5728]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1136,"OGC_FID":1136,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{C10EF338-D9FF-4FFE-8709-FB32CF261EDF}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1137","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27057,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600149","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1631,21.5719]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1137,"OGC_FID":1137,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{1B922D39-77D8-44A0-8019-DA604237588D}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1138","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27058,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600150","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1615,21.5556]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1138,"OGC_FID":1138,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{3B8DAF6A-4589-4E98-8345-C19106C9F20D}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1139","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27059,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600151","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1589,21.5571]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1139,"OGC_FID":1139,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{C4DD16BC-BB4D-4A61-A6FA-B91B01892D90}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1140","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27060,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600152","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1602,21.557]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1140,"OGC_FID":1140,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{7BA3FEFC-9071-4763-8D89-75DBF0A29504}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1141","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27061,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600153","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1465,21.5702]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1141,"OGC_FID":1141,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{23D82F34-9BE4-422A-96A4-DC9D03D30B82}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1142","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27062,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600154","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1616,21.5553]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1142,"OGC_FID":1142,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{CEBFA2B7-E57C-4E66-8849-C05C93FEA369}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1143","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27063,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600155","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1698,21.5641]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1143,"OGC_FID":1143,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{52C1EEA6-D824-450E-873D-1DDBA3ABD882}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1144","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27064,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600156","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1513,21.577]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1144,"OGC_FID":1144,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{54CBC441-CC4E-4F7E-96DE-51D5713276AE}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1145","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27065,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600157","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1658,21.5789]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1145,"OGC_FID":1145,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{CE72ED3A-C024-4408-AC82-C0EAD4088B3E}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1146","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27066,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600158","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1578,21.5741]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1146,"OGC_FID":1146,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{67EFA87C-1F86-4893-9146-A292AAC4CBB0}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1147","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27067,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600159","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.15,21.5671]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1147,"OGC_FID":1147,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{B42871A9-AD7A-4074-A455-D0E6B3A4E14F}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1148","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27068,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600160","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1516,21.5687]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1148,"OGC_FID":1148,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{1D621AA9-1F2F-4C32-92DF-2CD25586E316}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1149","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27069,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600161","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1579,21.5737]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1149,"OGC_FID":1149,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{7E514831-33C3-4B11-99BF-D32544FC3233}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1150","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27070,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600162","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1518,21.5752]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1150,"OGC_FID":1150,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{7CC4C2BC-34A1-4ED9-A358-6B1B3CB2CA20}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1151","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27071,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600163","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1662,21.5779]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1151,"OGC_FID":1151,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{461004FE-2959-439C-90F0-2CC589C6C6F5}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1152","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27072,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600164","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1687,21.5704]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1152,"OGC_FID":1152,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{8C3E7768-0733-4F73-AA54-CBE80F50640E}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1153","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27073,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600165","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1688,21.5638]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1153,"OGC_FID":1153,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{50FF62AC-ED70-4808-85A9-84E227368348}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1154","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27074,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600166","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.168,21.5727]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1154,"OGC_FID":1154,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"SAFA GENERAL CONTRACTOR","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1369861200000,"dateofendcontract":1328302800000,"dateofstart":1318194000000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{6035782F-85CB-40CE-B920-B84197EFEB11}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1155","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27075,"projectbudget":null,"projectcentroid_id":"B4-10392","projectcentroid_unified_id":"00200105600167","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":1,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1653,21.5808]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1155,"OGC_FID":1155,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{3B892D2B-ACDD-4FEB-A39A-10B66891DAAA}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1156","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27076,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600168","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1477,21.574]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1156,"OGC_FID":1156,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{9045AF88-16FD-4017-96BA-F05C96C75285}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1157","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27077,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600169","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1601,21.5775]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1157,"OGC_FID":1157,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{0E259EB6-7181-46E0-B82F-14CAB334569F}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1158","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27078,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600170","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1702,21.5657]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1158,"OGC_FID":1158,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{B5F482B7-6B64-4024-B06E-D6516253E67C}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1159","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27079,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600171","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1671,21.5636]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1159,"OGC_FID":1159,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{5FA18C8E-D172-4CD6-BB5D-26083D2E75BC}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1160","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27080,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600172","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1684,21.5714]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1160,"OGC_FID":1160,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{A5722386-8B94-4BD3-91DD-5408498F5191}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1161","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27081,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600173","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1605,21.5732]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1161,"OGC_FID":1161,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{D80C6EE2-4ECA-4B0E-BB0C-773ABBDAC14E}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1162","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27082,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600174","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1673,21.5747]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1162,"OGC_FID":1162,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{14F9475F-9900-462B-98E9-437B10C9EC4F}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1163","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27083,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600175","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1612,21.5566]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1163,"OGC_FID":1163,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{D4CE68B8-3F8A-4E44-9570-F15C0204EE42}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1164","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27084,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600176","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1614,21.5769]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1164,"OGC_FID":1164,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{F7B6CAB8-5F78-460D-A26B-2ECC8A6A45BE}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1165","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27085,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600177","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1508,21.5662]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1165,"OGC_FID":1165,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{7E2BAA49-4966-4BBE-AE82-C45F5F8E2FB0}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1166","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27086,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600178","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.168,21.5639]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1166,"OGC_FID":1166,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{0336A1AA-84A6-47AF-AE21-3308C6E4A636}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1167","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27087,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600179","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1512,21.5767]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1167,"OGC_FID":1167,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{342BA817-D750-4A0A-A348-CD7C3154488A}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1168","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27088,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600180","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1514,21.5761]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1168,"OGC_FID":1168,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{AC92C025-9328-42D4-863E-C6389A5A54CB}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1169","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27089,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600181","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1487,21.571]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1169,"OGC_FID":1169,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{DEB279C7-531D-4363-9E24-D33494E4EF48}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1170","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27090,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600182","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1736,21.556]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1170,"OGC_FID":1170,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{A4F73199-9614-4E5F-B162-9F6091587C72}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1171","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27091,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600183","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1526,21.5728]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1171,"OGC_FID":1171,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{7DB46146-72F2-4847-AE92-A93F1014FE20}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1172","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27092,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600184","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1696,21.5678]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1172,"OGC_FID":1172,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{06E78786-CBDA-463A-A379-39812DB3458F}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1173","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27093,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600185","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.153,21.5647]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1173,"OGC_FID":1173,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{CCA4B2EF-F738-4D9D-B160-DA99EBE99821}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1174","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27094,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600186","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1499,21.5766]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1174,"OGC_FID":1174,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{7F413C45-826B-4AB3-AF59-270473E4342D}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1175","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27095,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600187","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.16,21.5743]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1175,"OGC_FID":1175,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{41927CC7-E597-42F2-A86C-50D7D8416C9E}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1176","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27096,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600188","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1573,21.5756]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1176,"OGC_FID":1176,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{8ACA4AA2-B79B-4EA2-BC9E-59D268778662}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1177","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27097,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600189","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.154,21.5778]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1177,"OGC_FID":1177,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{4DF375E3-EACB-4B7E-90F0-F32F6B4BA177}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1178","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27098,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600190","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1464,21.5663]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1178,"OGC_FID":1178,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{61BCCA33-465D-464E-9396-B669AD0284FA}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1179","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27099,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600191","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1619,21.5799]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1179,"OGC_FID":1179,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{30C5E4A8-3FD2-46B7-8E05-23AE295A2DF8}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1180","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27100,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600192","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1613,21.5773]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1180,"OGC_FID":1180,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{1DB8ED70-4C33-4B4A-BFC3-99DB136B01B0}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1181","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27101,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600193","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1626,21.5718]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1181,"OGC_FID":1181,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{DB2FFCA7-F60E-4345-8420-9AD2DC0E18E3}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1182","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27102,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600194","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1441,21.5719]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1182,"OGC_FID":1182,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{80AD5B08-69D0-4183-AABA-D44010D3DDD3}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1183","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27103,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600195","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.172,21.5605]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1183,"OGC_FID":1183,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{211B452D-5893-45B5-8A26-0FF375246645}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1184","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27104,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600196","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1581,21.5769]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1184,"OGC_FID":1184,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{97BBE824-1286-4AD0-BA77-5959A79347F2}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1185","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27105,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600197","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1579,21.5789]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1185,"OGC_FID":1185,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{757E4A84-8237-4587-B0CE-F50584C957FA}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1186","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27106,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600198","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.15,21.5713]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1186,"OGC_FID":1186,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{D7C73FFE-9BED-4C40-A5DD-9E952379C99A}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1187","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27107,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600199","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1521,21.5742]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1187,"OGC_FID":1187,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{45AEC377-A655-4D8E-B753-FD76754E9940}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1188","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27108,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600200","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1439,21.5749]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1188,"OGC_FID":1188,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{314A2D42-914D-41C9-9256-D16E7A6AB2F1}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1189","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27109,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600201","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1567,21.5777]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1189,"OGC_FID":1189,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{AAF0B158-8542-464A-882F-7DFD7AB75915}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1190","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27110,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600202","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1598,21.5573]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1190,"OGC_FID":1190,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{B3E3B85A-6221-4F7A-B08B-67783A9311CD}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1191","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27111,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600203","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.146,21.5755]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1191,"OGC_FID":1191,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{DC3EF024-8807-4FD0-8675-A258C0B82E0F}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1192","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27112,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600204","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1529,21.5661]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1192,"OGC_FID":1192,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{B7BDCE5B-FB6F-425F-BEF2-EAEEA8BD7D28}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1193","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27113,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600205","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1721,21.5602]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1193,"OGC_FID":1193,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{2895111C-F9B0-4430-9E91-ABA922D04D8D}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1194","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27114,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600206","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1613,21.556]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1194,"OGC_FID":1194,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{4695F339-D642-4EC5-9EB0-DA5CB5CFBBBA}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1195","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27115,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600207","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1653,21.5808]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1195,"OGC_FID":1195,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{39055BD3-131E-479B-BA9E-D21929B7EA0F}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1196","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27116,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600208","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1472,21.5758]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1196,"OGC_FID":1196,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{BE93CE58-B63C-45A7-A1E6-09C4DBD38386}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1197","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27117,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600209","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1618,21.5726]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1197,"OGC_FID":1197,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{D33FD559-7DA5-4CB7-A008-1DFB3B6D7B29}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1198","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27118,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600210","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1735,21.5562]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1198,"OGC_FID":1198,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{884E09F4-66FD-46E7-97AD-4847CF1CA637}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1199","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27119,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600211","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1432,21.5692]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1199,"OGC_FID":1199,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{3A65B476-D24F-46BD-B543-04F89E963BDE}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1200","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27120,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600212","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1446,21.5695]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1200,"OGC_FID":1200,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{77279212-2810-4B14-9244-DA7F2EE8AB84}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1201","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27121,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600213","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.145,21.5698]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1201,"OGC_FID":1201,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001056","districtbaladi":"10007793","duration":null,"elevation":null,"globalid":"{A5BEEA12-E367-4F05-850C-E2DDDBA68EA8}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1202","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27122,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200105600214","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1549,21.5728]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1202,"OGC_FID":1202,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{1FA63BAC-ADC2-43D2-BE37-AFE8871A1409}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1203","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27123,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400001","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1603,21.5924]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1203,"OGC_FID":1203,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{AE62068E-0B17-4DD9-917F-BCF5266FD509}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1204","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27124,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400002","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1464,21.5812]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1204,"OGC_FID":1204,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{4C456491-99B2-4EC6-B792-C605345FD4DF}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1205","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27125,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400003","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1543,21.5833]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1205,"OGC_FID":1205,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{49BA852D-F5A8-4226-9CA3-DBEB90DBC215}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1206","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27126,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400004","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1458,21.6007]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1206,"OGC_FID":1206,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{EF4FA77A-EB45-4EC7-B123-94B5A47C8091}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1207","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27127,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400005","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1464,21.5912]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1207,"OGC_FID":1207,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{3FF27473-A0ED-49F0-8478-DB2BBCA6D238}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1208","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27128,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400006","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1584,21.5965]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1208,"OGC_FID":1208,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{B5F3C51B-01AA-4AEB-9CEC-5CAD843484A1}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1209","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27129,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400007","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1457,21.6023]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1209,"OGC_FID":1209,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{B3115DD0-7BDC-4AFC-AD80-9A9858E6C34B}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1210","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27130,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400008","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1558,21.594]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1210,"OGC_FID":1210,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{AF5D5670-166A-46A7-9AAB-D72AD8CA774A}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1211","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27131,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400009","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1495,21.6126]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1211,"OGC_FID":1211,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{24FFAAFA-55A7-483C-A4AD-122D8A3CFD89}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1212","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27132,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400010","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1516,21.5826]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1212,"OGC_FID":1212,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"SAFA GENERAL CONTRACTOR","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1369861200000,"dateofendcontract":1328302800000,"dateofstart":1318194000000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{0E5FF970-A3A3-4498-AC64-B095F06140E6}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1213","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27133,"projectbudget":null,"projectcentroid_id":"B4-10392","projectcentroid_unified_id":"00200106400011","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":1,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1626,21.5804]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1213,"OGC_FID":1213,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{F81F705E-A5E6-47DC-8C83-256C410517CD}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1214","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27134,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400012","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1467,21.5838]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1214,"OGC_FID":1214,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{1F0FCF30-4025-4D21-B292-5FD3545A7FB5}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1215","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27135,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400013","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1499,21.582]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1215,"OGC_FID":1215,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{DF51FA8B-A9D7-4E3A-B5EB-8F26C5E65C45}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1216","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27136,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400014","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1458,21.6042]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1216,"OGC_FID":1216,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{2D448F99-BF6E-4199-9703-B91E54385759}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1217","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27137,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400015","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1616,21.5919]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1217,"OGC_FID":1217,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{DF4140CA-A1BC-48E7-92F2-60E41356ABD7}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1218","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27138,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400016","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1611,21.5934]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1218,"OGC_FID":1218,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{F5128125-6EFD-42E3-94E0-635543A14332}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1219","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27139,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400017","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1535,21.5778]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1219,"OGC_FID":1219,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{BF179C98-4AE0-42F2-B145-B2200B0ABD17}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1220","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27140,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400018","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1416,21.6092]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1220,"OGC_FID":1220,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"SAFA GENERAL CONTRACTOR","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1369861200000,"dateofendcontract":1328302800000,"dateofstart":1318194000000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{6CD0EB2F-7D52-41F7-8867-FB9F6F2837A3}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1221","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27141,"projectbudget":null,"projectcentroid_id":"B4-10392","projectcentroid_unified_id":"00200106400019","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":1,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1642,21.5808]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1221,"OGC_FID":1221,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{5B19EB56-6115-4183-A8C2-7280FB0E2B6D}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1222","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27142,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400020","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1441,21.5948]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1222,"OGC_FID":1222,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{DE3913A9-8688-4BC6-B438-32E571B95A5D}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1223","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27143,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400021","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1454,21.5978]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1223,"OGC_FID":1223,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{7BFA5D9A-4F18-44F0-9688-E2AFF7817BED}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1224","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27144,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400022","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1563,21.5949]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1224,"OGC_FID":1224,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{1814AA25-35FB-44B9-88E9-56E6E038F6C0}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1225","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27145,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400023","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1416,21.6105]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1225,"OGC_FID":1225,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{534083C1-5ACF-45F0-B01B-AF5FA5242C93}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1226","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27146,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400024","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1545,21.6001]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1226,"OGC_FID":1226,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{EEDED237-C1CE-4917-9F42-FBF3AFF9AB5F}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1227","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27147,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400025","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1457,21.6013]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1227,"OGC_FID":1227,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{4204860C-AB2C-42FE-A8A8-04C42B5091FD}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1228","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27148,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400026","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1482,21.5826]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1228,"OGC_FID":1228,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{FADD87B1-CCA5-4B42-B2B1-DEA0CE06700A}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1229","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27149,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400027","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1503,21.5989]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1229,"OGC_FID":1229,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{AF7941E2-EFE5-4465-A023-C4E302E37023}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1230","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27150,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400028","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1652,21.581]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1230,"OGC_FID":1230,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{E15B0A13-80FC-475B-A214-73FF438AC186}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1231","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27151,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400029","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1489,21.5985]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1231,"OGC_FID":1231,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{43E27B07-BE8C-49B2-B525-070575C32BB9}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1232","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27152,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400030","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.159,21.5995]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1232,"OGC_FID":1232,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"SAFA GENERAL CONTRACTOR","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1369861200000,"dateofendcontract":1328302800000,"dateofstart":1318194000000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{CF1B0F1A-86B5-4D66-9172-E31C2D5DEE15}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1233","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27153,"projectbudget":null,"projectcentroid_id":"B4-10392","projectcentroid_unified_id":"00200106400031","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":1,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1648,21.581]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1233,"OGC_FID":1233,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{DAE800C5-142B-4309-95A0-E5CB1A886A57}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1234","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27154,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400032","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1581,21.5938]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1234,"OGC_FID":1234,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{577B7190-7436-47F1-9251-2A49A2D09E5E}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1235","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27155,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400033","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1454,21.5809]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1235,"OGC_FID":1235,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{DE14DFF5-F84C-4995-AF45-3E1F2AA49D66}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1236","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27156,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400034","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1519,21.5994]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1236,"OGC_FID":1236,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{4B596180-5CCD-412D-BD52-D712ACFAFE86}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1237","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27157,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400035","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1545,21.6001]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1237,"OGC_FID":1237,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"SAFA GENERAL CONTRACTOR","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1369861200000,"dateofendcontract":1328302800000,"dateofstart":1318194000000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{ABD07991-D1CC-4879-8DF9-D32AD9908535}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1238","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27158,"projectbudget":null,"projectcentroid_id":"B4-10392","projectcentroid_unified_id":"00200106400036","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":1,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1649,21.5819]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1238,"OGC_FID":1238,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{E19BB20B-4690-4A88-B428-0407DD039652}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1239","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27159,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400037","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.158,21.587]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1239,"OGC_FID":1239,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{13B5322B-1CB5-4C0F-A59F-6EBF82315976}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1240","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27160,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400038","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1519,21.5994]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1240,"OGC_FID":1240,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{FD066B41-3C09-4E51-A1FD-1FEF6B581FA7}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1241","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27161,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400039","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1499,21.5823]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1241,"OGC_FID":1241,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{73392B86-690C-4053-96B6-FD260493E8DE}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1242","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27162,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400040","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1625,21.5892]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1242,"OGC_FID":1242,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{479EE9A4-D141-4AA9-AB01-786E80B162CF}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1243","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27163,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400041","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1485,21.6094]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1243,"OGC_FID":1243,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{9C892F90-31BD-406C-A826-6BD5B0F2B21F}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1244","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27164,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400042","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1609,21.5938]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1244,"OGC_FID":1244,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{58E6931B-24E6-4DCA-BE15-38D61610696A}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1245","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27165,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400043","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1489,21.5945]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1245,"OGC_FID":1245,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{DC1A458E-13FB-4BF3-9FB0-6115C6D6122A}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1246","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27166,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400044","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1478,21.5875]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1246,"OGC_FID":1246,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{2F3711E7-E065-467D-BBF3-6F45B969CFE7}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1247","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27167,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400045","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1572,21.6055]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1247,"OGC_FID":1247,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{9A04286D-DC1B-4423-B0FB-0C257AADDA44}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1248","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27168,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400046","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1462,21.5821]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1248,"OGC_FID":1248,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{D2530D0B-8294-435D-B0BE-ECC2DCAADB14}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1249","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27169,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400047","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1486,21.6114]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1249,"OGC_FID":1249,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{527F2707-453E-4535-AFF3-4C2D76922559}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1250","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27170,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400048","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1577,21.5884]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1250,"OGC_FID":1250,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{00F87F93-6C46-4EB8-ACE2-241902B77CD0}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1251","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27171,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400049","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1496,21.5888]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1251,"OGC_FID":1251,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{7E794E62-99BA-4631-878E-829AAC8646EE}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1252","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27172,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400050","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1494,21.593]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1252,"OGC_FID":1252,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{DBCF6052-D968-4F81-826A-4CE212F6C80A}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1253","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27173,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400051","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1597,21.5975]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1253,"OGC_FID":1253,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{F43887D7-4CF9-4AAC-BE6F-DECE175FFE54}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1254","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27174,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400052","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1637,21.5854]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1254,"OGC_FID":1254,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{82406A61-3F1C-4A12-B3FD-28BA9F7D475E}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1255","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27175,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400053","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1601,21.5807]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1255,"OGC_FID":1255,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{75D1A967-7F30-4468-A07B-F934A939FA33}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1256","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27176,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400054","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1592,21.5941]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1256,"OGC_FID":1256,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{FBBBC0B7-4909-4DC1-A768-9FDFF764B774}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1257","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27177,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400055","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.147,21.5895]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1257,"OGC_FID":1257,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{D3ED3EC0-F5D6-4B07-AF38-18E0F0F81D71}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1258","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27178,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400056","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1584,21.6014]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1258,"OGC_FID":1258,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{E09A3D28-8CE9-4746-BBE8-8A3A935082B4}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1259","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27179,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400057","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1496,21.5835]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1259,"OGC_FID":1259,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{0797F65E-3041-457F-9E9C-0F148D95158F}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1260","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27180,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400058","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1442,21.5762]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1260,"OGC_FID":1260,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{114BEA67-6AC4-4728-BFA0-ACBF30B6F136}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1261","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27181,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400059","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1473,21.5924]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1261,"OGC_FID":1261,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{8D09AB55-8E51-4CEC-839B-F5B12B479988}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1262","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27182,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400060","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1633,21.5867]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1262,"OGC_FID":1262,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{7C564FDE-68A1-4C30-8F62-675976F354D3}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1263","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27183,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400061","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1433,21.6113]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1263,"OGC_FID":1263,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{53630C18-E627-448A-B380-E4EACAD6952E}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1264","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27184,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400062","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1621,21.5902]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1264,"OGC_FID":1264,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{CBBDEF69-CD13-4EE6-8BFF-205D9737061D}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1265","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27185,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400063","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1561,21.6104]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1265,"OGC_FID":1265,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{34B85F1C-6654-45ED-AFD7-2EB3352C5A3D}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1266","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27186,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400064","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1598,21.5958]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1266,"OGC_FID":1266,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{764EE84A-6C9E-4DF1-8E8B-1D7B2B6AD064}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1267","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27187,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400065","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1568,21.5929]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1267,"OGC_FID":1267,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{E3270CE2-6B8E-48D6-A4BB-2B287C7F2244}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1268","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27188,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400066","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.153,21.5956]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1268,"OGC_FID":1268,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{DAA54977-97BB-4D17-A82D-A8BC4ACE0D6C}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1269","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27189,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400067","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1645,21.5831]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1269,"OGC_FID":1269,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{BDAF6A55-8A19-46BE-9AE4-DD4D577B4F3A}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1270","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27190,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400068","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1554,21.6136]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1270,"OGC_FID":1270,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{31F81DAC-AD77-460B-A0D5-8E0C6750081F}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1271","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27191,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400069","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1458,21.5996]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1271,"OGC_FID":1271,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{8D40DEB6-4C37-4F94-A666-7829AD7D8161}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1272","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27192,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400070","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1433,21.6018]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1272,"OGC_FID":1272,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{04956FD8-F07C-4ADD-90F5-FA76B5EC0067}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1273","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27193,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400071","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1583,21.5863]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1273,"OGC_FID":1273,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{93D3C141-E1D6-4B87-B80F-CF55A6BB5FB3}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1274","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27194,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400072","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1559,21.5838]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1274,"OGC_FID":1274,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"SAFA GENERAL CONTRACTOR","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1369861200000,"dateofendcontract":1328302800000,"dateofstart":1318194000000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{3C6EE97C-8E3D-4FA5-B68A-E27D92E576C9}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1275","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27195,"projectbudget":null,"projectcentroid_id":"B4-10392","projectcentroid_unified_id":"00200106400073","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":1,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1647,21.5827]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1275,"OGC_FID":1275,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{BBAEB257-3064-429D-969F-A512719AB56D}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1276","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27196,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400074","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1475,21.5813]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1276,"OGC_FID":1276,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{386FDA72-6933-4E0C-9A79-6023263C4B10}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1277","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27197,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400075","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1526,21.591]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1277,"OGC_FID":1277,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{A830A7F7-08B5-439A-843F-42813FAFC27A}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1278","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27198,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400076","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1506,21.595]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1278,"OGC_FID":1278,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{9C25519A-550A-4E73-9BE3-3EE77C218338}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1279","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27199,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400077","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1643,21.5836]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1279,"OGC_FID":1279,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"SAFA GENERAL CONTRACTOR","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1369861200000,"dateofendcontract":1328302800000,"dateofstart":1318194000000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{CEE3543E-9437-4D02-A126-E4C9A50AF11F}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1280","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27200,"projectbudget":null,"projectcentroid_id":"B4-10392","projectcentroid_unified_id":"00200106400078","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":1,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1636,21.5806]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1280,"OGC_FID":1280,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{C7D857EE-86C8-4156-9738-9801431E6459}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1281","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27201,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400079","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1553,21.5836]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1281,"OGC_FID":1281,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{71B9DD16-F4D9-4D2E-BCD3-76F9D34056D7}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1282","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27202,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400080","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1533,21.5912]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1282,"OGC_FID":1282,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{558B8C72-C5A0-4E26-BA41-FF7D61F4F928}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1283","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27203,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400081","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1582,21.602]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1283,"OGC_FID":1283,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{174842D8-F92B-41D7-9B3E-16FE613D1993}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1284","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27204,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400082","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1498,21.5817]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1284,"OGC_FID":1284,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{8CA5D242-3384-4740-A433-C8CD4C5C1096}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1285","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27205,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400083","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1456,21.5988]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1285,"OGC_FID":1285,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{607BE9F0-696F-4B56-AFAF-ED2BFFF6A53D}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1286","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27206,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400084","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1481,21.5868]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1286,"OGC_FID":1286,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{BAF6C91A-4923-44BE-9CBF-5696D25AC07E}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1287","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27207,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400085","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1419,21.6064]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1287,"OGC_FID":1287,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{01F1613A-CD9E-4FC5-8D7B-0A2F07627454}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1288","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27208,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400086","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1582,21.6011]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1288,"OGC_FID":1288,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{8E5B95F2-2235-4426-A1D2-64C8365C7FBA}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1289","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27209,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400087","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1587,21.5955]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1289,"OGC_FID":1289,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{277C1C0D-10F2-426D-A36B-0438A304751B}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1290","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27210,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400088","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1595,21.5948]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1290,"OGC_FID":1290,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{B4F7765F-EE1C-4704-B180-963A0F913037}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1291","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27211,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400089","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1599,21.5968]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1291,"OGC_FID":1291,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{06548407-88CC-4DB7-AD2A-70FBEB7F7FE4}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1292","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27212,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400090","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.145,21.5974]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1292,"OGC_FID":1292,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{5DDD277A-A705-40C8-9F10-7A464BD86A2A}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1293","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27213,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400091","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1514,21.5952]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1293,"OGC_FID":1293,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{585498F5-A1BB-44FF-8744-ACFB259FA85D}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1294","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27214,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400092","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1533,21.6035]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1294,"OGC_FID":1294,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{A8C4A983-2F1E-4766-B9F6-EDCBA9A1746F}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1295","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27215,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400093","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1563,21.5786]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1295,"OGC_FID":1295,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{9817C01A-B053-4FDA-9895-F1EF9083B25E}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1296","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27216,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400094","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1485,21.6106]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1296,"OGC_FID":1296,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{13DE6806-8518-4B27-9BA7-8F1AC0212343}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1297","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27217,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400095","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1629,21.588]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1297,"OGC_FID":1297,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{CC4CFDB9-60F1-4431-951F-CAB8B01FE645}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1298","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27218,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400096","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1499,21.5866]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1298,"OGC_FID":1298,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{8FEC1207-ED53-48F4-8698-5618BE03371E}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1299","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27219,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400097","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1438,21.5807]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1299,"OGC_FID":1299,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"SAFA GENERAL CONTRACTOR","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1369861200000,"dateofendcontract":1328302800000,"dateofstart":1318194000000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{9D2A5986-DDC5-4A94-95A0-17CE4289F06D}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1300","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27220,"projectbudget":null,"projectcentroid_id":"B4-10392","projectcentroid_unified_id":"00200106400098","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":1,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1647,21.5825]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1300,"OGC_FID":1300,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{9D550317-BCCC-4186-B4A9-519609B7BB32}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1301","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27221,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400099","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1463,21.5921]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1301,"OGC_FID":1301,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{C0A3D0F4-06BF-487B-B006-EBE2396D1699}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1302","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27222,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400100","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1418,21.6078]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1302,"OGC_FID":1302,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{D14FB382-1CDE-4920-9C20-D797C9E0D9C7}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1303","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27223,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400101","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1641,21.5842]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1303,"OGC_FID":1303,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{5C25018F-E943-4D05-9560-8BFC6BECDDB2}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1304","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27224,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400102","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1626,21.5804]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1304,"OGC_FID":1304,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{CC2794DB-4B81-48D8-AA09-CA672664B061}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1305","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27225,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400103","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.152,21.6041]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1305,"OGC_FID":1305,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{BA501A6C-443D-49BD-BC7B-CD9268264C45}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1306","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27226,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400104","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.153,21.5867]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1306,"OGC_FID":1306,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{03051771-0368-4C70-A1D2-9BE2827B288A}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1307","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27227,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400105","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1474,21.584]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1307,"OGC_FID":1307,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{9C4719EA-D151-4EFC-91AF-58835D0CA9CB}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1308","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27228,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400106","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1507,21.5789]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1308,"OGC_FID":1308,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{587164BD-0F8A-4C2E-A402-8A3BE916DAE1}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1309","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27229,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400107","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.159,21.5839]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1309,"OGC_FID":1309,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{56887042-F10D-4C5C-8B71-0B8F64901B4B}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1310","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27230,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400108","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1425,21.604]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1310,"OGC_FID":1310,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{DDE8FCDA-271C-428E-ABA8-F58825E84625}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1311","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27231,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400109","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1446,21.5806]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1311,"OGC_FID":1311,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{2DC56B2D-9993-41E5-AE45-747C203EAB47}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1312","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27232,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400110","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1579,21.6029]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1312,"OGC_FID":1312,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{173D2B8B-6C9C-4465-B8E1-413CCF574AAF}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1313","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27233,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400111","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.159,21.5994]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1313,"OGC_FID":1313,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{5AAE6E42-25CC-40A0-9F0A-C95BBCB2BE0F}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1314","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27234,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400112","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1527,21.5878]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1314,"OGC_FID":1314,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{3F7F114F-EF88-42C7-B1AB-92486F2BD862}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1315","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27235,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400113","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1457,21.6016]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1315,"OGC_FID":1315,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{593382A9-C1BB-4AE6-AE57-C805474138EA}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1316","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27236,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400114","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1585,21.5855]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1316,"OGC_FID":1316,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{A0E8167F-93D0-4C03-8EA9-C76C38219C38}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1317","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27237,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400115","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1651,21.5813]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1317,"OGC_FID":1317,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{E175045E-9289-49BC-90CC-EB4471F923CE}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1318","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27238,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400116","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1535,21.5906]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1318,"OGC_FID":1318,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{4315B53A-5C68-42FF-B44E-0F247213AD14}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1319","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27239,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400117","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1477,21.589]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1319,"OGC_FID":1319,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{063BE223-0932-458E-A4A7-CD5FEA284D71}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1320","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27240,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400118","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1525,21.5938]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1320,"OGC_FID":1320,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{4D76222A-04C1-40C8-9BBD-528F685B6D72}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1321","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27241,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400119","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1495,21.5824]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1321,"OGC_FID":1321,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{1D282C59-1725-4959-98ED-66972314AD90}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1322","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27242,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400120","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.159,21.5946]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1322,"OGC_FID":1322,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{61A24BCD-4784-406B-8FF3-32ADF6F27DAB}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1323","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27243,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400121","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1494,21.588]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1323,"OGC_FID":1323,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{FF5AAB11-8D50-458F-9552-40CADA140725}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1324","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27244,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400122","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1435,21.578]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1324,"OGC_FID":1324,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{5374E136-7F58-48EA-9CE1-A49CFEFA823B}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1325","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27245,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400123","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1584,21.6011]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1325,"OGC_FID":1325,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{33F2654A-CD06-43DB-ACDF-714C79F32207}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1326","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27246,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400124","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1536,21.5941]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1326,"OGC_FID":1326,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{0EEAD1E6-23BC-416A-8B03-2662FD434EAA}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1327","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27247,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400125","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1639,21.5847]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1327,"OGC_FID":1327,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{675D011A-E376-4423-859A-6F03E339FA29}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1328","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27248,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400126","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1501,21.5802]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1328,"OGC_FID":1328,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{DC540413-E014-4F01-8225-7282AAA94176}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1329","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27249,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400127","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1538,21.6045]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1329,"OGC_FID":1329,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"SAFA GENERAL CONTRACTOR","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1369861200000,"dateofendcontract":1328302800000,"dateofstart":1318194000000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{1D86FF1A-6BB6-48DD-93A8-8A6922206633}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1330","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27250,"projectbudget":null,"projectcentroid_id":"B4-10392","projectcentroid_unified_id":"00200106400128","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":1,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1651,21.5813]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1330,"OGC_FID":1330,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{C211C4C4-11DF-4E4E-BBEA-0368FE4BB7DF}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1331","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27251,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400129","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.147,21.5831]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1331,"OGC_FID":1331,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{B03937BA-D321-4C36-890E-2A6970002270}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1332","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27252,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400130","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1577,21.6037]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1332,"OGC_FID":1332,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{ECB26F0F-9816-40A9-A2E3-B1AADA3914F9}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1333","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27253,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400131","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1469,21.6018]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1333,"OGC_FID":1333,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{45909FA2-EBB6-468A-BA80-80BE51DA1839}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1334","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27254,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400132","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1539,21.6062]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1334,"OGC_FID":1334,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{D3A60FAE-631E-4744-A2F3-953E00E09CA0}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1335","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27255,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400133","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1472,21.5894]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1335,"OGC_FID":1335,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{D07E11B9-B9E3-4BB7-81E1-A6515D7A97AE}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1336","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27256,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400134","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1599,21.5813]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1336,"OGC_FID":1336,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{C5927DCF-2316-418C-A20A-4C82FF55856A}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1337","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27257,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400135","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1493,21.583]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1337,"OGC_FID":1337,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{8F8DFF72-4644-4937-A81F-ECA658CC8526}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1338","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27258,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400136","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1595,21.5981]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1338,"OGC_FID":1338,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{A3B2D919-906C-4037-BDE3-A68C56B5B918}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1339","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27259,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400137","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1445,21.5803]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1339,"OGC_FID":1339,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{FF2A31C5-8603-47A3-A6FB-B04D3A194941}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1340","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27260,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400138","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1508,21.5884]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1340,"OGC_FID":1340,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{3ACBD96D-FEBB-40CF-9982-22E8A911EFA0}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1341","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27261,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400139","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1579,21.5843]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1341,"OGC_FID":1341,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"SAFA GENERAL CONTRACTOR","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1369861200000,"dateofendcontract":1328302800000,"dateofstart":1318194000000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{08FCC4D6-9017-4B75-9D0B-670838559108}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1342","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27262,"projectbudget":null,"projectcentroid_id":"B4-10392","projectcentroid_unified_id":"00200106400140","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":1,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1649,21.5819]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1342,"OGC_FID":1342,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{E370AC29-F35D-4436-8333-EC4687A83D6C}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1343","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27263,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400141","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1527,21.5829]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1343,"OGC_FID":1343,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{FFC5C1EA-8003-4EF4-9EA8-46F6B0233C28}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1344","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27264,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400142","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1565,21.5921]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1344,"OGC_FID":1344,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{822D39D1-6BD7-4BD3-9CDD-5AD4A5C7BA01}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1345","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27265,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400143","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1457,21.5994]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1345,"OGC_FID":1345,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{08A9F1E8-1BBC-4CCE-956A-9BAD2ACAAFB4}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1346","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27266,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400144","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1491,21.5849]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1346,"OGC_FID":1346,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{CCC2E260-DB51-49F5-873A-723C9DF48A10}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1347","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27267,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400145","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1451,21.5784]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1347,"OGC_FID":1347,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{D6384A57-C6E9-4872-AC1C-EB15A9910D36}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1348","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27268,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400146","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1442,21.5948]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1348,"OGC_FID":1348,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{20EA4C35-516D-4C96-80C8-F56D032D4836}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1349","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27269,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400147","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1479,21.5814]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1349,"OGC_FID":1349,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{E644793D-887A-4058-B115-182C3C677B1D}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1350","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27270,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400148","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1589,21.5844]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1350,"OGC_FID":1350,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{F6ED721D-F593-4F23-BAD1-B7FB9261A9C1}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1351","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27271,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400149","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1492,21.5818]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1351,"OGC_FID":1351,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{5F668E1A-89A3-48B3-965B-A3ED11F8A507}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1352","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27272,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400150","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1504,21.6027]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1352,"OGC_FID":1352,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{79D41B9D-A6C6-435E-B61C-7D41E15EB381}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1353","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27273,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400151","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1422,21.611]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1353,"OGC_FID":1353,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{3819AE7D-2CD2-44C7-9476-C7B449198BC1}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1354","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27274,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400152","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1523,21.5954]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1354,"OGC_FID":1354,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{E756B9AC-C237-411F-9842-20C372A5C3B6}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1355","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27275,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400153","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1442,21.5934]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1355,"OGC_FID":1355,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{B3515EB1-A9E2-4387-85F5-D8E46D97A756}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1356","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27276,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400154","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1461,21.5921]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1356,"OGC_FID":1356,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{0CFC681D-9839-4E1B-86A6-B7B46B8C8CEE}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1357","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27277,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400155","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.147,21.611]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1357,"OGC_FID":1357,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{E0D80E69-C401-42C7-92B6-A8BC4AF6CE65}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1358","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27278,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400156","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1599,21.5938]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1358,"OGC_FID":1358,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{1304EE69-201C-4327-A254-5C1F5EEE02D8}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1359","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27279,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400157","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1532,21.6051]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1359,"OGC_FID":1359,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{31D0ED2E-3B4C-48D5-AAA6-783B083771D6}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1360","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27280,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400158","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.148,21.6021]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1360,"OGC_FID":1360,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{68210431-9296-4B0E-937B-7838B2F8D705}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1361","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27281,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400159","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1558,21.6118]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1361,"OGC_FID":1361,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{9CAE8B3B-AE70-47B2-8C19-33B59C3650D6}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1362","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27282,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400160","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1511,21.5773]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1362,"OGC_FID":1362,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{2C0D0E74-DCE0-4529-B7DB-1F6B62AFFDB1}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1363","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27283,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400161","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.157,21.5904]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1363,"OGC_FID":1363,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{21441B13-777E-4EA3-B214-1A6D701F81C2}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1364","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27284,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400162","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1438,21.6004]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1364,"OGC_FID":1364,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{C23CD709-B59C-4CD1-ACAE-CDD08F6D2187}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1365","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27285,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400163","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1457,21.5987]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1365,"OGC_FID":1365,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{2E933437-5B77-4462-A70F-777076C944B1}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1366","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27286,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400164","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1467,21.5903]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1366,"OGC_FID":1366,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{DD03640C-4B95-4660-B27A-C017714E69D7}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1367","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27287,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400165","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1482,21.5943]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1367,"OGC_FID":1367,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{8943683B-0951-424A-99C3-69F76FD1410E}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1368","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27288,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400166","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.149,21.5893]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1368,"OGC_FID":1368,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{C45C1B5C-02A5-4AEE-A491-3C7D0C2275A0}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1369","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27289,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400167","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1593,21.5936]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1369,"OGC_FID":1369,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{EEB5B6F7-5293-450A-B4B3-43941D0CE52E}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1370","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27290,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400168","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1597,21.582]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1370,"OGC_FID":1370,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{2E8D4E82-3483-43B1-B5B6-F1CA07159B4C}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1371","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27291,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400169","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1613,21.5927]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1371,"OGC_FID":1371,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{A2BDCAC9-AA8D-4274-8CE2-C856307EB073}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1372","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27292,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400170","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1473,21.5981]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1372,"OGC_FID":1372,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{3DA54D24-2BC0-4781-ADE5-746242799941}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1373","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27293,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400171","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1523,21.6032]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1373,"OGC_FID":1373,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{7AAD2367-02CC-4973-9650-7F84E6C01C99}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1374","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27294,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400172","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1472,21.5888]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1374,"OGC_FID":1374,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{007417B5-CF07-4DA2-BE34-6161ED528CF2}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1375","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27295,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400173","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1469,21.5833]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1375,"OGC_FID":1375,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{253B4DB6-2697-446F-8B11-5953A9735C9C}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1376","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27296,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400174","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1536,21.6052]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1376,"OGC_FID":1376,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{7F31C688-8985-4461-B288-25A60751A41E}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1377","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27297,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400175","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1503,21.5852]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1377,"OGC_FID":1377,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{C973A138-7287-4E74-867B-010B818734CF}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1378","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27298,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400176","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1443,21.5965]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1378,"OGC_FID":1378,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{57277C4A-08CE-490D-9ED7-2A1F96DCFDE7}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1379","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27299,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400177","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1455,21.5976]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1379,"OGC_FID":1379,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{EC7E78C2-70C6-47B8-BB8A-17439DCEABE8}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1380","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27300,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400178","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1441,21.5915]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1380,"OGC_FID":1380,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{E50C0E4D-548E-492B-B51C-265763739276}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1381","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27301,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400179","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1447,21.5794]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1381,"OGC_FID":1381,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{28684DFD-DE03-43C1-88E8-D9B769F1B7E6}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1382","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27302,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400180","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1513,21.603]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1382,"OGC_FID":1382,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"SAFA GENERAL CONTRACTOR","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1369861200000,"dateofendcontract":1328302800000,"dateofstart":1318194000000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{D8DD3997-74BE-4959-A8AB-8E44CAC0ECE6}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1383","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27303,"projectbudget":null,"projectcentroid_id":"B4-10392","projectcentroid_unified_id":"00200106400181","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":1,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1651,21.5813]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1383,"OGC_FID":1383,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{372C43BB-D73A-4AF2-BF35-2EA3B1F3476E}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1384","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27304,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400182","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.157,21.5841]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1384,"OGC_FID":1384,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{E0A5D3CF-3DA3-4A55-8C09-E716F7929DC7}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1385","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27305,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400183","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1587,21.5848]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1385,"OGC_FID":1385,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{C99BD5AB-7B7E-4E08-836B-2E4E2E9B7E90}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1386","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27306,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400184","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1497,21.6026]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1386,"OGC_FID":1386,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{C37A9EC0-0DD3-4183-B57A-90983FEA8388}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1387","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27307,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400185","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1467,21.5908]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1387,"OGC_FID":1387,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{5A98A172-4BDE-4B6D-B11E-E0B40217269C}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1388","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27308,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400186","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1566,21.6082]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1388,"OGC_FID":1388,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{472A49C8-43F0-4744-BEA0-DC819478F1EE}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1389","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27309,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400187","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1595,21.5968]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1389,"OGC_FID":1389,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{9C06D6D5-390E-4E83-984C-AE82FE53D2C6}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1390","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27310,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400188","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.146,21.6119]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1390,"OGC_FID":1390,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{B1B990DE-FEDC-4ACD-9BA0-40FDF401CFCB}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1391","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27311,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400189","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1443,21.5772]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1391,"OGC_FID":1391,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{0B6FFF9E-1F8C-4601-9E09-D75398926064}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1392","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27312,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400190","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1513,21.5955]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1392,"OGC_FID":1392,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{2BB96571-46C7-4127-A833-F3EAD87AE3C8}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1393","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27313,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400191","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1549,21.6056]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1393,"OGC_FID":1393,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{5AA4D2A3-33D5-46D6-B0F5-13E25EB9F036}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1394","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27314,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400192","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1647,21.5825]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1394,"OGC_FID":1394,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{E5C17F1A-35AD-425A-83C7-3B22C6FFF0CF}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1395","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27315,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400193","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1501,21.5806]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1395,"OGC_FID":1395,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{8D866B30-6294-4644-A2C0-16F263BD7F47}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1396","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27316,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400194","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.145,21.5974]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1396,"OGC_FID":1396,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{14B154F2-93DA-4331-B0A7-D425009C9387}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1397","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27317,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400195","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1423,21.6048]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1397,"OGC_FID":1397,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{792D4E2F-CF5D-472E-A7D6-8C188276CAD5}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1398","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27318,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400196","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1444,21.5984]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1398,"OGC_FID":1398,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{FF8BD81C-8B6C-45F4-8232-B579FA129766}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1399","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27319,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400197","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1483,21.5927]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1399,"OGC_FID":1399,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{F0D83374-B3FD-451C-A640-0F660A032C62}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1400","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27320,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400198","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1525,21.5884]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1400,"OGC_FID":1400,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{6931B0C4-DAD4-4594-9E99-09D65F4F97B0}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1401","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27321,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400199","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1496,21.5817]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1401,"OGC_FID":1401,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{15305ADE-3767-4C30-9540-2204E43D4B7F}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1402","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27322,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400200","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1602,21.5959]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1402,"OGC_FID":1402,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{A71D05EB-7E6A-4616-BF5C-F8EC6316EA0B}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1403","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27323,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400201","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1503,21.599]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1403,"OGC_FID":1403,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{070AFF10-EF3C-4705-B65F-9A692CC7EC7F}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1404","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27324,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400202","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1471,21.5844]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1404,"OGC_FID":1404,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{6250B16D-207C-4176-BD3C-C1AFACB34AAA}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1405","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27325,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400203","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1594,21.5827]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1405,"OGC_FID":1405,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{C7E1BBB6-9061-4C1F-844B-029E6E079C74}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1406","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27326,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400204","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1416,21.6105]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1406,"OGC_FID":1406,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{3EA5B152-9A76-4D0B-8D5F-BB9E1DF48587}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1407","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27327,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400205","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1501,21.5932]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1407,"OGC_FID":1407,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{21CFA6C8-AB7D-4A0E-A776-C4890A431822}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1408","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27328,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400206","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1483,21.5859]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1408,"OGC_FID":1408,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{D1EED631-BDF5-4F82-B189-C47A7A8600AE}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1409","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27329,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400207","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1555,21.6132]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1409,"OGC_FID":1409,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{8B1157C3-4032-46CB-88FA-92E8565C21AD}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1410","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27330,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400208","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1523,21.588]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1410,"OGC_FID":1410,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{50A02382-859D-4287-8029-34DF07355505}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1411","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27331,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400209","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1513,21.5919]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1411,"OGC_FID":1411,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{A40B26B8-E2D4-448F-BEAC-4DAEC9C13C99}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1412","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27332,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400210","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1458,21.6015]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1412,"OGC_FID":1412,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{1E3EBDA3-AA7E-47FA-AE41-AD1081DEA46F}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1413","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27333,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400211","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1608,21.5943]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1413,"OGC_FID":1413,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{EA4CA8F8-8403-4D6D-B86A-590281C58266}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1414","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27334,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400212","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1593,21.5988]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1414,"OGC_FID":1414,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{E59379B4-2B17-4EDF-8B6B-AF37811E881F}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1415","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27335,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400213","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1498,21.6115]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1415,"OGC_FID":1415,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{5066F119-1A02-4F20-A789-FB65377BCC3E}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1416","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27336,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400214","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1466,21.5939]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1416,"OGC_FID":1416,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{1A947428-EA13-4BBE-BE0C-E0B5AEBCF157}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1417","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27337,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400215","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1534,21.5831]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1417,"OGC_FID":1417,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{74256B26-F1E9-44CC-BBB9-26E9B20BC999}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1418","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27338,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400216","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1529,21.6043]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1418,"OGC_FID":1418,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{B74BC670-66F7-492B-9A14-09921CB7E5FC}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1419","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27339,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400217","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.147,21.6103]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1419,"OGC_FID":1419,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{77A243C3-00D5-4AF8-8D88-082F7951AFB1}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1420","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27340,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400218","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1413,21.6105]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1420,"OGC_FID":1420,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{95B3633C-630A-4510-933D-B6F6AA1FD536}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1421","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27341,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400219","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1571,21.6061]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1421,"OGC_FID":1421,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{203A7453-C4D0-40A1-9149-807D912A0903}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1422","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27342,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400220","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.156,21.5934]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1422,"OGC_FID":1422,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{1C9E4518-3D48-4720-9E96-6518DF13A2CF}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1423","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27343,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400221","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1449,21.5979]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1423,"OGC_FID":1423,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{D4CF4731-2A61-4660-BFF7-024FC66FBE4B}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1424","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27344,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400222","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1415,21.6109]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1424,"OGC_FID":1424,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{EBBF0B95-EF53-4948-B527-E5EAE0FDE6AE}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1425","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27345,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400223","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1453,21.5806]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1425,"OGC_FID":1425,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{615D57D1-6C3A-42EB-87CB-60EF8D036663}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1426","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27346,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400224","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1605,21.595]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1426,"OGC_FID":1426,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{9C453AB0-F8FA-42A3-BE87-F0A19BF91AB9}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1427","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27347,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400225","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1504,21.5798]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1427,"OGC_FID":1427,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{68E09F36-6124-4EE6-A689-6CE32CF2DD45}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1428","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27348,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400226","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1593,21.5832]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1428,"OGC_FID":1428,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{313822AD-10DC-4D78-8CA8-D2FA10299E5C}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1429","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27349,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400227","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1493,21.5843]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1429,"OGC_FID":1429,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{7B825F8F-A9A5-4C58-814B-01C35890D37B}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1430","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27350,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400228","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1484,21.5891]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1430,"OGC_FID":1430,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{18D5CC86-BD57-4380-8B20-C4DAA6BE6E20}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1431","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27351,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400229","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1575,21.5938]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1431,"OGC_FID":1431,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{2F2A173A-49BA-413E-9FCE-76553BB6CE3F}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1432","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27352,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400230","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1459,21.5798]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1432,"OGC_FID":1432,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{8A7D0A43-A8CF-4980-882A-ABF291903FA2}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1433","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27353,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400231","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1574,21.5894]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1433,"OGC_FID":1433,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{F1119F62-06C7-4199-89B4-3583EA1EE1BF}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1434","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27354,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400232","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1489,21.5986]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1434,"OGC_FID":1434,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{D0BE125D-363D-46CE-9CF8-5992DD0DF8EA}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1435","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27355,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400233","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1563,21.6097]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1435,"OGC_FID":1435,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{49C12A2C-2C20-48A0-9186-CC2D1D58CA2F}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1436","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27356,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400234","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1517,21.5936]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1436,"OGC_FID":1436,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{C5AB199A-D849-4B2C-8FED-DF0DAB558D7C}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1437","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27357,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400235","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1522,21.588]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1437,"OGC_FID":1437,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{B9B7BF23-420C-48ED-9F78-52DF6A79052F}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1438","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27358,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400236","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1552,21.5911]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1438,"OGC_FID":1438,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{239EAA00-EE92-4218-BE7D-B576A047E356}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1439","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27359,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400237","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.158,21.5876]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1439,"OGC_FID":1439,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{B6DA1886-A243-4436-99FC-4BB83620616C}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1440","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27360,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400238","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1489,21.6023]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1440,"OGC_FID":1440,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{63200FF6-CF96-4611-84AB-75EFD461ECAC}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1441","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27361,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400239","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1639,21.585]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1441,"OGC_FID":1441,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{3912D681-64AC-487A-9DE0-8984FAA03725}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1442","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27362,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400240","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.147,21.6121]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1442,"OGC_FID":1442,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{63422EC6-C694-42C6-9A99-30D6034E510B}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1443","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27363,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400241","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1443,21.5965]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1443,"OGC_FID":1443,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{256AD53E-FC06-4728-A8FA-A066AF921DDE}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1444","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27364,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400242","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1541,21.6053]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1444,"OGC_FID":1444,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{FBA1D9A3-DDC3-4B5D-8E3B-9E26E02B078F}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1445","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27365,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400243","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1457,21.6003]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1445,"OGC_FID":1445,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{771408DC-5C36-446A-B96F-DC2AD5293C5D}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1446","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27366,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400244","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1498,21.5948]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1446,"OGC_FID":1446,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{2E19B08B-6461-4852-8995-B1254CE4EB3A}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1447","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27367,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400245","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1505,21.5893]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1447,"OGC_FID":1447,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{2FBC4017-6D87-4679-849D-6FBC073EEFEA}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1448","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27368,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400246","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1502,21.5903]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1448,"OGC_FID":1448,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{6359B123-A30B-49CA-A477-3552B6FB7016}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1449","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27369,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400247","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1509,21.5905]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1449,"OGC_FID":1449,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{BD23669A-D2FB-45E8-9A39-B9D378015A1D}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1450","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27370,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400248","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1553,21.604]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1450,"OGC_FID":1450,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{02E6D951-1AB9-4643-B441-781189DEB8D0}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1451","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27371,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400249","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1558,21.612]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1451,"OGC_FID":1451,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{0DD9F7CB-DC08-4CAB-9BB6-64F91F698B25}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1452","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27372,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400250","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1568,21.6072]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1452,"OGC_FID":1452,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{28BA2411-B59B-40D3-96B5-8E89AEF61BEB}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1453","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27373,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400251","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1443,21.5782]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1453,"OGC_FID":1453,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{073DAB9E-FC8A-4B3D-AC65-8C41717ADC69}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1454","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27374,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400252","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1501,21.5859]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1454,"OGC_FID":1454,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{B3CD01FB-6895-47A9-BB5D-0EB5B065C630}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1455","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27375,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400253","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1538,21.5935]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1455,"OGC_FID":1455,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{435E07AE-CB33-47B2-9F9B-7D256A71957B}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1456","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27376,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400254","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1557,21.6124]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1456,"OGC_FID":1456,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{87C57F3D-3CF8-4809-A130-4F3C267730BA}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1457","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27377,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400255","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.157,21.5923]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1457,"OGC_FID":1457,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{ABC738B1-DD5C-479E-862F-A4E8B4DD9529}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1458","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27378,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400256","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1434,21.575]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1458,"OGC_FID":1458,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{0F3DEEB1-8E20-4141-A279-F39406408143}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1459","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27379,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400257","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1544,21.6038]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1459,"OGC_FID":1459,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{D053B399-FBDA-4765-B450-0C499A1B3ECD}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1460","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27380,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400258","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1474,21.5941]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1460,"OGC_FID":1460,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{FC3302B1-7F82-4E1E-8D62-53879CE2F6A4}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1461","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27381,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400259","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1458,21.6037]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1461,"OGC_FID":1461,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{E21EF207-A893-4C22-8481-9CFA9B62B8EA}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1462","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27382,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400260","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1556,21.5947]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1462,"OGC_FID":1462,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{B9EB42AA-5498-4B7E-8E3C-C85B1D49785F}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1463","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27383,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400261","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1489,21.5842]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1463,"OGC_FID":1463,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{519442F6-2F1D-4519-9990-827220B3D861}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1464","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27384,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400262","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1509,21.5823]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1464,"OGC_FID":1464,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{C27C1CAD-F77E-4BFA-B5A3-71EBBEB83E39}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1465","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27385,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400263","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1465,21.581]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1465,"OGC_FID":1465,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{2E8BCF2F-67E5-48CC-A81A-B0D8291C82C8}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1466","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27386,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400264","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1564,21.6091]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1466,"OGC_FID":1466,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{76089FCF-9F95-4AF6-9FAE-F20831C89597}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1467","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27387,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400265","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1534,21.5857]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1467,"OGC_FID":1467,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{E64353FC-34BD-440A-9ECE-3635E9244D0D}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1468","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27388,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400266","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1572,21.5917]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1468,"OGC_FID":1468,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{BF762944-F6C1-4D72-BC70-087A3E0E6001}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1469","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27389,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400267","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.15,21.5768]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1469,"OGC_FID":1469,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{123F1DF7-94B4-4729-BCA6-380603D69E96}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1470","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27390,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400268","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1486,21.6124]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1470,"OGC_FID":1470,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{77CB0051-F49A-4D52-A85E-965AEE54C3DC}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1471","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27391,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400269","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1442,21.5934]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1471,"OGC_FID":1471,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{19271659-E458-41A8-A0A4-F38868BD76C4}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1472","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27392,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400270","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1551,21.5938]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1472,"OGC_FID":1472,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{1F3EF9AA-1E7D-4C16-94C4-75E8E3469C6D}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1473","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27393,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400271","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.151,21.6038]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1473,"OGC_FID":1473,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{BCDEAB9B-E6BF-4C9E-8C79-9BAA95D94753}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1474","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27394,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400272","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1458,21.6061]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1474,"OGC_FID":1474,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{C36AB319-34F0-4159-93AF-BC34ACA0F1F3}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1475","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27395,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400273","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1561,21.6101]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1475,"OGC_FID":1475,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{66FDCF37-900D-49B6-A95A-288D660F93FD}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1476","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27396,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400274","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1472,21.5823]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1476,"OGC_FID":1476,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{238D037C-4F22-445A-B8C1-B885FD0B8A72}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1477","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27397,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400275","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1587,21.5846]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1477,"OGC_FID":1477,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{C36FA21E-A85C-4C86-A1D9-C782B6EC07A7}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1478","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27398,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400276","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1623,21.5897]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1478,"OGC_FID":1478,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{E7E22295-B8DE-43CB-AC8D-D8E39CE95A45}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1479","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27399,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400277","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.156,21.6106]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1479,"OGC_FID":1479,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{D5C0CB61-A625-4705-88D9-CE06490813B3}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1480","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27400,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400278","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1442,21.5806]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1480,"OGC_FID":1480,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{5766D330-0D2E-41A4-ACB1-6AC12F6104D6}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1481","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27401,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400279","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1574,21.6046]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1481,"OGC_FID":1481,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{73EFC202-FD22-4996-B1B3-5078E9D271E2}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1482","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27402,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400280","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.144,21.5997]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1482,"OGC_FID":1482,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{3CF19EE7-509D-4787-8A61-B9BD6ACC9CC5}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1483","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27403,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400281","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1442,21.5753]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1483,"OGC_FID":1483,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{C78C0E23-ADF3-4A7F-A8D3-5FB2C050AB42}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1484","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27404,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400282","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.153,21.5959]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1484,"OGC_FID":1484,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{959BBA4D-8B6B-44BC-9BE6-31052C1705E4}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1485","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27405,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400283","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1649,21.5819]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1485,"OGC_FID":1485,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{BB384B72-8745-4C5D-99A5-B885051FD27C}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1486","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27406,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400284","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1556,21.6127]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1486,"OGC_FID":1486,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{B9C6C50A-EB97-40C1-9F90-63B40DAF4E88}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1487","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27407,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400285","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1442,21.5946]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1487,"OGC_FID":1487,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{6CB6CC79-8FE3-4BFC-AEA2-C44F140F8BE1}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1488","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27408,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400286","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1576,21.5952]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1488,"OGC_FID":1488,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{E06BA321-1429-492F-8CBB-1712C67E6E3D}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1489","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27409,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400287","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1597,21.5977]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1489,"OGC_FID":1489,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{7F8195C0-AA8C-4B0B-97B8-D46E475798F0}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1490","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27410,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400288","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1588,21.6004]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1490,"OGC_FID":1490,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{51E94E4E-2EA3-47A7-9A9E-2FFDB470339F}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1491","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27411,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400289","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1631,21.5874]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1491,"OGC_FID":1491,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{F12747C4-7E9D-4FCA-A615-A8E9712ACFB6}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1492","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27412,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400290","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1481,21.5842]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1492,"OGC_FID":1492,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{74FB15B0-2615-4737-9B3A-667EB9A43958}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1493","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27413,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400291","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1458,21.6053]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1493,"OGC_FID":1493,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{03DBEE73-63BE-4C43-98CA-17DA7BF66850}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1494","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27414,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400292","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1508,21.5934]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1494,"OGC_FID":1494,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{5F915664-1E7B-43AE-B377-D4224806AB23}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1495","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27415,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400293","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1473,21.5981]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1495,"OGC_FID":1495,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{8BF6505F-3999-474A-B78A-A0CF2B7995B3}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1496","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27416,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400294","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1592,21.5957]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1496,"OGC_FID":1496,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{9CF55B72-BD18-41FC-8977-CC295B7CA8D8}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1497","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27417,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400295","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1568,21.5912]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1497,"OGC_FID":1497,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{DFF2411A-E567-46AC-987D-485BAF71DB9B}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1498","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27418,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400296","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1451,21.5818]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1498,"OGC_FID":1498,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"SAFA GENERAL CONTRACTOR","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1369861200000,"dateofendcontract":1328302800000,"dateofstart":1318194000000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{A5154476-7702-44E5-8FC1-F519417F5312}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1499","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27419,"projectbudget":null,"projectcentroid_id":"B4-10392","projectcentroid_unified_id":"00200106400297","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":1,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1618,21.5802]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1499,"OGC_FID":1499,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{8BAD0DA1-C368-4B14-9D95-5A0C67D71A08}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1500","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27420,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400298","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.162,21.5908]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1500,"OGC_FID":1500,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{0E5A6BAD-CAFC-4B6D-8762-683A9ECCE625}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1501","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27421,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400299","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1486,21.5852]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1501,"OGC_FID":1501,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{49E6DA1A-B7E4-4BD2-9B85-0BB26AF93F8A}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1502","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27422,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400300","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1519,21.5902]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1502,"OGC_FID":1502,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{B55FAF90-8211-42D2-B709-2DE89A6242F7}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1503","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27423,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400301","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1559,21.6113]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1503,"OGC_FID":1503,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{F8097AAA-29E2-4F15-B638-30575B185850}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1504","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27424,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400302","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1558,21.5785]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1504,"OGC_FID":1504,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{86539433-1431-41BC-A9A8-9997B9051BBF}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1505","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27425,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400303","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1492,21.5887]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1505,"OGC_FID":1505,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{F6F33918-36CD-4B4F-8168-5BC251D7EB6A}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1506","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27426,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400304","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.156,21.6108]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1506,"OGC_FID":1506,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{E6A95898-B991-40B9-9FA0-3E3789807C72}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1507","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27427,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400305","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1522,21.5894]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1507,"OGC_FID":1507,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{D3177FDB-3CEE-482A-BE9C-F8A89667A470}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1508","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27428,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400306","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1517,21.5907]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1508,"OGC_FID":1508,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{6F322958-A854-4F73-A509-79DD833CF2EC}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1509","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27429,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400307","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1466,21.5843]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1509,"OGC_FID":1509,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001064","districtbaladi":"10007865","duration":null,"elevation":null,"globalid":"{DF041A1B-2319-41E4-946C-B3D6B1D367BB}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1510","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27430,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200106400308","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1565,21.6086]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1510,"OGC_FID":1510,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001095","districtbaladi":"10007840","duration":null,"elevation":null,"globalid":"{6A7DD811-4A03-46A7-A5CD-69D0DD455C3C}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1511","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27431,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200109500001","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2324,21.6459]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1511,"OGC_FID":1511,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001095","districtbaladi":"10007840","duration":null,"elevation":null,"globalid":"{8CACE050-67D2-4610-9AB0-DB20E39E590C}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1512","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27432,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200109500002","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2337,21.6512]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1512,"OGC_FID":1512,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001095","districtbaladi":"10007840","duration":null,"elevation":null,"globalid":"{843A1EF1-F95C-46CE-9351-B69FB9C07B5F}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1513","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27433,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200109500003","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2299,21.6455]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1513,"OGC_FID":1513,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001095","districtbaladi":"10007840","duration":null,"elevation":null,"globalid":"{9F249186-25BA-434D-A68D-CE54E7BFDA32}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1514","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27434,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200109500004","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2316,21.6461]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1514,"OGC_FID":1514,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001095","districtbaladi":"10007840","duration":null,"elevation":null,"globalid":"{CA1F8A32-F526-4CFE-9928-53F817C1DE0A}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1515","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27435,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200109500005","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2299,21.6452]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1515,"OGC_FID":1515,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001095","districtbaladi":"10007840","duration":null,"elevation":null,"globalid":"{88F6EDFD-B17C-44AF-AF56-53439B342B84}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1516","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27436,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200109500006","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2298,21.6446]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1516,"OGC_FID":1516,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001095","districtbaladi":"10007840","duration":null,"elevation":null,"globalid":"{E7B2FA59-1AC1-4634-926D-732084C25EB4}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1517","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27437,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200109500007","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2353,21.6536]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1517,"OGC_FID":1517,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001095","districtbaladi":"10007840","duration":null,"elevation":null,"globalid":"{BF2883D6-832F-4679-946B-C45F1A6AFF0F}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1518","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27438,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200109500008","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2273,21.6481]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1518,"OGC_FID":1518,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001095","districtbaladi":"10007840","duration":null,"elevation":null,"globalid":"{948CD6A4-3807-4C2A-89F9-9E0A522E3D0D}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1519","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27439,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200109500009","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2348,21.6511]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1519,"OGC_FID":1519,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001095","districtbaladi":"10007840","duration":null,"elevation":null,"globalid":"{2238D41F-BEC3-43C7-8B5D-345100FE1AF8}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1520","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27440,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200109500010","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2249,21.6479]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1520,"OGC_FID":1520,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001095","districtbaladi":"10007840","duration":null,"elevation":null,"globalid":"{664BC67D-8BC8-438F-873A-62E0BB649696}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1521","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27441,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200109500011","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.237,21.653]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1521,"OGC_FID":1521,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001095","districtbaladi":"10007840","duration":null,"elevation":null,"globalid":"{4CE34346-C980-4B88-BA13-39768F41766D}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1522","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27442,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200109500012","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2307,21.6455]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1522,"OGC_FID":1522,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001095","districtbaladi":"10007840","duration":null,"elevation":null,"globalid":"{E1F09EF0-377C-4D7A-8C52-15DF5AA15EA2}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1523","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27443,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200109500013","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2266,21.6436]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1523,"OGC_FID":1523,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001095","districtbaladi":"10007840","duration":null,"elevation":null,"globalid":"{6D69BCFA-7202-4D61-8E84-AD46FDC088A9}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1524","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27444,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200109500014","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2303,21.646]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1524,"OGC_FID":1524,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001095","districtbaladi":"10007840","duration":null,"elevation":null,"globalid":"{73FA527B-189C-4F2C-9262-003B5BAA5C40}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1525","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27445,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200109500015","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2333,21.647]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1525,"OGC_FID":1525,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001095","districtbaladi":"10007840","duration":null,"elevation":null,"globalid":"{9C45843C-AA52-4148-99BC-F61E406810C9}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1526","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27446,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200109500016","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2199,21.6456]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1526,"OGC_FID":1526,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001095","districtbaladi":"10007840","duration":null,"elevation":null,"globalid":"{F8DF1568-9508-4C90-8710-48F057B3022C}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1527","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27447,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200109500017","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2319,21.652]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1527,"OGC_FID":1527,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001095","districtbaladi":"10007840","duration":null,"elevation":null,"globalid":"{B92516D1-EC60-48B6-8F18-53809E813F26}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1528","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27448,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200109500018","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2304,21.6467]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1528,"OGC_FID":1528,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001095","districtbaladi":"10007840","duration":null,"elevation":null,"globalid":"{1A0E251D-7F92-4F39-BA7A-28EDEEA3A7ED}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1529","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27449,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200109500019","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2332,21.647]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1529,"OGC_FID":1529,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001095","districtbaladi":"10007840","duration":null,"elevation":null,"globalid":"{579EF24A-480F-468F-B064-968AF08D5294}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1530","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27450,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200109500020","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2313,21.6516]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1530,"OGC_FID":1530,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001095","districtbaladi":"10007840","duration":null,"elevation":null,"globalid":"{444FFA14-3044-4158-8CD1-7B48EEF827FD}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1531","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27451,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200109500021","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2352,21.6536]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1531,"OGC_FID":1531,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001095","districtbaladi":"10007840","duration":null,"elevation":null,"globalid":"{98AF520E-07E1-4066-9EC2-38F3755AF61F}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1532","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27452,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200109500022","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2255,21.6436]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1532,"OGC_FID":1532,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001095","districtbaladi":"10007840","duration":null,"elevation":null,"globalid":"{ACD4659C-7329-4A22-AB19-886462D5E27B}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1533","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27453,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200109500023","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2324,21.651]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1533,"OGC_FID":1533,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001095","districtbaladi":"10007840","duration":null,"elevation":null,"globalid":"{BBAF0B09-2B72-402D-BA1A-0EFDBE16A571}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1534","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27454,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200109500024","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2301,21.6465]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1534,"OGC_FID":1534,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001095","districtbaladi":"10007840","duration":null,"elevation":null,"globalid":"{7894B78B-20F2-4A32-86C6-2694E3812824}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1535","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27455,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200109500025","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2296,21.6495]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1535,"OGC_FID":1535,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001095","districtbaladi":"10007840","duration":null,"elevation":null,"globalid":"{6DB8ADDA-2703-496F-84B4-B6D460BA4BC2}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1536","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27456,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200109500026","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.233,21.6511]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1536,"OGC_FID":1536,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001095","districtbaladi":"10007840","duration":null,"elevation":null,"globalid":"{B3382B82-6787-4840-AAA8-D45228D0D852}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1537","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27457,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200109500027","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2336,21.6471]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1537,"OGC_FID":1537,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001095","districtbaladi":"10007840","duration":null,"elevation":null,"globalid":"{32016A94-F572-4FBD-BA8A-5CB5AA6A2956}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1538","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27458,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200109500028","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2333,21.6511]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1538,"OGC_FID":1538,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001095","districtbaladi":"10007840","duration":null,"elevation":null,"globalid":"{D4E7B3BA-34FB-4D55-BAF5-9A7C311267C1}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1539","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27459,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200109500029","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2235,21.6478]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1539,"OGC_FID":1539,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001095","districtbaladi":"10007840","duration":null,"elevation":null,"globalid":"{5D8FAC77-288E-49B1-B732-C00F489ED979}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1540","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27460,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200109500030","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2281,21.6438]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1540,"OGC_FID":1540,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001095","districtbaladi":"10007840","duration":null,"elevation":null,"globalid":"{76E0FE8A-6C11-40C5-AFAE-BD48969E9ABB}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1541","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27461,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200109500031","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2308,21.646]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1541,"OGC_FID":1541,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001095","districtbaladi":"10007840","duration":null,"elevation":null,"globalid":"{91E03833-6A0B-4884-ABB9-0E0A43C2A9E5}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1542","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27462,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200109500032","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2309,21.651]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1542,"OGC_FID":1542,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001095","districtbaladi":"10007840","duration":null,"elevation":null,"globalid":"{1DF6293B-8851-499C-9D99-2B85B084027C}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1543","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27463,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200109500033","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2206,21.6464]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1543,"OGC_FID":1543,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001095","districtbaladi":"10007840","duration":null,"elevation":null,"globalid":"{3C7AD71D-7F43-40A6-9D69-C53000C9B422}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1544","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27464,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200109500034","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2283,21.6438]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1544,"OGC_FID":1544,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001095","districtbaladi":"10007840","duration":null,"elevation":null,"globalid":"{995B9833-92F8-4B67-BD9B-E286916559AC}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1545","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27465,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200109500035","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2271,21.649]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1545,"OGC_FID":1545,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001095","districtbaladi":"10007840","duration":null,"elevation":null,"globalid":"{FC0AD9E4-E675-49BE-B764-4CCA1724BBEC}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1546","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27466,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200109500036","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2356,21.6534]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1546,"OGC_FID":1546,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001095","districtbaladi":"10007840","duration":null,"elevation":null,"globalid":"{A8E672E3-BC05-4BE5-BFCC-436FE20BF61A}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1547","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27467,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200109500037","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2195,21.6462]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1547,"OGC_FID":1547,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001095","districtbaladi":"10007840","duration":null,"elevation":null,"globalid":"{158F2F41-67EE-46CF-B7CA-7001DFD4EAE9}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1548","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27468,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200109500038","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2311,21.6513]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1548,"OGC_FID":1548,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001095","districtbaladi":"10007840","duration":null,"elevation":null,"globalid":"{BBF94DDD-A75B-4A35-BE85-1B7245D7A9C5}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1549","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27469,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200109500039","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2323,21.6522]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1549,"OGC_FID":1549,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001095","districtbaladi":"10007840","duration":null,"elevation":null,"globalid":"{F8FFC184-04AB-41B1-AD18-2850D0BF4E34}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1550","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27470,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200109500040","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2358,21.6518]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1550,"OGC_FID":1550,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001095","districtbaladi":"10007840","duration":null,"elevation":null,"globalid":"{EFE0CAD3-1E6C-4EDD-A962-7A4CE31C8D16}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1551","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27471,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200109500041","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2342,21.6474]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1551,"OGC_FID":1551,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001095","districtbaladi":"10007840","duration":null,"elevation":null,"globalid":"{C204EAB6-1587-408E-84C9-B4704C43EE67}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1552","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27472,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200109500042","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2307,21.6507]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1552,"OGC_FID":1552,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001095","districtbaladi":"10007840","duration":null,"elevation":null,"globalid":"{2143DFAB-753C-43E0-AAE5-5D67A5353639}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1553","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27473,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200109500043","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2307,21.6503]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1553,"OGC_FID":1553,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001095","districtbaladi":"10007840","duration":null,"elevation":null,"globalid":"{EF9B7DCB-3208-4A46-A688-7705185E4C1F}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1554","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27474,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200109500044","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.238,21.6532]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1554,"OGC_FID":1554,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001095","districtbaladi":"10007840","duration":null,"elevation":null,"globalid":"{6EA1F5AB-ECC4-4935-87C8-20F5D1BC1581}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1555","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27475,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200109500045","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2363,21.6526]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1555,"OGC_FID":1555,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001095","districtbaladi":"10007840","duration":null,"elevation":null,"globalid":"{E3F1C0F1-E59F-4080-9323-94C0BA824678}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1556","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27476,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200109500046","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2298,21.6439]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1556,"OGC_FID":1556,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001095","districtbaladi":"10007840","duration":null,"elevation":null,"globalid":"{BA3EED1E-74CD-4BCF-8405-825975C7716A}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1557","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27477,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200109500047","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2289,21.6491]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1557,"OGC_FID":1557,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001095","districtbaladi":"10007840","duration":null,"elevation":null,"globalid":"{0FCDB123-AEFD-4871-8B2B-49F95073AC50}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1558","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27478,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200109500048","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2277,21.6483]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1558,"OGC_FID":1558,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001095","districtbaladi":"10007840","duration":null,"elevation":null,"globalid":"{631FF7CB-F9D3-4BE6-830F-875F5FB734F3}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1559","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27479,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200109500049","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2301,21.6467]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1559,"OGC_FID":1559,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001095","districtbaladi":"10007840","duration":null,"elevation":null,"globalid":"{B2945A92-E348-4E56-B011-ACEF4574A2E2}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1560","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27480,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200109500050","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2305,21.6502]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1560,"OGC_FID":1560,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001095","districtbaladi":"10007840","duration":null,"elevation":null,"globalid":"{8BD81D85-0E2B-43E8-8CDC-E92F72806099}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1561","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27481,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200109500051","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2232,21.6478]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1561,"OGC_FID":1561,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001095","districtbaladi":"10007840","duration":null,"elevation":null,"globalid":"{C289F5DE-CBB7-4C46-B85E-9008129CDE0E}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1562","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27482,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200109500052","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2307,21.6498]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1562,"OGC_FID":1562,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001095","districtbaladi":"10007840","duration":null,"elevation":null,"globalid":"{784FC68F-B65D-46C8-9581-93607E7104D5}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1563","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27483,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200109500053","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2227,21.6478]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1563,"OGC_FID":1563,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001095","districtbaladi":"10007840","duration":null,"elevation":null,"globalid":"{62C6E146-AF08-464A-8EDA-0EC1F3CF246F}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1564","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27484,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200109500054","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2322,21.6474]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1564,"OGC_FID":1564,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001095","districtbaladi":"10007840","duration":null,"elevation":null,"globalid":"{D5E338EA-32B1-4967-885D-8BE4D2ACB208}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1565","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27485,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200109500055","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2212,21.6465]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1565,"OGC_FID":1565,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001095","districtbaladi":"10007840","duration":null,"elevation":null,"globalid":"{CBF4666F-0797-40A8-BE6F-1E4941423971}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1566","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27486,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200109500056","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2346,21.6514]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1566,"OGC_FID":1566,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001095","districtbaladi":"10007840","duration":null,"elevation":null,"globalid":"{AB3EC83F-6240-4411-9186-F99DD2B336F6}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1567","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27487,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200109500057","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2342,21.6512]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1567,"OGC_FID":1567,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001095","districtbaladi":"10007840","duration":null,"elevation":null,"globalid":"{5E4B88A8-FDC3-48B4-8D06-8E851E6B79CA}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1568","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27488,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200109500058","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2303,21.645]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1568,"OGC_FID":1568,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001095","districtbaladi":"10007840","duration":null,"elevation":null,"globalid":"{E90B0FC6-6ADE-40FA-88EC-BBECB9E1D46C}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1569","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27489,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200109500059","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2217,21.643]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1569,"OGC_FID":1569,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001095","districtbaladi":"10007840","duration":null,"elevation":null,"globalid":"{3D3D94E2-F12A-48E6-A9FA-E895E82DE32A}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1570","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27490,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200109500060","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2319,21.6509]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1570,"OGC_FID":1570,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001095","districtbaladi":"10007840","duration":null,"elevation":null,"globalid":"{797BC3ED-E931-452E-990E-0F9804144DE7}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1571","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27491,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200109500061","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.234,21.6473]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1571,"OGC_FID":1571,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001095","districtbaladi":"10007840","duration":null,"elevation":null,"globalid":"{FB85177D-2340-48D6-BD13-B31CEC5EA88A}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1572","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27492,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200109500062","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2223,21.6422]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1572,"OGC_FID":1572,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001095","districtbaladi":"10007840","duration":null,"elevation":null,"globalid":"{748D4D92-FA1F-4CC5-9413-1671C89BDC96}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1573","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27493,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200109500063","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2361,21.6529]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1573,"OGC_FID":1573,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001095","districtbaladi":"10007840","duration":null,"elevation":null,"globalid":"{6C37EDE5-83FD-4B55-A239-A4B4A3B34D26}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1574","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27494,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200109500064","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.232,21.646]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1574,"OGC_FID":1574,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001095","districtbaladi":"10007840","duration":null,"elevation":null,"globalid":"{DAE72120-E2D7-4842-A6D8-D50215300944}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1575","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27495,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200109500065","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2365,21.6529]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1575,"OGC_FID":1575,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001095","districtbaladi":"10007840","duration":null,"elevation":null,"globalid":"{4C320324-1427-4689-8E46-271C78038312}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1576","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27496,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200109500066","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2307,21.6466]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1576,"OGC_FID":1576,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001095","districtbaladi":"10007840","duration":null,"elevation":null,"globalid":"{787B6D30-FAC4-4E52-BD40-AE5FD47795F3}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1577","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27497,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200109500067","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2338,21.6531]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1577,"OGC_FID":1577,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001095","districtbaladi":"10007840","duration":null,"elevation":null,"globalid":"{38CBA0E6-6BCD-434F-8686-292C17B82B1C}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1578","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27498,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200109500068","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2201,21.6464]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1578,"OGC_FID":1578,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001095","districtbaladi":"10007840","duration":null,"elevation":null,"globalid":"{B4BBCB37-C35C-4657-80E7-1D83944B73FF}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1579","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27499,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200109500069","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2315,21.6508]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1579,"OGC_FID":1579,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001095","districtbaladi":"10007840","duration":null,"elevation":null,"globalid":"{E36330FE-5693-4C0F-A8C5-46CB896E5C0F}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1580","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27500,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200109500070","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.225,21.6436]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1580,"OGC_FID":1580,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001095","districtbaladi":"10007840","duration":null,"elevation":null,"globalid":"{A8B38FA0-6003-4AD7-8ABF-2B404C63EA44}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1581","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27501,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200109500071","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.234,21.6512]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1581,"OGC_FID":1581,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001095","districtbaladi":"10007840","duration":null,"elevation":null,"globalid":"{5FF61B4D-D70B-4BBB-B3FA-872E1CCFF78D}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1582","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27502,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200109500072","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2264,21.6483]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1582,"OGC_FID":1582,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001095","districtbaladi":"10007840","duration":null,"elevation":null,"globalid":"{DB35E0F3-D280-4A9A-B26D-6B80C4C9BED8}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1583","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27503,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200109500073","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2355,21.6516]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1583,"OGC_FID":1583,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001095","districtbaladi":"10007840","duration":null,"elevation":null,"globalid":"{077573A3-281A-41E8-9252-CAE9FC53539F}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1584","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27504,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200109500074","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2324,21.6467]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1584,"OGC_FID":1584,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001095","districtbaladi":"10007840","duration":null,"elevation":null,"globalid":"{62F44178-C4CF-4E57-8435-E1FC87726C23}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1585","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27505,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200109500075","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2364,21.6536]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1585,"OGC_FID":1585,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001095","districtbaladi":"10007840","duration":null,"elevation":null,"globalid":"{2CFEAEE7-E18E-4523-82D3-52FB94BEDF78}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1586","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27506,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200109500076","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2362,21.6497]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1586,"OGC_FID":1586,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001095","districtbaladi":"10007840","duration":null,"elevation":null,"globalid":"{802353D2-7336-473B-BEC9-73C2C2D4DF40}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1587","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27507,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200109500077","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2212,21.6438]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1587,"OGC_FID":1587,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001095","districtbaladi":"10007840","duration":null,"elevation":null,"globalid":"{816B3E75-774C-45D2-ACAA-FF7CE4030ACB}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1588","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27508,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200109500078","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2319,21.6466]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1588,"OGC_FID":1588,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001095","districtbaladi":"10007840","duration":null,"elevation":null,"globalid":"{8B8324B5-FF4E-4B54-B022-91066F236E06}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1589","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27509,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200109500079","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2326,21.6525]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1589,"OGC_FID":1589,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001095","districtbaladi":"10007840","duration":null,"elevation":null,"globalid":"{D026082E-3F77-4B2C-863F-4E2E707C2C17}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1590","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27510,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200109500080","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2262,21.6436]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1590,"OGC_FID":1590,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001095","districtbaladi":"10007840","duration":null,"elevation":null,"globalid":"{A36DE2E8-E13C-47B4-8EF3-F03BD1405B40}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1591","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27511,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200109500081","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2202,21.6451]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1591,"OGC_FID":1591,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001095","districtbaladi":"10007840","duration":null,"elevation":null,"globalid":"{5C73F6B1-9E83-4E75-81CC-1BAFE10B3B68}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1592","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27512,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200109500082","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2307,21.6454]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1592,"OGC_FID":1592,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001095","districtbaladi":"10007840","duration":null,"elevation":null,"globalid":"{72A69A77-9223-4324-9C43-F1A81D874C4A}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1593","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27513,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200109500083","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2262,21.648]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1593,"OGC_FID":1593,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001095","districtbaladi":"10007840","duration":null,"elevation":null,"globalid":"{BA682C81-6515-456D-8F56-7A98981B42B1}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1594","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27514,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200109500084","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2303,21.6452]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1594,"OGC_FID":1594,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001095","districtbaladi":"10007840","duration":null,"elevation":null,"globalid":"{0839B92C-AE6F-4D36-B51C-D9A5F3882EFE}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1595","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27515,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200109500085","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2299,21.6458]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1595,"OGC_FID":1595,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001095","districtbaladi":"10007840","duration":null,"elevation":null,"globalid":"{C1DC6F03-F441-4432-9A9D-2074D1F60FFC}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1596","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27516,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200109500086","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.23,21.6462]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1596,"OGC_FID":1596,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001095","districtbaladi":"10007840","duration":null,"elevation":null,"globalid":"{475D412B-D557-444A-86A6-45AA0FF13F2F}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1597","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27517,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200109500087","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2295,21.6439]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1597,"OGC_FID":1597,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001095","districtbaladi":"10007840","duration":null,"elevation":null,"globalid":"{74058821-E99D-4B4F-9D2B-030CFEAD4FD5}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1598","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27518,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200109500088","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2268,21.6437]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1598,"OGC_FID":1598,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001095","districtbaladi":"10007840","duration":null,"elevation":null,"globalid":"{56758846-0B1E-46CA-9EE9-B98AE43427AF}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1599","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27519,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200109500089","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.226,21.6436]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1599,"OGC_FID":1599,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001095","districtbaladi":"10007840","duration":null,"elevation":null,"globalid":"{E51B317C-A7E9-4519-8872-419D566C1A1B}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1600","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27520,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200109500090","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2306,21.645]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1600,"OGC_FID":1600,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001095","districtbaladi":"10007840","duration":null,"elevation":null,"globalid":"{C6FCA71E-6EDD-4A4E-96AA-8584666C91A6}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1601","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27521,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200109500091","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2325,21.6462]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1601,"OGC_FID":1601,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001095","districtbaladi":"10007840","duration":null,"elevation":null,"globalid":"{DF6C9D2C-74AD-4DB7-B5FE-3B5951215BEE}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1602","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27522,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200109500092","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2313,21.6466]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1602,"OGC_FID":1602,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001095","districtbaladi":"10007840","duration":null,"elevation":null,"globalid":"{4029061D-B689-44B4-9A47-9EE74D79A60C}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1603","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27523,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200109500093","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2283,21.6488]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1603,"OGC_FID":1603,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001095","districtbaladi":"10007840","duration":null,"elevation":null,"globalid":"{80FB6B62-D2E4-4DFB-A851-F0E32F65C562}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1604","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27524,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200109500094","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2273,21.6437]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1604,"OGC_FID":1604,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001095","districtbaladi":"10007840","duration":null,"elevation":null,"globalid":"{507A1C7A-384A-4AF1-82EB-74C05549128D}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1605","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27525,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200109500095","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2308,21.6439]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1605,"OGC_FID":1605,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001095","districtbaladi":"10007840","duration":null,"elevation":null,"globalid":"{3156B6B6-4AAB-4A8E-B313-9D22E85B6BCA}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1606","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27526,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200109500096","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2277,21.6437]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1606,"OGC_FID":1606,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001095","districtbaladi":"10007840","duration":null,"elevation":null,"globalid":"{9911612A-09FE-4C61-9E07-C532A78C95FC}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1607","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27527,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200109500097","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2365,21.6524]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1607,"OGC_FID":1607,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001095","districtbaladi":"10007840","duration":null,"elevation":null,"globalid":"{2CC6EECD-39F6-47CC-B440-D9A1DE808F22}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1608","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27528,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200109500098","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2375,21.6531]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1608,"OGC_FID":1608,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001095","districtbaladi":"10007840","duration":null,"elevation":null,"globalid":"{42E5B4F9-BC09-40B2-B627-EC47586CEC20}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1609","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27529,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200109500099","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2324,21.647]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1609,"OGC_FID":1609,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001095","districtbaladi":"10007840","duration":null,"elevation":null,"globalid":"{95FCD3F2-0A4E-4482-BD75-5B40B5A2BD35}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1610","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27530,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200109500100","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2291,21.6438]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1610,"OGC_FID":1610,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001095","districtbaladi":"10007840","duration":null,"elevation":null,"globalid":"{E9B63C74-B7F6-45E0-938C-556BC75945AB}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1611","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27531,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200109500101","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2312,21.6508]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1611,"OGC_FID":1611,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001095","districtbaladi":"10007840","duration":null,"elevation":null,"globalid":"{C455E858-2F97-4397-BE38-E6A3FE77F43F}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1612","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27532,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200109500102","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2232,21.6435]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1612,"OGC_FID":1612,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001095","districtbaladi":"10007840","duration":null,"elevation":null,"globalid":"{FEFD369F-DAD9-4476-A579-5FAD59C88EC5}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1613","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27533,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200109500103","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2211,21.6476]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1613,"OGC_FID":1613,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001095","districtbaladi":"10007840","duration":null,"elevation":null,"globalid":"{7FAA9E97-333E-42A3-B8E7-0DDA53CD4E4B}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1614","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27534,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200109500104","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2329,21.6468]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1614,"OGC_FID":1614,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001095","districtbaladi":"10007840","duration":null,"elevation":null,"globalid":"{DF9E75C1-BCED-4FAE-A9C8-86EE4D4E64C2}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1615","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27535,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200109500105","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2267,21.6486]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1615,"OGC_FID":1615,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001095","districtbaladi":"10007840","duration":null,"elevation":null,"globalid":"{C91FE87B-7D66-4DB1-9040-7B0450613279}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1616","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27536,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200109500106","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2242,21.6479]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1616,"OGC_FID":1616,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001095","districtbaladi":"10007840","duration":null,"elevation":null,"globalid":"{EEF99AD6-E3F5-4BF3-B1C9-F3DB920094B1}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1617","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27537,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200109500107","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2244,21.6435]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1617,"OGC_FID":1617,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001095","districtbaladi":"10007840","duration":null,"elevation":null,"globalid":"{232BE76A-996D-40B2-AC4D-48ACB944250D}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1618","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27538,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200109500108","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2227,21.6476]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1618,"OGC_FID":1618,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001095","districtbaladi":"10007840","duration":null,"elevation":null,"globalid":"{D4FDF1F6-76B4-43E2-82EA-28C2E8618380}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1619","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27539,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200109500109","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2365,21.6507]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1619,"OGC_FID":1619,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001095","districtbaladi":"10007840","duration":null,"elevation":null,"globalid":"{54BD765F-027C-4FBF-A572-02F264EA5088}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1620","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27540,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200109500110","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2227,21.6428]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1620,"OGC_FID":1620,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001095","districtbaladi":"10007840","duration":null,"elevation":null,"globalid":"{0B0FA416-62B2-4130-BDA9-C9158882A3A7}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1621","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27541,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200109500111","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2309,21.6465]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1621,"OGC_FID":1621,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001095","districtbaladi":"10007840","duration":null,"elevation":null,"globalid":"{9557F6A0-CE13-41B6-A3BF-65469AABAABC}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1622","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27542,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200109500112","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.23,21.646]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1622,"OGC_FID":1622,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001095","districtbaladi":"10007840","duration":null,"elevation":null,"globalid":"{6E670DEB-EF05-4231-B2EB-1DC43CE7654E}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1623","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27543,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200109500113","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2341,21.6532]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1623,"OGC_FID":1623,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001095","districtbaladi":"10007840","duration":null,"elevation":null,"globalid":"{9E6ED7A5-D639-46C1-8448-F670066C13D8}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1624","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27544,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200109500114","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2322,21.6467]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1624,"OGC_FID":1624,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001095","districtbaladi":"10007840","duration":null,"elevation":null,"globalid":"{32AA809A-29FE-4B7E-9D90-9F4A6BEE452F}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1625","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27545,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200109500115","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2208,21.6464]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1625,"OGC_FID":1625,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001095","districtbaladi":"10007840","duration":null,"elevation":null,"globalid":"{62BFCE46-5747-4E4F-A0DB-D0F299EA0710}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1626","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27546,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200109500116","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2285,21.6438]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1626,"OGC_FID":1626,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001095","districtbaladi":"10007840","duration":null,"elevation":null,"globalid":"{135509B3-70DA-42C0-9F1C-6079165C3EEE}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1627","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27547,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200109500117","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2206,21.6446]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1627,"OGC_FID":1627,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001095","districtbaladi":"10007840","duration":null,"elevation":null,"globalid":"{65AB9250-4271-4B58-B786-32DEB552BCC0}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1628","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27548,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200109500118","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2219,21.6476]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1628,"OGC_FID":1628,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001095","districtbaladi":"10007840","duration":null,"elevation":null,"globalid":"{44569D9E-A591-400C-92EB-ABA4F2121E5F}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1629","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27549,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200109500119","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2311,21.646]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1629,"OGC_FID":1629,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001095","districtbaladi":"10007840","duration":null,"elevation":null,"globalid":"{A2BAC365-6840-4766-9919-55DBEF094065}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1630","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27550,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200109500120","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2358,21.6506]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1630,"OGC_FID":1630,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001095","districtbaladi":"10007840","duration":null,"elevation":null,"globalid":"{508A3984-BB74-41D2-841D-AE3EB89E1C23}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1631","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27551,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200109500121","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2368,21.65]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1631,"OGC_FID":1631,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001095","districtbaladi":"10007840","duration":null,"elevation":null,"globalid":"{BA32DC13-A3FA-4DA5-9F03-EE7935FA5A0F}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1632","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27552,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200109500122","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2347,21.6535]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1632,"OGC_FID":1632,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001095","districtbaladi":"10007840","duration":null,"elevation":null,"globalid":"{1B89CE87-B99D-450C-9C20-5F3CC83D1CE6}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1633","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27553,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200109500123","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2332,21.6527]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1633,"OGC_FID":1633,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001095","districtbaladi":"10007840","duration":null,"elevation":null,"globalid":"{6BEE893A-CCC5-4E23-A7B9-A8248BF195AB}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1634","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27554,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200109500124","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.223,21.6431]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1634,"OGC_FID":1634,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001095","districtbaladi":"10007840","duration":null,"elevation":null,"globalid":"{135F9407-0DC4-46A2-8B55-F8FEADD194EA}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1635","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27555,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200109500125","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2308,21.6494]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1635,"OGC_FID":1635,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001095","districtbaladi":"10007840","duration":null,"elevation":null,"globalid":"{0C7F3695-0517-4F83-B111-CBC3F24C72CD}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1636","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27556,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200109500126","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.236,21.6514]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1636,"OGC_FID":1636,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"KRIMMLEY","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":null,"dateofendcontract":1168722000000,"dateofstart":1097355600000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001099","districtbaladi":"10007905","duration":null,"elevation":0.0,"globalid":"{8577B7F2-B114-4371-B191-B8C27D62E3D1}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1637","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001004","objectid_1":27557,"projectbudget":null,"projectcentroid_id":"S4-10006","projectcentroid_unified_id":"00200109900001","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":1,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1933,21.5558]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1637,"OGC_FID":1637,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"KRIMMLEY","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":null,"dateofendcontract":1168722000000,"dateofstart":1097355600000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001099","districtbaladi":"10007905","duration":null,"elevation":0.0,"globalid":"{5F33C39F-0564-4BA8-B2E2-4C461273264B}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1638","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001004","objectid_1":27558,"projectbudget":null,"projectcentroid_id":"S4-10006","projectcentroid_unified_id":"00200109900002","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":1,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1929,21.5573]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1638,"OGC_FID":1638,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"KRIMMLEY","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":null,"dateofendcontract":1168722000000,"dateofstart":1097355600000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001099","districtbaladi":"10007905","duration":null,"elevation":0.0,"globalid":"{332AB6C4-D577-4AA9-93C9-BA4B8BCFDEFE}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1639","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001004","objectid_1":27559,"projectbudget":null,"projectcentroid_id":"S4-10006","projectcentroid_unified_id":"00200109900003","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":1,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1925,21.5593]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1639,"OGC_FID":1639,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"KRIMMLEY","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":null,"dateofendcontract":1168722000000,"dateofstart":1097355600000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001099","districtbaladi":"10007905","duration":null,"elevation":0.0,"globalid":"{FE2ACFB7-F585-4312-8A61-8F4B1FD4F689}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1640","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001004","objectid_1":27560,"projectbudget":null,"projectcentroid_id":"S4-10006","projectcentroid_unified_id":"00200109900004","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":1,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1931,21.5566]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1640,"OGC_FID":1640,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"KRIMMLEY","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":null,"dateofendcontract":1168722000000,"dateofstart":1097355600000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001099","districtbaladi":"10007905","duration":null,"elevation":0.0,"globalid":"{FC8BD58D-F7AD-49ED-AF76-96EAC739845C}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1641","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001004","objectid_1":27561,"projectbudget":null,"projectcentroid_id":"S4-10006","projectcentroid_unified_id":"00200109900005","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":1,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1924,21.5597]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1641,"OGC_FID":1641,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"KRIMMLEY","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":null,"dateofendcontract":1168722000000,"dateofstart":1097355600000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001099","districtbaladi":"10007905","duration":null,"elevation":0.0,"globalid":"{B5E14441-0807-4266-83A1-2DA41DEF8BC5}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1642","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001004","objectid_1":27562,"projectbudget":null,"projectcentroid_id":"S4-10006","projectcentroid_unified_id":"00200109900006","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":1,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1929,21.5576]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1642,"OGC_FID":1642,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"KRIMMLEY","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":null,"dateofendcontract":1168722000000,"dateofstart":1097355600000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001099","districtbaladi":"10007905","duration":null,"elevation":0.0,"globalid":"{69507907-BA08-421C-8F39-E0AB3725B3CD}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1643","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001004","objectid_1":27563,"projectbudget":null,"projectcentroid_id":"S4-10006","projectcentroid_unified_id":"00200109900007","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":1,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1928,21.5577]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1643,"OGC_FID":1643,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"KRIMMLEY","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":null,"dateofendcontract":1168722000000,"dateofstart":1097355600000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001099","districtbaladi":"10007905","duration":null,"elevation":0.0,"globalid":"{56240F47-CB2B-4BF2-B22A-12CC5E959E81}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1644","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001004","objectid_1":27564,"projectbudget":null,"projectcentroid_id":"S4-10006","projectcentroid_unified_id":"00200109900008","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":1,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1926,21.5587]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1644,"OGC_FID":1644,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"KRIMMLEY","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":null,"dateofendcontract":1168722000000,"dateofstart":1097355600000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001099","districtbaladi":"10007905","duration":null,"elevation":0.0,"globalid":"{16C8C963-02ED-4F93-A98B-4297A4C81A7D}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1645","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001004","objectid_1":27565,"projectbudget":null,"projectcentroid_id":"S4-10006","projectcentroid_unified_id":"00200109900009","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":1,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1952,21.5469]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1645,"OGC_FID":1645,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"KRIMMLEY","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":null,"dateofendcontract":1168722000000,"dateofstart":1097355600000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001099","districtbaladi":"10007905","duration":null,"elevation":0.0,"globalid":"{59158BB7-322B-4711-B618-5090684EF455}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1646","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001004","objectid_1":27566,"projectbudget":null,"projectcentroid_id":"S4-10006","projectcentroid_unified_id":"00200109900010","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":1,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.194,21.5525]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1646,"OGC_FID":1646,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"KRIMMLEY","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":null,"dateofendcontract":1168722000000,"dateofstart":1097355600000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001099","districtbaladi":"10007905","duration":null,"elevation":0.0,"globalid":"{47C243B3-6524-4727-A55E-2C0D200C0DA1}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1647","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001004","objectid_1":27567,"projectbudget":null,"projectcentroid_id":"S4-10006","projectcentroid_unified_id":"00200109900011","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":1,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1944,21.5509]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1647,"OGC_FID":1647,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"KRIMMLEY","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":null,"dateofendcontract":1168722000000,"dateofstart":1097355600000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001099","districtbaladi":"10007905","duration":null,"elevation":0.0,"globalid":"{A59E3657-24CE-4298-BF3A-DD4B81CFDE22}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1648","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001004","objectid_1":27568,"projectbudget":null,"projectcentroid_id":"S4-10006","projectcentroid_unified_id":"00200109900012","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":1,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1954,21.5461]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1648,"OGC_FID":1648,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"KRIMMLEY","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":null,"dateofendcontract":1168722000000,"dateofstart":1097355600000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001099","districtbaladi":"10007905","duration":null,"elevation":0.0,"globalid":"{03ADFF32-C619-4112-8ADE-DD1237C7AD1B}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1649","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001004","objectid_1":27569,"projectbudget":null,"projectcentroid_id":"S4-10006","projectcentroid_unified_id":"00200109900013","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":1,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1953,21.5467]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1649,"OGC_FID":1649,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"KRIMMLEY","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":null,"dateofendcontract":1168722000000,"dateofstart":1097355600000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001099","districtbaladi":"10007905","duration":null,"elevation":0.0,"globalid":"{24123409-AC67-4313-84E2-018C487EE190}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1650","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001004","objectid_1":27570,"projectbudget":null,"projectcentroid_id":"S4-10006","projectcentroid_unified_id":"00200109900014","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":1,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.195,21.5478]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1650,"OGC_FID":1650,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"KRIMMLEY","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":null,"dateofendcontract":1168722000000,"dateofstart":1097355600000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001099","districtbaladi":"10007905","duration":null,"elevation":0.0,"globalid":"{4DC1D855-A4AE-476F-8AAE-2CA0FEE1B0EF}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1651","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001004","objectid_1":27571,"projectbudget":null,"projectcentroid_id":"S4-10006","projectcentroid_unified_id":"00200109900015","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":1,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1955,21.5458]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1651,"OGC_FID":1651,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"KRIMMLEY","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":null,"dateofendcontract":1168722000000,"dateofstart":1097355600000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001099","districtbaladi":"10007905","duration":null,"elevation":0.0,"globalid":"{99F8F81F-A63B-43F5-8D72-174D8C7E0A99}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1652","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001004","objectid_1":27572,"projectbudget":null,"projectcentroid_id":"S4-10006","projectcentroid_unified_id":"00200109900016","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":1,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1949,21.5487]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1652,"OGC_FID":1652,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"KRIMMLEY","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":null,"dateofendcontract":1168722000000,"dateofstart":1097355600000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001099","districtbaladi":"10007905","duration":null,"elevation":0.0,"globalid":"{A59D40A7-F2B6-4B05-A244-21D15ECCFAD0}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1653","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001004","objectid_1":27573,"projectbudget":null,"projectcentroid_id":"S4-10006","projectcentroid_unified_id":"00200109900017","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":1,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1947,21.5495]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1653,"OGC_FID":1653,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"KRIMMLEY","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":null,"dateofendcontract":1168722000000,"dateofstart":1097355600000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001099","districtbaladi":"10007905","duration":null,"elevation":0.0,"globalid":"{7796DCC5-20D8-4A58-9C16-738C3F030C84}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1654","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001004","objectid_1":27574,"projectbudget":null,"projectcentroid_id":"S4-10006","projectcentroid_unified_id":"00200109900018","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":1,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1945,21.5502]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1654,"OGC_FID":1654,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"KRIMMLEY","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":null,"dateofendcontract":1168722000000,"dateofstart":1097355600000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001099","districtbaladi":"10007905","duration":null,"elevation":0.0,"globalid":"{778348B7-F674-43F9-A941-673D1D4353C6}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1655","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001004","objectid_1":27575,"projectbudget":null,"projectcentroid_id":"S4-10006","projectcentroid_unified_id":"00200109900019","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":1,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1942,21.5518]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1655,"OGC_FID":1655,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"KRIMMLEY","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":null,"dateofendcontract":1168722000000,"dateofstart":1097355600000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001099","districtbaladi":"10007905","duration":null,"elevation":0.0,"globalid":"{DFC73467-8156-4440-AC14-C762F8569202}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1656","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001004","objectid_1":27576,"projectbudget":null,"projectcentroid_id":"S4-10006","projectcentroid_unified_id":"00200109900020","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":1,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1939,21.5531]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1656,"OGC_FID":1656,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"KRIMMLEY","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":null,"dateofendcontract":1168722000000,"dateofstart":1097355600000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001099","districtbaladi":"10007905","duration":null,"elevation":0.0,"globalid":"{7442E0F0-F5BE-4FFD-B257-3F02703FD8A4}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1657","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001004","objectid_1":27577,"projectbudget":null,"projectcentroid_id":"S4-10006","projectcentroid_unified_id":"00200109900021","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":1,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1937,21.5537]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1657,"OGC_FID":1657,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"KRIMMLEY","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":null,"dateofendcontract":1168722000000,"dateofstart":1097355600000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001099","districtbaladi":"10007905","duration":null,"elevation":0.0,"globalid":"{28F5798D-1901-4A8B-AFDF-0BC05517CDE5}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1658","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001004","objectid_1":27578,"projectbudget":null,"projectcentroid_id":"S4-10006","projectcentroid_unified_id":"00200109900022","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":1,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1936,21.5543]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1658,"OGC_FID":1658,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"KRIMMLEY","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":null,"dateofendcontract":1168722000000,"dateofstart":1097355600000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001099","districtbaladi":"10007905","duration":null,"elevation":0.0,"globalid":"{67E88C5A-2EB1-47CE-9B62-4DDFB8E7B635}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1659","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001004","objectid_1":27579,"projectbudget":null,"projectcentroid_id":"S4-10006","projectcentroid_unified_id":"00200109900023","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":1,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1934,21.555]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1659,"OGC_FID":1659,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Ali Al Aswad Group","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1398805200000,"dateofendcontract":1301259600000,"dateofstart":1240088400000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001114","districtbaladi":"10007755","duration":null,"elevation":0.0,"globalid":"{3E605104-07D6-44A5-813E-266B34A2ECA9}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1660","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001002","objectid_1":27580,"projectbudget":null,"projectcentroid_id":"S4-10277","projectcentroid_unified_id":"00200111400001","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2951,21.4478]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1660,"OGC_FID":1660,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Ali Al Aswad Group","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":null,"dateofendcontract":null,"dateofstart":null,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001114","districtbaladi":"10007755","duration":null,"elevation":null,"globalid":"{622FBC82-F7CE-4B56-83FB-1013B62E8304}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1661","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001002","objectid_1":27581,"projectbudget":null,"projectcentroid_id":null,"projectcentroid_unified_id":"00200111400002","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2822,21.4511]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1661,"OGC_FID":1661,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":null,"created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"CulvertProjects","dateofend":1398805200000,"dateofendcontract":1301259600000,"dateofstart":1240088400000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001114","districtbaladi":"10007755","duration":null,"elevation":43.67,"globalid":"{92238E08-B2BA-40F3-976B-EC531974A4BA}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1662","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001002","objectid_1":27582,"projectbudget":null,"projectcentroid_id":null,"projectcentroid_unified_id":"00200111400003","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":2,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":"S4-10277","submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2846,21.4508]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1662,"OGC_FID":1662,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Ali Al Aswad Group","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":null,"dateofendcontract":null,"dateofstart":null,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001114","districtbaladi":"10007755","duration":null,"elevation":null,"globalid":"{8A125342-A1E3-43ED-8950-93A7D4BA7098}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1663","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001002","objectid_1":27583,"projectbudget":null,"projectcentroid_id":null,"projectcentroid_unified_id":"00200111400004","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2912,21.4488]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1663,"OGC_FID":1663,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Ali Al Aswad Group","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":null,"dateofendcontract":null,"dateofstart":null,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001114","districtbaladi":"10007755","duration":null,"elevation":null,"globalid":"{D3CCA397-0E94-4D1F-B039-6075C9CCB642}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1664","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001002","objectid_1":27584,"projectbudget":null,"projectcentroid_id":null,"projectcentroid_unified_id":"00200111400005","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.282,21.4512]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1664,"OGC_FID":1664,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Ali Al Aswad Group","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1398805200000,"dateofendcontract":1301259600000,"dateofstart":1240088400000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001114","districtbaladi":"10007755","duration":null,"elevation":0.0,"globalid":"{646A0EBE-5652-4F20-B914-AC959D374C7B}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1665","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001002","objectid_1":27585,"projectbudget":null,"projectcentroid_id":"S4-10277","projectcentroid_unified_id":"00200111400006","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.293,21.4483]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1665,"OGC_FID":1665,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":null,"created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"CulvertProjects","dateofend":1398805200000,"dateofendcontract":1301259600000,"dateofstart":1240088400000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001114","districtbaladi":"10007755","duration":null,"elevation":null,"globalid":"{92FBD90B-9D71-4522-AF0F-C539AB8D7D69}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1666","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001002","objectid_1":27586,"projectbudget":null,"projectcentroid_id":null,"projectcentroid_unified_id":"00200111400007","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":2,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":"S4-10277","submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2821,21.4512]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1666,"OGC_FID":1666,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":null,"created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"CulvertProjects","dateofend":1398805200000,"dateofendcontract":1301259600000,"dateofstart":1240088400000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001114","districtbaladi":"10007755","duration":null,"elevation":43.801,"globalid":"{C1E95738-7673-47C7-9197-1143627C2FEC}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1667","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001002","objectid_1":27587,"projectbudget":null,"projectcentroid_id":null,"projectcentroid_unified_id":"00200111400008","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":2,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":"S4-10277","submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2847,21.4508]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1667,"OGC_FID":1667,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{28E4945C-B30A-44E9-AFA4-C8D128104E12}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1668","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27588,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600001","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1331,21.5874]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1668,"OGC_FID":1668,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{0650048B-C535-41EB-9D7E-0405F371326B}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1669","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27589,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600002","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1438,21.5895]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1669,"OGC_FID":1669,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{C4686CA6-311F-41FA-882E-723793D3D7A5}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1670","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27590,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600003","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1419,21.606]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1670,"OGC_FID":1670,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{A99455E0-70E8-482F-AA41-89CD87A76917}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1671","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27591,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600004","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.142,21.6054]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1671,"OGC_FID":1671,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{9647AB7C-F20A-46BC-B5C4-3272D944F643}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1672","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27592,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600005","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1397,21.5954]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1672,"OGC_FID":1672,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{8B92E2E6-BE84-485D-B564-CF64D03DF518}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1673","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27593,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600006","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1396,21.594]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1673,"OGC_FID":1673,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{81FB7F33-B0E4-4F67-BDD4-97B1BA05BAED}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1674","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27594,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600007","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1388,21.5735]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1674,"OGC_FID":1674,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{0D784DBC-3504-4C32-85D2-50EAC3C8BD6A}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1675","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27595,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600008","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1388,21.6103]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1675,"OGC_FID":1675,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{EF3E9273-C88F-485C-A72A-DA315AFCEAB1}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1676","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27596,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600009","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.141,21.5918]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1676,"OGC_FID":1676,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{B914B044-EE17-4313-9E09-63DC6283E48E}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1677","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27597,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600010","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.14,21.5843]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1677,"OGC_FID":1677,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{CC033A4E-55AE-4747-B1CA-8184CFAAA86E}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1678","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27598,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600011","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1311,21.5894]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1678,"OGC_FID":1678,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{6C48FBCF-D5B9-4B04-8A06-35F55BD884C9}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1679","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27599,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600012","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1266,21.5973]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1679,"OGC_FID":1679,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{56D2E5A3-3C8F-4A52-81BA-304DB523ADD2}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1680","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27600,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600013","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1366,21.5729]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1680,"OGC_FID":1680,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{81283DD4-E4F1-470C-A660-352ED2012E42}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1681","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27601,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600014","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1358,21.5727]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1681,"OGC_FID":1681,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{0976AC41-E9C9-48E2-AE7A-D5DC5E49363F}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1682","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27602,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600015","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1304,21.6084]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1682,"OGC_FID":1682,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{DC56E8B8-0CD7-41F7-91E7-89CF57DFD39B}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1683","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27603,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600016","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1312,21.5911]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1683,"OGC_FID":1683,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{CDB25F7A-625C-4D08-A2BD-C3BE79D07878}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1684","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27604,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600017","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1404,21.6107]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1684,"OGC_FID":1684,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{7E4FB61A-776A-41E1-B9E4-4AC7315B2F5D}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1685","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27605,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600018","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1312,21.5981]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1685,"OGC_FID":1685,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{D4F89A14-9A96-46C5-AE0A-72EECD9D8303}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1686","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27606,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600019","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1387,21.5975]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1686,"OGC_FID":1686,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{7E02AC35-A8AC-46F7-A401-A167E2FE223F}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1687","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27607,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600020","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1435,21.5821]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1687,"OGC_FID":1687,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{25F9451E-E749-4282-BA12-7F9DB5CC61DF}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1688","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27608,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600021","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1431,21.5973]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1688,"OGC_FID":1688,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{2937EBA4-50D7-4A10-9D8E-25D6873114A7}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1689","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27609,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600022","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.129,21.5812]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1689,"OGC_FID":1689,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{A721434A-60E3-43FE-8E80-3277E783B9C3}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1690","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27610,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600023","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1369,21.5844]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1690,"OGC_FID":1690,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{B98F7353-C449-4E5F-B8F5-1A5BB199FD56}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1691","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27611,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600024","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1436,21.5838]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1691,"OGC_FID":1691,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{6466ABEF-2CC1-456F-8A74-AA045F09337A}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1692","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27612,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600025","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1395,21.6015]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1692,"OGC_FID":1692,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{42DFA1E6-30DB-444D-984B-92BD10E64345}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1693","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27613,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600026","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1343,21.5773]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1693,"OGC_FID":1693,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{C59DE39C-6245-416C-88DB-94406956A04C}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1694","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27614,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600027","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1313,21.5957]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1694,"OGC_FID":1694,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{5585B7D6-C590-4AFD-81AD-8FF18FDA1742}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1695","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27615,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600028","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.132,21.598]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1695,"OGC_FID":1695,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{775FF279-1001-4560-9588-284338FC647F}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1696","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27616,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600029","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1312,21.5949]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1696,"OGC_FID":1696,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{52ED0F66-BC8F-4B69-912E-5C1E7B4F9355}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1697","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27617,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600030","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1388,21.5871]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1697,"OGC_FID":1697,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{A342B922-6478-4EAB-A852-61DA8AB48ECF}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1698","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27618,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600031","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1312,21.5875]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1698,"OGC_FID":1698,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{1B356523-D810-4D10-9076-7622DF51CF53}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1699","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27619,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600032","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1312,21.5903]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1699,"OGC_FID":1699,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{E269BD70-B5E2-490D-9D60-08DAA33E5398}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1700","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27620,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600033","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1289,21.5723]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1700,"OGC_FID":1700,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{2D67E959-38C2-4646-AE33-859E55808E5F}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1701","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27621,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600034","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1381,21.5844]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1701,"OGC_FID":1701,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{98D9BAD7-7C25-4AB9-8F51-DCF7AC553319}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1702","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27622,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600035","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1384,21.5914]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1702,"OGC_FID":1702,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{E2885217-868D-4F5E-A130-AD80F471D64E}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1703","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27623,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600036","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1404,21.5947]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1703,"OGC_FID":1703,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{AF359FF6-28C8-4EB3-B62B-D9B073BB04C2}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1704","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27624,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600037","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1383,21.5991]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1704,"OGC_FID":1704,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{9ED8E2D0-65C7-46C5-9245-D0DCE1CE662C}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1705","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27625,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600038","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1377,21.5844]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1705,"OGC_FID":1705,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{528B95A2-E248-4841-8157-2AB1DDD6958C}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1706","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27626,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600039","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1433,21.5975]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1706,"OGC_FID":1706,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{909BB1AA-A40D-4FE8-9829-E8597DA7108C}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1707","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27627,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600040","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1383,21.5998]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1707,"OGC_FID":1707,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{6C361079-DBCA-440E-8876-060E62F2C4C8}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1708","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27628,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600041","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1311,21.5826]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1708,"OGC_FID":1708,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{C9D42D64-C556-4497-8239-F9119A0751C1}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1709","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27629,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600042","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1347,21.5845]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1709,"OGC_FID":1709,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{34312748-B257-49A7-8D8F-4C8B6397E546}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1710","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27630,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600043","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.138,21.5865]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1710,"OGC_FID":1710,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{CE26FE9D-5FD0-4EF8-B7A6-9F81B08EE368}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1711","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27631,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600044","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1423,21.6044]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1711,"OGC_FID":1711,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{85A50797-2C00-4464-A204-F527961D1CE2}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1712","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27632,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600045","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.13,21.5775]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1712,"OGC_FID":1712,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{83332B54-2C8F-41B8-815F-D4D24750AC76}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1713","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27633,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600046","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1414,21.5975]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1713,"OGC_FID":1713,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{0AB7F84E-8528-4FC3-8F26-34AE6C27EC44}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1714","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27634,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600047","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1312,21.5964]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1714,"OGC_FID":1714,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{16A9AAAF-EF71-467B-BDF9-DF9F14F49AB1}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1715","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27635,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600048","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1436,21.5843]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1715,"OGC_FID":1715,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{1E5C6D49-F351-4467-8C3C-41FAC7CA7C9E}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1716","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27636,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600049","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1307,21.5723]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1716,"OGC_FID":1716,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{A40EE5E1-FFCA-4483-89A4-7DE6F1C41A61}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1717","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27637,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600050","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1329,21.6087]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1717,"OGC_FID":1717,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{4472EA57-48C5-4479-8CED-B07AAB14DEB9}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1718","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27638,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600051","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1397,21.5974]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1718,"OGC_FID":1718,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{B1DCAA73-18A2-42DD-8B1B-FC4DEF1032C0}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1719","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27639,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600052","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.143,21.5921]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1719,"OGC_FID":1719,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{9C33180B-7911-4C4B-B4F3-2B5B326EA6F7}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1720","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27640,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600053","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1436,21.585]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1720,"OGC_FID":1720,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{38D7CB76-1872-4C42-BDBC-7D4D67CC8F2B}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1721","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27641,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600054","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1396,21.5922]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1721,"OGC_FID":1721,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{E8BCB823-D4C9-41AE-BD34-F438DD63409C}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1722","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27642,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600055","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.138,21.5733]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1722,"OGC_FID":1722,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{569CF0DA-D561-4BF9-B646-C0664C51286E}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1723","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27643,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600056","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1352,21.5978]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1723,"OGC_FID":1723,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{44E4A816-6F99-458D-AC00-3D357CAAD4CB}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1724","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27644,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600057","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1384,21.5977]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1724,"OGC_FID":1724,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{9EFEB1F2-45E0-4639-A318-C36221D927B4}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1725","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27645,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600058","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1411,21.5935]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1725,"OGC_FID":1725,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{0508EBA3-441C-4B00-BBFA-DD8172D17744}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1726","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27646,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600059","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1403,21.5843]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1726,"OGC_FID":1726,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{A04C5AC4-198D-4241-9E14-5A3E6B1F4E7A}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1727","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27647,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600060","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1288,21.608]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1727,"OGC_FID":1727,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{EFE48CCC-6B9C-4CBE-8B3A-A3EB7FB4802D}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1728","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27648,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600061","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1395,21.577]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1728,"OGC_FID":1728,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{BC759645-AE3E-4BC9-BE71-7AE1F81E5CF2}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1729","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27649,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600062","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1395,21.5997]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1729,"OGC_FID":1729,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{1247786F-54BD-4324-8022-ECBA6A38372A}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1730","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27650,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600063","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1333,21.5774]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1730,"OGC_FID":1730,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{2BF81ADD-5074-4060-B1A4-487C572EA103}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1731","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27651,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600064","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1434,21.5799]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1731,"OGC_FID":1731,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{2923516C-76C2-41A1-B99B-D2D26A5F67DC}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1732","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27652,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600065","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1424,21.5769]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1732,"OGC_FID":1732,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{A6488299-37B3-416C-A547-E63514A28A08}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1733","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27653,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600066","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1405,21.574]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1733,"OGC_FID":1733,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{9201997B-D229-47E2-BF28-953B39B7CEF7}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1734","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27654,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600067","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1439,21.5923]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1734,"OGC_FID":1734,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{C8E45436-ACE8-41FD-B0F9-CE49BDED39EA}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1735","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27655,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600068","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1401,21.5976]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1735,"OGC_FID":1735,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{02468042-E336-4C21-86BB-BAE1309680BE}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1736","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27656,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600069","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1321,21.6088]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1736,"OGC_FID":1736,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{04577249-7FCF-42C2-A9F6-338C3D9DA451}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1737","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27657,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600070","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1312,21.5856]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1737,"OGC_FID":1737,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{940A56DE-5490-4BB0-86F7-8032AA9CC8B2}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1738","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27658,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600071","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1434,21.5785]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1738,"OGC_FID":1738,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{6A18AFA4-50FA-488C-882B-FAD0B8673059}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1739","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27659,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600072","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1313,21.5935]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1739,"OGC_FID":1739,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{B57961D3-03D1-4955-A280-9E0194EFFA84}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1740","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27660,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600073","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1312,21.5918]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1740,"OGC_FID":1740,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{44F24711-B5DC-4D1F-B218-D6AA9A8353A1}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1741","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27661,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600074","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1384,21.5915]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1741,"OGC_FID":1741,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{C93D99DB-9F82-432E-86F6-BF1DDB3CD491}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1742","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27662,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600075","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1431,21.5921]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1742,"OGC_FID":1742,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{BBFECD28-F88C-4E1D-8055-015D1EA60C75}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1743","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27663,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600076","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1344,21.5949]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1743,"OGC_FID":1743,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{C8BC4C0C-F8FF-4065-9A69-4DFAB896FE1E}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1744","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27664,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600077","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1311,21.5862]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1744,"OGC_FID":1744,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{7B202747-ADA8-4AA4-8C40-31AF34BC2501}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1745","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27665,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600078","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.137,21.5872]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1745,"OGC_FID":1745,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{4F83B19E-1C55-4D95-97F1-4433DF388641}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1746","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27666,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600079","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1321,21.598]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1746,"OGC_FID":1746,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{D0719452-4853-42F1-AF2A-11C9122217EA}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1747","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27667,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600080","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1368,21.5915]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1747,"OGC_FID":1747,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{A27A7A57-E758-416D-B267-5F93AD4EFA56}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1748","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27668,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600081","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1238,21.6069]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1748,"OGC_FID":1748,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{6CEC26CF-A701-43CD-BC3A-177304E2D662}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1749","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27669,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600082","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1335,21.6091]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1749,"OGC_FID":1749,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{D8081E39-C786-4D5E-B906-6F15724CD44D}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1750","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27670,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600083","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1312,21.5943]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1750,"OGC_FID":1750,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{CF651E5A-15B0-4653-B1B1-82D77B10B189}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1751","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27671,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600084","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1393,21.5974]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1751,"OGC_FID":1751,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{01D629FB-426B-430B-BDD5-22AB131A52C5}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1752","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27672,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600085","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1397,21.5948]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1752,"OGC_FID":1752,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{4BD46DEE-AA9A-4D8E-9DF1-76BC463A4FD5}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1753","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27673,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600086","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1433,21.5758]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1753,"OGC_FID":1753,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{DD992F4F-C27D-43A6-A1D2-77F436894FAC}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1754","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27674,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600087","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1437,21.5971]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1754,"OGC_FID":1754,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{D410EAD3-17D7-49ED-8DFF-809378A5CBAD}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1755","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27675,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600088","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1412,21.6096]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1755,"OGC_FID":1755,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{B9CDCCFC-4661-4028-877B-D7BFE7185A4D}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1756","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27676,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600089","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1403,21.5922]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1756,"OGC_FID":1756,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{1C0CD8CC-ECD6-45F2-B34A-0DDA62446205}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1757","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27677,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600090","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1426,21.6035]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1757,"OGC_FID":1757,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{C8B98CF6-2508-44AA-9D06-FBE054B05288}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1758","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27678,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600091","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1413,21.5974]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1758,"OGC_FID":1758,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{926B61C2-70BC-4E42-8DA9-02947D0F412B}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1759","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27679,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600092","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1313,21.5885]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1759,"OGC_FID":1759,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{569453D3-6514-47E8-9F4A-E6C656D325C8}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1760","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27680,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600093","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1361,21.5978]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1760,"OGC_FID":1760,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{B188459C-C023-4067-A35E-C9B8670BBB5B}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1761","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27681,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600094","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1316,21.5917]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1761,"OGC_FID":1761,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{226E4983-92F1-4740-BE96-6D07BC2C118D}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1762","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27682,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600095","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1314,21.5874]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1762,"OGC_FID":1762,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{AA84AF32-7E60-415F-B456-93688F91A8A1}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1763","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27683,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600096","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1265,21.5962]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1763,"OGC_FID":1763,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{1F3782BF-E981-407F-89AE-0C78C8953F02}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1764","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27684,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600097","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1359,21.5773]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1764,"OGC_FID":1764,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{43557DBC-7B22-4AA5-B59E-595E661F9276}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1765","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27685,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600098","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1351,21.5873]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1765,"OGC_FID":1765,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{DFBA65ED-EC1A-46AA-B8C8-1214844DADCE}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1766","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27686,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600099","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1267,21.5723]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1766,"OGC_FID":1766,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{C3A9C84A-1EBF-45EA-915A-49D856D8B255}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1767","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27687,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600100","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.138,21.5859]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1767,"OGC_FID":1767,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{40B5F538-094F-488E-BF19-F710F762BA2F}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1768","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27688,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600101","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1224,21.6066]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1768,"OGC_FID":1768,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{EC0FFC9C-8D88-4AD0-92B5-6D98C9E23060}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1769","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27689,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600102","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1383,21.5985]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1769,"OGC_FID":1769,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{4D3518C9-852B-410A-A844-06C490C4A366}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1770","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27690,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600103","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1307,21.5811]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1770,"OGC_FID":1770,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{CBD6BFBD-B8A9-4011-9843-3915D6E1A66F}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1771","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27691,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600104","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1313,21.595]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1771,"OGC_FID":1771,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{AA930AC6-85F5-4203-930B-2B18D626D628}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1772","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27692,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600105","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1389,21.594]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1772,"OGC_FID":1772,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{E1D5103C-B061-40C6-A457-D8001C1C90D0}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1773","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27693,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600106","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1316,21.5918]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1773,"OGC_FID":1773,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{E8EF097F-3CAD-41FA-8299-6040A43D751A}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1774","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27694,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600107","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1369,21.5845]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1774,"OGC_FID":1774,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{8F77C3CA-6DD0-4CAD-A230-2CBCAFC80D95}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1775","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27695,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600108","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1312,21.5933]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1775,"OGC_FID":1775,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{5D2FC94A-605B-408A-A357-48EEB0D13FC3}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1776","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27696,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600109","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1336,21.5916]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1776,"OGC_FID":1776,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{9BD51C25-9B10-44D0-A553-EDF40D4E5B19}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1777","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27697,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600110","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1332,21.5722]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1777,"OGC_FID":1777,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{D9B060EF-3DEC-4DF8-B4AA-15E122390323}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1778","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27698,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600111","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1221,21.6065]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1778,"OGC_FID":1778,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{B47EF71D-C470-4872-8E88-5F0524C49078}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1779","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27699,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600112","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1375,21.5978]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1779,"OGC_FID":1779,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{05952CFA-759D-44D9-B857-AA5883AAB1FD}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1780","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27700,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600113","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1415,21.6078]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1780,"OGC_FID":1780,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{68F85288-966E-4C7B-9663-B7308CE75F38}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1781","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27701,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600114","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1312,21.5903]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1781,"OGC_FID":1781,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{FB7238F4-285A-496A-801A-7AC05E5B3643}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1782","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27702,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600115","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1439,21.5922]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1782,"OGC_FID":1782,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{DB1BC93E-40E4-49EF-9049-2E0B74059FD2}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1783","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27703,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600116","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1442,21.5986]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1783,"OGC_FID":1783,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{608F188C-DF7B-4121-97F6-E3E0B5C358F2}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1784","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27704,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600117","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1432,21.6017]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1784,"OGC_FID":1784,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{FF4C0CB9-E963-40E4-8706-E8C6CE1344BF}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1785","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27705,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600118","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1313,21.5972]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1785,"OGC_FID":1785,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{8C347B17-46A5-485A-B38E-D9CD828363E9}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1786","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27706,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600119","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1272,21.5812]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1786,"OGC_FID":1786,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{7E6577C1-9A5B-46CE-ACF9-6DF6D923894B}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1787","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27707,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600120","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1377,21.5772]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1787,"OGC_FID":1787,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{E68A60B2-0706-45A8-B8B2-5F3B9584687F}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1788","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27708,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600121","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1437,21.5866]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1788,"OGC_FID":1788,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{9A66D1B7-9EFB-417B-8BE2-4DFFFB198218}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1789","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27709,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600122","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1265,21.5953]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1789,"OGC_FID":1789,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{737DFA36-4EAF-4C4F-A80A-B9A06064B511}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1790","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27710,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600123","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1394,21.5864]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1790,"OGC_FID":1790,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{E2414652-FB8E-4C56-A8B5-1615EECB3E74}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1791","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27711,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600124","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1268,21.5735]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1791,"OGC_FID":1791,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{D1D9D505-7002-45B4-ACBA-4F95BF10BF3D}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1792","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27712,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600125","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1271,21.5791]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1792,"OGC_FID":1792,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{DF914497-0DE5-4284-B83D-8BEB0E7A0D94}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1793","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27713,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600126","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1384,21.5914]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1793,"OGC_FID":1793,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{33B769A1-2EF5-4C3F-B84A-9E74D0FA0863}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1794","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27714,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600127","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1389,21.5771]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1794,"OGC_FID":1794,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{C3D8159E-7412-43FC-8CCE-77DE9762A734}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1795","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27715,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600128","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1396,21.5934]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1795,"OGC_FID":1795,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{86CBF592-E829-4892-83AF-CAE4BC454F47}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1796","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27716,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600129","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1411,21.5947]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1796,"OGC_FID":1796,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{70F2909C-C253-4A93-AF4D-9CD7063BE8A7}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1797","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27717,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600130","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1432,21.575]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1797,"OGC_FID":1797,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{5910A159-0D7C-441E-96DE-0E2227E29D77}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1798","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27718,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600131","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1347,21.5845]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1798,"OGC_FID":1798,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{754A7DA6-42C4-43AB-9CF5-35951BAC3641}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1799","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27719,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600132","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1311,21.5871]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1799,"OGC_FID":1799,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{157F59C8-8062-4F03-91F6-7094AEA449B7}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1800","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27720,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600133","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1337,21.5979]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1800,"OGC_FID":1800,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{163955C4-74DC-4A52-A631-11567E770682}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1801","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27721,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600134","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1313,21.5965]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1801,"OGC_FID":1801,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{B1A3C104-3318-411E-9C97-7385E326BCE0}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1802","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27722,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600135","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1394,21.5871]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1802,"OGC_FID":1802,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{E7D3180E-CC37-49CE-A467-D1F418277E53}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1803","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27723,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600136","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1382,21.5948]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1803,"OGC_FID":1803,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{1C984AF9-6BDB-47FF-95A5-171C54C5E893}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1804","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27724,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600137","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1311,21.5846]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1804,"OGC_FID":1804,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{AD7B9C64-04E1-438E-916D-35639FD763A5}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1805","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27725,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600138","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1311,21.5882]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1805,"OGC_FID":1805,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{474CCE94-0576-4688-9A2B-A405A2AA515C}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1806","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27726,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600139","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1433,21.5769]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1806,"OGC_FID":1806,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{A6FF9C3A-7D21-4990-9A12-8855B9966D0E}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1807","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27727,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600140","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1367,21.5978]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1807,"OGC_FID":1807,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{DF689241-2C62-4504-A4DD-B11C7392DB57}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1808","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27728,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600141","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1272,21.581]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1808,"OGC_FID":1808,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{6111492C-508E-49E1-9EB5-FED55BA22A4A}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1809","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27729,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600142","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.141,21.5928]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1809,"OGC_FID":1809,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{D1EFA18C-FEF2-458B-8FB3-D7990ED67F16}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1810","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27730,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600143","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1336,21.5917]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1810,"OGC_FID":1810,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{A5318727-95D9-4B8D-821D-87DA5EF21104}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1811","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27731,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600144","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1312,21.5911]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1811,"OGC_FID":1811,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{14D49F31-005C-4F7D-A637-BB20DD49895E}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1812","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27732,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600145","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1359,21.5949]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1812,"OGC_FID":1812,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{7CE51ADA-85D1-4D22-AE97-CCAD00F04BD8}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1813","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27733,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600146","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1312,21.5885]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1813,"OGC_FID":1813,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{8FB381B4-FE52-4043-A1F8-877580CFAC39}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1814","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27734,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600147","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.127,21.6076]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1814,"OGC_FID":1814,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{85526228-F678-4A2C-B167-83073B1B4054}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1815","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27735,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600148","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1387,21.5865]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1815,"OGC_FID":1815,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{E98FE37E-9F8C-4B14-B2D2-DFEAF5837BB6}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1816","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27736,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600149","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1401,21.599]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1816,"OGC_FID":1816,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{CCB74EAE-8AF2-4DB8-B01B-426DD7BA018D}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1817","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27737,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600150","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1435,21.5973]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1817,"OGC_FID":1817,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{49EE9EC4-93B6-431B-83C0-1525C73350D6}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1818","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27738,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600151","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1403,21.5843]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1818,"OGC_FID":1818,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{49F9AD98-E252-4484-9ABB-7A0FFE56A043}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1819","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27739,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600152","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1405,21.577]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1819,"OGC_FID":1819,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{767DFC3E-2A8C-410E-8378-4619B6CD5422}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1820","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27740,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600153","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1266,21.5981]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1820,"OGC_FID":1820,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{D2530938-DE2C-45B9-8BAC-38F99A20E9FA}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1821","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27741,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600154","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1279,21.5775]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1821,"OGC_FID":1821,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{5E8F4112-548D-4788-9BAB-78E360D5F109}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1822","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27742,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600155","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1311,21.5816]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1822,"OGC_FID":1822,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{9A6470D4-7FF9-41F2-BD79-05D19718F0DD}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1823","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27743,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600156","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.137,21.6099]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1823,"OGC_FID":1823,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{A88C5FA8-D06B-43D9-9D9F-DBE1514D1AAA}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1824","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27744,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600157","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1313,21.5926]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1824,"OGC_FID":1824,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{BF2524E6-CCFD-4707-9E25-093DB579BAAE}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1825","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27745,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600158","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1255,21.6073]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1825,"OGC_FID":1825,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{4EBF7029-E916-4221-96B8-246B96905D7C}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1826","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27746,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600159","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1316,21.5722]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1826,"OGC_FID":1826,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{ABAF6933-3E11-4339-AB0A-30C41090A01A}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1827","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27747,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600160","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1402,21.5997]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1827,"OGC_FID":1827,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{10C443FB-E747-4E5D-858E-33C58D0C2E39}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1828","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27748,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600161","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1311,21.5837]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1828,"OGC_FID":1828,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{CBFE54DF-E9FC-457D-9119-A2D28CDE156D}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1829","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27749,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600162","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1313,21.5943]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1829,"OGC_FID":1829,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{065985AC-9E5D-4AED-BDE6-8D22032E7E17}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1830","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27750,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600163","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1341,21.5723]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1830,"OGC_FID":1830,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{2358D172-101F-4825-A503-8FFE69FDEC4C}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1831","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27751,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600164","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1349,21.5724]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1831,"OGC_FID":1831,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{F5D403A5-86DE-460B-A170-E547BF4C57C4}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1832","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27752,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600165","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1372,21.5731]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1832,"OGC_FID":1832,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{D173207D-5C9C-48EE-8C51-F8972701D990}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1833","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27753,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600166","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1318,21.6084]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1833,"OGC_FID":1833,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{4AAB009D-1CFE-4794-BB20-45CB8D6AB955}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1834","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27754,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600167","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1405,21.5974]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1834,"OGC_FID":1834,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{B9818459-B5A5-461D-B075-8782C9EE6EC4}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1835","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27755,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600168","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1269,21.5758]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1835,"OGC_FID":1835,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{9F9B53FB-352C-485C-9AD7-633B83A50F56}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1836","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27756,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600169","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1369,21.5773]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1836,"OGC_FID":1836,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{5B2E53E4-4739-4528-BECC-FB2B4D6657B8}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1837","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27757,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600170","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.141,21.5917]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1837,"OGC_FID":1837,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{67D58FC9-BFD0-41D5-8799-7AAD041E8884}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1838","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27758,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600171","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1415,21.577]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1838,"OGC_FID":1838,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{A1CC21CC-47C9-4749-B1C4-57D588D20689}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1839","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27759,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600172","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1269,21.5747]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1839,"OGC_FID":1839,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{CF63456F-C6EE-4CB3-B2EC-93578017A3CF}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1840","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27760,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600173","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1439,21.5912]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1840,"OGC_FID":1840,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{F454F480-FEC5-4BAC-80D3-85C45E59CB43}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1841","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27761,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600174","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1357,21.6096]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1841,"OGC_FID":1841,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{C8975212-4DC3-443F-9E6E-532263A5BB33}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1842","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27762,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600175","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1424,21.5975]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1842,"OGC_FID":1842,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{ADAA17A9-706B-4DBC-ADCE-5F61F086C8CD}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1843","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27763,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600176","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1311,21.5856]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1843,"OGC_FID":1843,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{33784373-5BBD-4896-AA7B-D1D1499A9F47}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1844","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27764,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600177","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1329,21.5979]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1844,"OGC_FID":1844,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{B459B92E-F974-472B-BC15-5F9E7ACB687C}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1845","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27765,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600178","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1324,21.5722]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1845,"OGC_FID":1845,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{28C10915-A4C6-4C5C-BCF7-2B03A6A0F8B4}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1846","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27766,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600179","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1435,21.5808]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1846,"OGC_FID":1846,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{DBE7F83F-29C8-4365-B1E3-1AE2AA045EF8}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1847","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27767,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600180","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1379,21.5852]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1847,"OGC_FID":1847,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{DD605C47-F5AB-40E7-9A59-5909684BEC91}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1848","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27768,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600181","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1326,21.5774]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1848,"OGC_FID":1848,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{F8CB47A8-3727-4955-9D25-D440F5CDEA68}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1849","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27769,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600182","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1269,21.5742]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1849,"OGC_FID":1849,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{025AEE59-4CB0-48DA-BE79-488FC8F6F43D}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1850","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27770,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600183","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1368,21.5915]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1850,"OGC_FID":1850,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{74BAAAD5-319F-4B58-A27D-AE7C11F80F13}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1851","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27771,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600184","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1294,21.5981]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1851,"OGC_FID":1851,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{71AD9C9C-A01B-4340-B4E6-408ECFBDA512}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1852","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27772,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600185","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1242,21.5907]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1852,"OGC_FID":1852,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{3584B0AD-D018-4BD7-8652-DB1296BC7F9B}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1853","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27773,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600186","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1401,21.5977]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1853,"OGC_FID":1853,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{74667355-2E97-44E5-9725-B87A96B4B51B}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1854","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27774,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600187","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.141,21.6107]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1854,"OGC_FID":1854,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{9717056D-8835-4052-A070-C78F30D71E39}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1855","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27775,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600188","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1395,21.6029]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1855,"OGC_FID":1855,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{421841B4-20E0-4CF6-B1EB-96F95498A35A}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1856","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27776,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600189","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1298,21.5723]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1856,"OGC_FID":1856,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{4B21B551-48D3-4EEC-8EF6-64BCD345E250}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1857","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27777,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600190","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1381,21.5844]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1857,"OGC_FID":1857,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{1ACB061E-4C47-4F1C-9D7E-93A1E4B8DB10}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1858","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27778,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600191","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1422,21.5842]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1858,"OGC_FID":1858,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{955C8197-214C-489E-A160-5565D3D217B3}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1859","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27779,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600192","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1313,21.598]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1859,"OGC_FID":1859,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{D9CE1F52-69FC-4F57-922B-99DFA06E8774}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1860","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27780,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600193","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.128,21.5981]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1860,"OGC_FID":1860,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{C6707F14-D601-4331-94C2-31651111A74C}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1861","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27781,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600194","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1396,21.5738]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1861,"OGC_FID":1861,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{48F3581B-6D2C-4CA3-AD17-34A7761E936B}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1862","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27782,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600195","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1438,21.5998]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1862,"OGC_FID":1862,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{A3128DFD-7C8A-43E7-AB17-4507AF9CA61F}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1863","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27783,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600196","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1312,21.5891]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1863,"OGC_FID":1863,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{EC6E5521-C853-4D43-86C7-43364576D901}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1864","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27784,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600197","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.141,21.5919]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1864,"OGC_FID":1864,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{01285506-C1AD-4641-A184-2F85F5A96D52}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1865","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27785,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600198","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.127,21.5724]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1865,"OGC_FID":1865,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{49D6237B-6ABE-4EC8-A078-0CB893543AB1}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1866","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27786,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600199","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1312,21.5875]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1866,"OGC_FID":1866,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{EC54600A-5E7E-4F99-B978-E1A5A9944AD6}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1867","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27787,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600200","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1407,21.6107]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1867,"OGC_FID":1867,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{6BB8806F-E993-4620-907C-D3B394278B43}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1868","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27788,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600201","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1279,21.5724]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1868,"OGC_FID":1868,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{67F7018F-EF3E-465A-9A1C-E7AE5AF22E7B}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1869","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27789,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600202","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1395,21.601]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1869,"OGC_FID":1869,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{792DB1AC-5697-483C-86A8-73537A744B62}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1870","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27790,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600203","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1414,21.6084]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1870,"OGC_FID":1870,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{D03A335A-BC3D-42D6-B390-0DBFBC2C410A}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1871","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27791,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600204","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1311,21.5862]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1871,"OGC_FID":1871,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{5D77AF10-40C2-4FBC-9C85-CDBF42FDA394}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1872","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27792,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600205","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1353,21.5773]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1872,"OGC_FID":1872,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{0BA9E9F8-A3DC-429D-97A4-3520683063FE}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1873","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27793,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600206","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.131,21.5774]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1873,"OGC_FID":1873,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{85688B31-355B-4849-9AFF-C36E9AE5EB0A}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1874","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27794,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600207","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1401,21.5979]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1874,"OGC_FID":1874,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{E0ABBAD3-D9A3-481C-BE7F-10B52D9CBAB6}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1875","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27795,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600208","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1404,21.594]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1875,"OGC_FID":1875,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{A1EB7962-C5F5-4D10-AC8A-23306AECA890}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1876","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27796,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600209","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.127,21.5776]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1876,"OGC_FID":1876,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{7F333F62-20BA-4A44-A999-2EC803F3FED3}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1877","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27797,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600210","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1392,21.5977]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1877,"OGC_FID":1877,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{F9981624-A387-4029-8062-28AE84A41FE5}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1878","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27798,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600211","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.132,21.5774]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1878,"OGC_FID":1878,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{7449ABD4-D4A5-4073-897E-6AECFCD96A45}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1879","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27799,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600212","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1405,21.5976]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1879,"OGC_FID":1879,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001116","districtbaladi":"10007863","duration":null,"elevation":null,"globalid":"{995D25A8-A625-4404-93B1-A437E244DBE9}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1880","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001013","objectid_1":27800,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200111600213","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.1344,21.5979]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1880,"OGC_FID":1880,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001124","districtbaladi":"10007801","duration":null,"elevation":null,"globalid":"{266583F0-67CD-4419-9C55-0A5F0FC032E1}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1881","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27801,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200112400001","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.243,21.5932]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1881,"OGC_FID":1881,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001124","districtbaladi":"10007801","duration":null,"elevation":null,"globalid":"{EDB22F37-4816-4A86-A8EC-860209F7BA70}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1882","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27802,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200112400002","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2396,21.5897]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1882,"OGC_FID":1882,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001124","districtbaladi":"10007801","duration":null,"elevation":null,"globalid":"{8FCE995D-3766-4576-BC8C-BB07E9279AE5}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1883","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27803,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200112400003","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2303,21.5867]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1883,"OGC_FID":1883,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001124","districtbaladi":"10007801","duration":null,"elevation":null,"globalid":"{8BDAF7B1-396E-4554-9757-B572AE8677F7}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1884","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27804,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200112400004","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2383,21.5887]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1884,"OGC_FID":1884,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001124","districtbaladi":"10007801","duration":null,"elevation":null,"globalid":"{CB1B913D-DA9E-4169-84C9-58795B15C3CD}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1885","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27805,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200112400005","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2297,21.5835]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1885,"OGC_FID":1885,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001124","districtbaladi":"10007801","duration":null,"elevation":null,"globalid":"{DF839D3A-A7C0-4316-B179-AC70CA966043}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1886","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27806,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200112400006","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2408,21.5906]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1886,"OGC_FID":1886,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001124","districtbaladi":"10007801","duration":null,"elevation":null,"globalid":"{7CFCFD9E-92E9-4F57-ABD1-3A0483931439}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1887","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27807,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200112400007","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2403,21.578]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1887,"OGC_FID":1887,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001124","districtbaladi":"10007801","duration":null,"elevation":null,"globalid":"{F1DE53EA-EC25-42C1-AE0D-930F5C48E662}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1888","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27808,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200112400008","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2436,21.5874]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1888,"OGC_FID":1888,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001124","districtbaladi":"10007801","duration":null,"elevation":null,"globalid":"{B3F0C577-0555-446F-A8B7-C15BCCEA7220}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1889","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27809,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200112400009","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2455,21.5947]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1889,"OGC_FID":1889,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001124","districtbaladi":"10007801","duration":null,"elevation":null,"globalid":"{68B99185-DD89-4759-B6EE-7616DC7E53DD}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1890","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27810,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200112400010","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2481,21.5785]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1890,"OGC_FID":1890,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001124","districtbaladi":"10007801","duration":null,"elevation":null,"globalid":"{46273492-0CCB-4F25-88F9-BA82801C8CB5}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1891","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27811,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200112400011","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2393,21.5867]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1891,"OGC_FID":1891,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001124","districtbaladi":"10007801","duration":null,"elevation":null,"globalid":"{F5288C92-0B07-4730-B62C-B0FD8E2CBFE9}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1892","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27812,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200112400012","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2396,21.5885]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1892,"OGC_FID":1892,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001124","districtbaladi":"10007801","duration":null,"elevation":null,"globalid":"{42DBB398-880F-4EBF-9CA1-82F2EA73B7AB}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1893","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27813,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200112400013","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2368,21.5839]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1893,"OGC_FID":1893,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001124","districtbaladi":"10007801","duration":null,"elevation":null,"globalid":"{6EC524C8-5100-451C-A7C6-2982431CF450}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1894","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27814,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200112400014","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2356,21.5907]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1894,"OGC_FID":1894,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001124","districtbaladi":"10007801","duration":null,"elevation":null,"globalid":"{A0935643-4EBE-4863-9D47-7F88CB6082D9}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1895","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27815,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200112400015","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2337,21.5903]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1895,"OGC_FID":1895,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001124","districtbaladi":"10007801","duration":null,"elevation":null,"globalid":"{F254B5CA-5278-4BB3-8ED0-FD76019A73A9}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1896","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27816,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200112400016","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2326,21.5907]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1896,"OGC_FID":1896,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001124","districtbaladi":"10007801","duration":null,"elevation":null,"globalid":"{9D894A44-CE79-4DB4-8394-44AA70100C57}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1897","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27817,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200112400017","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2445,21.5885]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1897,"OGC_FID":1897,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001124","districtbaladi":"10007801","duration":null,"elevation":null,"globalid":"{74296B70-40DF-45F0-B47D-572C65240679}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1898","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27818,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200112400018","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2302,21.586]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1898,"OGC_FID":1898,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001124","districtbaladi":"10007801","duration":null,"elevation":null,"globalid":"{C383A539-7DE9-4BE4-97C4-AE27FBA2E01F}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1899","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27819,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200112400019","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.241,21.5912]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1899,"OGC_FID":1899,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001124","districtbaladi":"10007801","duration":null,"elevation":null,"globalid":"{8C8A08DE-F671-46C0-82E4-0F17CCE2DE9C}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1900","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27820,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200112400020","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2481,21.5791]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1900,"OGC_FID":1900,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001124","districtbaladi":"10007801","duration":null,"elevation":null,"globalid":"{3E5B4FF9-54C2-41B4-8CC5-7A4244C4D4C3}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1901","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27821,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200112400021","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2462,21.5803]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1901,"OGC_FID":1901,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001124","districtbaladi":"10007801","duration":null,"elevation":null,"globalid":"{D401C809-078F-4E52-BCC3-5A347E21F69A}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1902","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27822,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200112400022","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2439,21.5797]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1902,"OGC_FID":1902,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001124","districtbaladi":"10007801","duration":null,"elevation":null,"globalid":"{1EDBB804-874F-4545-A0E8-900877E5E153}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1903","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27823,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200112400023","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.238,21.5857]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1903,"OGC_FID":1903,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001124","districtbaladi":"10007801","duration":null,"elevation":null,"globalid":"{16C54CAD-A192-460E-AEE5-15610AD3D0A4}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1904","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27824,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200112400024","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2373,21.5815]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1904,"OGC_FID":1904,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001124","districtbaladi":"10007801","duration":null,"elevation":null,"globalid":"{ABBBF931-06D8-4C08-951F-7C3D433FFF3C}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1905","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27825,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200112400025","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2302,21.5905]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1905,"OGC_FID":1905,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001124","districtbaladi":"10007801","duration":null,"elevation":null,"globalid":"{8B86C8BD-0108-49DD-9956-1AAC62D1A12A}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1906","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27826,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200112400026","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2292,21.5865]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1906,"OGC_FID":1906,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001124","districtbaladi":"10007801","duration":null,"elevation":null,"globalid":"{F0BB7FCB-64EE-46A7-A7E1-C4C2BAB70139}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1907","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27827,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200112400027","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2327,21.5901]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1907,"OGC_FID":1907,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001124","districtbaladi":"10007801","duration":null,"elevation":null,"globalid":"{66F96464-3408-4682-911F-0AFF6024A32B}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1908","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27828,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200112400028","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.238,21.5789]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1908,"OGC_FID":1908,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001124","districtbaladi":"10007801","duration":null,"elevation":null,"globalid":"{DE83402C-2A0E-45C5-ABD6-26618F32F500}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1909","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27829,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200112400029","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2397,21.5858]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1909,"OGC_FID":1909,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001124","districtbaladi":"10007801","duration":null,"elevation":null,"globalid":"{0513868C-47B5-4990-BB39-B7CE004C330D}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1910","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27830,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200112400030","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.236,21.5855]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1910,"OGC_FID":1910,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001124","districtbaladi":"10007801","duration":null,"elevation":null,"globalid":"{81D693D4-0F9A-4224-B606-A16F4397714F}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1911","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27831,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200112400031","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2312,21.5862]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1911,"OGC_FID":1911,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001124","districtbaladi":"10007801","duration":null,"elevation":null,"globalid":"{8DCAD9FC-C6C0-4706-832C-DCA228113253}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1912","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27832,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200112400032","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2477,21.5933]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1912,"OGC_FID":1912,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001124","districtbaladi":"10007801","duration":null,"elevation":null,"globalid":"{41A63B13-E82F-4BCA-BB10-2E5F0069565B}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1913","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27833,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200112400033","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2375,21.584]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1913,"OGC_FID":1913,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001124","districtbaladi":"10007801","duration":null,"elevation":null,"globalid":"{0540E8BF-1E89-4175-85A0-EE453C609CFA}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1914","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27834,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200112400034","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2426,21.5921]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1914,"OGC_FID":1914,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001124","districtbaladi":"10007801","duration":null,"elevation":null,"globalid":"{709F9E51-3A73-432B-A033-6D54376DCEC8}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1915","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27835,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200112400035","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2471,21.5785]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1915,"OGC_FID":1915,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001124","districtbaladi":"10007801","duration":null,"elevation":null,"globalid":"{50651F48-7A43-48FD-93FF-A7B32E7C9156}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1916","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27836,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200112400036","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2338,21.5897]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1916,"OGC_FID":1916,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001124","districtbaladi":"10007801","duration":null,"elevation":null,"globalid":"{5F533E5D-5A68-4C32-A68D-E840C872260A}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1917","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27837,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200112400037","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2364,21.5846]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1917,"OGC_FID":1917,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001124","districtbaladi":"10007801","duration":null,"elevation":null,"globalid":"{520C636D-59A9-4C9D-8CDE-DF504D0F17D1}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1918","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27838,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200112400038","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2346,21.5909]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1918,"OGC_FID":1918,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001124","districtbaladi":"10007801","duration":null,"elevation":null,"globalid":"{47F13DDF-4DDF-47D3-AAD4-F76538F6AFAC}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1919","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27839,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200112400039","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2296,21.5901]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1919,"OGC_FID":1919,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001124","districtbaladi":"10007801","duration":null,"elevation":null,"globalid":"{C5291088-D831-436F-9B31-3CF10FFFC39E}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1920","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27840,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200112400040","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2406,21.59]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1920,"OGC_FID":1920,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001124","districtbaladi":"10007801","duration":null,"elevation":null,"globalid":"{0FE31FB4-15B0-4A8A-A61A-96DA2A4AA244}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1921","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27841,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200112400041","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2385,21.5845]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1921,"OGC_FID":1921,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001124","districtbaladi":"10007801","duration":null,"elevation":null,"globalid":"{4BB6E8B3-AFE6-4CBA-A969-49EAABB281FB}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1922","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27842,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200112400042","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2438,21.5869]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1922,"OGC_FID":1922,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001124","districtbaladi":"10007801","duration":null,"elevation":null,"globalid":"{C6EB5C27-FC96-41B5-B238-CE3D54398BC3}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1923","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27843,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200112400043","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2458,21.5754]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1923,"OGC_FID":1923,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001124","districtbaladi":"10007801","duration":null,"elevation":null,"globalid":"{79F8FDBC-D9B0-48B2-8B4C-12C8C71C9ECC}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1924","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27844,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200112400044","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2414,21.5781]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1924,"OGC_FID":1924,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001124","districtbaladi":"10007801","duration":null,"elevation":null,"globalid":"{B4B4ECE5-6FCC-4B7E-99A6-D9CEAD3E5FFE}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1925","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27845,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200112400045","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2434,21.5945]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1925,"OGC_FID":1925,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001124","districtbaladi":"10007801","duration":null,"elevation":null,"globalid":"{34FE1AEF-B147-4F58-87A1-6425C950FAFD}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1926","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27846,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200112400046","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2356,21.5818]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1926,"OGC_FID":1926,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001124","districtbaladi":"10007801","duration":null,"elevation":null,"globalid":"{DAD20709-5C02-498F-B602-AB0CC11DFF94}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1927","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27847,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200112400047","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2359,21.5812]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1927,"OGC_FID":1927,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001124","districtbaladi":"10007801","duration":null,"elevation":null,"globalid":"{03CDE72F-41C2-4053-AD29-D1A4BF00458B}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1928","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27848,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200112400048","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2313,21.5895]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1928,"OGC_FID":1928,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001124","districtbaladi":"10007801","duration":null,"elevation":null,"globalid":"{E25F29BA-BA66-4721-AB82-BA9F5126E367}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1929","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27849,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200112400049","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2456,21.589]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1929,"OGC_FID":1929,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001124","districtbaladi":"10007801","duration":null,"elevation":null,"globalid":"{FB69975C-1798-4A9E-B6F2-CA15DDF9CAC1}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1930","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27850,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200112400050","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2433,21.5784]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1930,"OGC_FID":1930,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001124","districtbaladi":"10007801","duration":null,"elevation":null,"globalid":"{BEBB13DC-A121-445C-91CE-D832B437D663}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1931","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27851,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200112400051","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2399,21.5785]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1931,"OGC_FID":1931,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001124","districtbaladi":"10007801","duration":null,"elevation":null,"globalid":"{204CC189-51B7-4310-A36D-9397CD8DFDAE}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1932","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27852,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200112400052","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2422,21.5942]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1932,"OGC_FID":1932,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001124","districtbaladi":"10007801","duration":null,"elevation":null,"globalid":"{5C72A89A-0A51-4EE9-B270-3EA974D7CFBC}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1933","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27853,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200112400053","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2466,21.5937]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1933,"OGC_FID":1933,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001124","districtbaladi":"10007801","duration":null,"elevation":null,"globalid":"{C0A9E007-677D-4C76-A5AB-56F13F5EA082}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1934","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27854,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200112400054","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2458,21.5923]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1934,"OGC_FID":1934,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001124","districtbaladi":"10007801","duration":null,"elevation":null,"globalid":"{5D3C267B-BCE1-444A-96E6-6FFB0B0D3B9E}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1935","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27855,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200112400055","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2341,21.5887]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1935,"OGC_FID":1935,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001124","districtbaladi":"10007801","duration":null,"elevation":null,"globalid":"{14473BE5-A19D-4DBB-9646-01C307A2D520}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1936","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27856,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200112400056","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2469,21.5895]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1936,"OGC_FID":1936,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001124","districtbaladi":"10007801","duration":null,"elevation":null,"globalid":"{9CC425F3-D61E-474A-A33B-626CC6549859}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1937","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27857,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200112400057","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.243,21.5872]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1937,"OGC_FID":1937,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001124","districtbaladi":"10007801","duration":null,"elevation":null,"globalid":"{CA1C7721-68E8-4A3B-B300-F14820604A1C}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1938","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27858,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200112400058","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2362,21.5838]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1938,"OGC_FID":1938,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001124","districtbaladi":"10007801","duration":null,"elevation":null,"globalid":"{4440790C-ADD5-4C32-B2D6-06E5CDA43B7A}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1939","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27859,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200112400059","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2455,21.5804]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1939,"OGC_FID":1939,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001124","districtbaladi":"10007801","duration":null,"elevation":null,"globalid":"{01BA0B35-930D-406B-9100-9DBC54825D67}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1940","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27860,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200112400060","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2459,21.5798]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1940,"OGC_FID":1940,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001124","districtbaladi":"10007801","duration":null,"elevation":null,"globalid":"{734D5F0C-D8FE-4AD5-9331-275EEAE78092}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1941","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27861,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200112400061","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2313,21.5785]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1941,"OGC_FID":1941,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001124","districtbaladi":"10007801","duration":null,"elevation":null,"globalid":"{5A581A32-B6E4-4B12-8870-F86C1C5A1465}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1942","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27862,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200112400062","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2338,21.5909]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1942,"OGC_FID":1942,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001124","districtbaladi":"10007801","duration":null,"elevation":null,"globalid":"{53A2FF5F-356D-439C-A48B-195E94A5952E}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1943","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27863,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200112400063","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2368,21.5878]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1943,"OGC_FID":1943,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001124","districtbaladi":"10007801","duration":null,"elevation":null,"globalid":"{50F5300C-4E51-4D04-AB92-7B69207B80AA}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1944","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27864,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200112400064","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.24,21.5902]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1944,"OGC_FID":1944,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001124","districtbaladi":"10007801","duration":null,"elevation":null,"globalid":"{207F60BA-796C-4A38-BDDA-7D605108679B}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1945","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27865,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200112400065","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2487,21.593]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1945,"OGC_FID":1945,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001124","districtbaladi":"10007801","duration":null,"elevation":null,"globalid":"{E9E95E20-00EE-4F3C-AE7B-384435A48C06}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1946","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27866,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200112400066","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2443,21.5756]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1946,"OGC_FID":1946,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001124","districtbaladi":"10007801","duration":null,"elevation":null,"globalid":"{D0BB2E96-5636-4506-BF83-E5B171C43F86}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1947","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27867,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200112400067","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2367,21.5909]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1947,"OGC_FID":1947,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001124","districtbaladi":"10007801","duration":null,"elevation":null,"globalid":"{F1C781E6-F5F0-47B0-AF73-7744AA0AE727}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1948","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27868,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200112400068","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2329,21.5892]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1948,"OGC_FID":1948,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001124","districtbaladi":"10007801","duration":null,"elevation":null,"globalid":"{5D44EF4A-3013-4951-9A1F-A323190D3502}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1949","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27869,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200112400069","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2333,21.581]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1949,"OGC_FID":1949,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001124","districtbaladi":"10007801","duration":null,"elevation":null,"globalid":"{8795DF5E-84DE-4EB0-A765-65EE0815066A}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1950","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27870,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200112400070","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2313,21.5889]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1950,"OGC_FID":1950,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001124","districtbaladi":"10007801","duration":null,"elevation":null,"globalid":"{610F4188-5E20-46D7-A4D3-5E67D50C8412}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1951","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27871,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200112400071","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.246,21.5754]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1951,"OGC_FID":1951,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001124","districtbaladi":"10007801","duration":null,"elevation":null,"globalid":"{29DE062C-16FD-4B27-955A-3FCDC2E781FD}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1952","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27872,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200112400072","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2498,21.5931]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1952,"OGC_FID":1952,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001124","districtbaladi":"10007801","duration":null,"elevation":null,"globalid":"{B920D31C-04BD-43B9-9CAE-F23ED7D33341}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1953","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27873,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200112400073","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2463,21.5785]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1953,"OGC_FID":1953,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001124","districtbaladi":"10007801","duration":null,"elevation":null,"globalid":"{0BC775E4-1CF4-456A-8ACB-66EF561829AC}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1954","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27874,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200112400074","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2513,21.591]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1954,"OGC_FID":1954,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001124","districtbaladi":"10007801","duration":null,"elevation":null,"globalid":"{1C9A8CAD-3B5F-411D-890B-8F538502887B}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1955","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27875,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200112400075","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2444,21.5785]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1955,"OGC_FID":1955,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001124","districtbaladi":"10007801","duration":null,"elevation":null,"globalid":"{C511BE28-EE37-4E26-9204-F299B9518391}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1956","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27876,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200112400076","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2506,21.5933]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1956,"OGC_FID":1956,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001124","districtbaladi":"10007801","duration":null,"elevation":null,"globalid":"{66F54785-59C2-462F-B71D-5577990C1E81}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1957","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27877,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200112400077","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.237,21.5832]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1957,"OGC_FID":1957,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001124","districtbaladi":"10007801","duration":null,"elevation":null,"globalid":"{D94EAB11-F5A0-4CD6-BCF5-EA9DD56C46D0}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1958","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27878,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200112400078","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2329,21.5832]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1958,"OGC_FID":1958,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001124","districtbaladi":"10007801","duration":null,"elevation":null,"globalid":"{C133EF05-2E5C-43A1-B5B5-48B82A176075}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1959","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27879,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200112400079","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2448,21.5879]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1959,"OGC_FID":1959,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001124","districtbaladi":"10007801","duration":null,"elevation":null,"globalid":"{7EFFB4BE-6E76-42D2-90D8-DC7ED3597C11}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1960","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27880,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200112400080","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2508,21.5927]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1960,"OGC_FID":1960,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001124","districtbaladi":"10007801","duration":null,"elevation":null,"globalid":"{DF2B0F66-1F8D-4D9D-BF02-C7342AFBD90B}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1961","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27881,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200112400081","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2424,21.5869]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1961,"OGC_FID":1961,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001124","districtbaladi":"10007801","duration":null,"elevation":null,"globalid":"{FA58A8D3-9576-4B95-9C5C-03C72867925A}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1962","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27882,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200112400082","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.239,21.579]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1962,"OGC_FID":1962,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001124","districtbaladi":"10007801","duration":null,"elevation":null,"globalid":"{FBA24292-F928-4B83-BC51-74081A14520A}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1963","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27883,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200112400083","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2355,21.5824]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1963,"OGC_FID":1963,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001124","districtbaladi":"10007801","duration":null,"elevation":null,"globalid":"{94030632-3FBC-4C54-AA48-226A86BF60AE}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1964","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27884,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200112400084","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2438,21.5935]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1964,"OGC_FID":1964,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001124","districtbaladi":"10007801","duration":null,"elevation":null,"globalid":"{4B249248-72B7-4CCF-BF9B-826CDD023E01}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1965","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27885,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200112400085","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2463,21.5791]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1965,"OGC_FID":1965,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001124","districtbaladi":"10007801","duration":null,"elevation":null,"globalid":"{5ED393BC-A9E0-4DF4-B9FE-BE44C6D72BB5}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1966","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27886,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200112400086","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2294,21.5852]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1966,"OGC_FID":1966,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001124","districtbaladi":"10007801","duration":null,"elevation":null,"globalid":"{795A6C89-41BD-466C-B5E7-F674E5A4F9DF}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1967","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27887,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200112400087","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2342,21.5877]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1967,"OGC_FID":1967,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001124","districtbaladi":"10007801","duration":null,"elevation":null,"globalid":"{4B32AE4C-AE6B-41F7-A2C8-053B85B6F348}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1968","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27888,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200112400088","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2448,21.5949]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1968,"OGC_FID":1968,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001124","districtbaladi":"10007801","duration":null,"elevation":null,"globalid":"{77283C56-DC18-4290-BA26-EF0A22489157}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1969","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27889,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200112400089","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2457,21.594]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1969,"OGC_FID":1969,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001124","districtbaladi":"10007801","duration":null,"elevation":null,"globalid":"{F88B3D1D-829F-4ACD-97BE-C14D23FBBC6F}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1970","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27890,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200112400090","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2331,21.582]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1970,"OGC_FID":1970,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001124","districtbaladi":"10007801","duration":null,"elevation":null,"globalid":"{5143FA59-6306-4EF9-90D4-A7E19489968C}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1971","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27891,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200112400091","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2298,21.5891]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1971,"OGC_FID":1971,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001124","districtbaladi":"10007801","duration":null,"elevation":null,"globalid":"{FAE8AC9C-5F99-45D7-B62B-B988B2FBD262}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1972","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27892,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200112400092","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2511,21.5918]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1972,"OGC_FID":1972,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001124","districtbaladi":"10007801","duration":null,"elevation":null,"globalid":"{32991B21-14ED-4174-BB8B-9C610A809651}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1973","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27893,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200112400093","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2398,21.5792]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1973,"OGC_FID":1973,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001124","districtbaladi":"10007801","duration":null,"elevation":null,"globalid":"{8C977BC0-7C2F-47CC-91F6-49D71536B870}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1974","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27894,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200112400094","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2299,21.5886]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1974,"OGC_FID":1974,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001124","districtbaladi":"10007801","duration":null,"elevation":null,"globalid":"{B9055F71-18F4-4DEB-8BF8-ED1919F1CEDA}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1975","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27895,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200112400095","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2437,21.5803]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1975,"OGC_FID":1975,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001124","districtbaladi":"10007801","duration":null,"elevation":null,"globalid":"{8050F5E2-3604-4D08-B74C-50C2DBFAEFCC}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1976","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27896,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200112400096","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2464,21.5931]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1976,"OGC_FID":1976,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001124","districtbaladi":"10007801","duration":null,"elevation":null,"globalid":"{1D56C029-1C6F-4421-9442-31E9E38847C2}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1977","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27897,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200112400097","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2523,21.5901]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1977,"OGC_FID":1977,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001124","districtbaladi":"10007801","duration":null,"elevation":null,"globalid":"{A429B525-F35F-46C0-A09A-7853C1B09227}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1978","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27898,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200112400098","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2331,21.5788]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1978,"OGC_FID":1978,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001124","districtbaladi":"10007801","duration":null,"elevation":null,"globalid":"{7250F1A8-71E9-47DD-B91F-A0082E94A405}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1979","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27899,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200112400099","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2384,21.5808]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1979,"OGC_FID":1979,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001124","districtbaladi":"10007801","duration":null,"elevation":null,"globalid":"{5357EB9E-3063-4A95-A99E-B311C8B2CFB9}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1980","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27900,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200112400100","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2385,21.5882]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1980,"OGC_FID":1980,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001124","districtbaladi":"10007801","duration":null,"elevation":null,"globalid":"{54BBD70B-16ED-4C8C-AB04-2E0BBF93D6BF}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1981","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27901,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200112400101","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2389,21.5798]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1981,"OGC_FID":1981,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001124","districtbaladi":"10007801","duration":null,"elevation":null,"globalid":"{B29B5EC6-8ACD-4721-A2B3-BCDC05131EE3}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1982","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27902,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200112400102","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2454,21.5951]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1982,"OGC_FID":1982,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001124","districtbaladi":"10007801","duration":null,"elevation":null,"globalid":"{BE4C4BF0-3BF1-411A-9C77-5277B899AF5C}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1983","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27903,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200112400103","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2449,21.576]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1983,"OGC_FID":1983,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001124","districtbaladi":"10007801","duration":null,"elevation":null,"globalid":"{E66F091B-21ED-41FF-A7D8-53E96E98D3DA}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1984","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27904,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200112400104","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2353,21.5835]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1984,"OGC_FID":1984,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001124","districtbaladi":"10007801","duration":null,"elevation":null,"globalid":"{751EFF57-9E3C-4AED-9D47-A12D4834DDA0}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1985","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27905,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200112400105","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2481,21.5913]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1985,"OGC_FID":1985,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001124","districtbaladi":"10007801","duration":null,"elevation":null,"globalid":"{836641C0-FE02-44BC-A74A-C87669D6C06A}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1986","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27906,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200112400106","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2344,21.5915]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1986,"OGC_FID":1986,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001124","districtbaladi":"10007801","duration":null,"elevation":null,"globalid":"{396BBAFC-3C46-4BDD-9C76-025385D12AF6}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1987","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27907,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200112400107","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2424,21.59]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1987,"OGC_FID":1987,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001124","districtbaladi":"10007801","duration":null,"elevation":null,"globalid":"{98C00A04-8317-43DB-ACFD-5BABAE9F11C4}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1988","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27908,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200112400108","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2366,21.5814]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1988,"OGC_FID":1988,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001124","districtbaladi":"10007801","duration":null,"elevation":null,"globalid":"{6D20D4F5-2C05-4C82-85BE-784BF7022845}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1989","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27909,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200112400109","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2318,21.5889]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1989,"OGC_FID":1989,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001124","districtbaladi":"10007801","duration":null,"elevation":null,"globalid":"{756ED9D9-5351-45F1-AB20-812CCFADE334}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1990","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27910,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200112400110","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2484,21.5922]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1990,"OGC_FID":1990,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001124","districtbaladi":"10007801","duration":null,"elevation":null,"globalid":"{8B937F71-103A-4BF4-82DB-56679770683F}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1991","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27911,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200112400111","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2377,21.588]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1991,"OGC_FID":1991,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001124","districtbaladi":"10007801","duration":null,"elevation":null,"globalid":"{B0FB582C-08FE-4E4F-B91E-9B1280C9871D}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1992","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27912,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200112400112","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2451,21.5924]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1992,"OGC_FID":1992,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001124","districtbaladi":"10007801","duration":null,"elevation":null,"globalid":"{14E877FF-4636-44AE-944A-F0DE1FC21997}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1993","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27913,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200112400113","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2441,21.5921]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1993,"OGC_FID":1993,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001124","districtbaladi":"10007801","duration":null,"elevation":null,"globalid":"{2A2F3850-34B6-485C-893F-1C29E425DDE0}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1994","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27914,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200112400114","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.231,21.5868]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1994,"OGC_FID":1994,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001124","districtbaladi":"10007801","duration":null,"elevation":null,"globalid":"{C6483CF7-7DBD-4B72-9B65-47841E76BE30}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1995","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27915,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200112400115","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2455,21.5915]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1995,"OGC_FID":1995,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001124","districtbaladi":"10007801","duration":null,"elevation":null,"globalid":"{21939AC0-77E1-4521-96FD-267F33CA8AE3}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1996","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27916,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200112400116","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2381,21.5871]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1996,"OGC_FID":1996,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001124","districtbaladi":"10007801","duration":null,"elevation":null,"globalid":"{A62861BE-DD77-4762-B6B4-E14AE1B44824}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1997","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27917,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200112400117","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.233,21.5826]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1997,"OGC_FID":1997,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001124","districtbaladi":"10007801","duration":null,"elevation":null,"globalid":"{DD7243B2-B63E-42E7-96D4-C8208524234D}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1998","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27918,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200112400118","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2306,21.5887]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1998,"OGC_FID":1998,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001124","districtbaladi":"10007801","duration":null,"elevation":null,"globalid":"{9BB21013-79A6-4ECB-8E23-B2A311FE0B08}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.1999","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27919,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200112400119","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2449,21.5938]],"spatialReference":{"wkid":4326,"latestWkid":4326}}},{"attributes":{"OBJECTID":1999,"OGC_FID":1999,"amana_id":"00203","amanabaladi":"005001","amanatracking":null,"approvedby":null,"city_id":null,"consultant":null,"contractboundary":null,"contractnumber":null,"contractor":"Shibh Aljazira","created_date":1625643917000,"created_user":"FME","dataowner":"أمانة محافظة جدة FME","datasource":"ManholeProjects","dateofend":1388350800000,"dateofendcontract":1388350800000,"dateofstart":1293829200000,"dateofstartcontract":null,"description":null,"designed":null,"district_id":"002001124","districtbaladi":"10007801","duration":null,"elevation":null,"globalid":"{4152AEC5-9DF7-47D4-9E1E-3D3256036FD5}","governorate_id":"00202","id":"planning-and-land-and-cadastre_aBX49465980.2000","last_edited_date":1625643917000,"last_edited_user":"FME","municipality_id":"002001","municipalitybaladi":"005001011","objectid_1":27920,"projectbudget":null,"projectcentroid_id":"S3- 12621","projectcentroid_unified_id":"00200112400120","projectname_ar":null,"projectname_en":null,"projectnumber":null,"projectstatus":null,"projecttype":null,"region_id":"002","sde.poprojectcentroidp.area":null,"sector_id":null,"siteobserve":null,"streetname":null,"subcontractor":null,"submunicipality_id":null,"transactionnumber":null,"zonetype":null},"geometry":{"points":[[39.2323,21.5831]],"spatialReference":{"wkid":4326,"latestWkid":4326}}}]}